    In this video Mr Dilip will be explaining the approval cost, the procedure involved and documents required to get building plan approval in Chennai. He details explains the difference between various govt. approval bodies and procedures involved in it.
    Time stamp :
    00:14 Introduction
    01:20 Approval process for Corporation
    04:35 Approval process for Panchayat
    04:46 Difference between planning and building permit
    05:49 Planning permit procedure
    06:46 Building permit procedure
    07:10 Time taken for approval
    08:27 Cost advice slip for corporation
    09:34 Cost advice slip for Panchayat
    10:34 Summary of Building plan approval cost
    #buildingplanapprovalchargesintamilnadu #howtogetbuildingplanapprovalchennaicorporation #buildingplanapprovalfeesonlinepayment #howtoapplybuildingplanapprovalinchennai #buildingplanapprovalcostinchennai #howtogethouseplanapproval #whatarethedocumentsrequiredforbuildingplanapproval #buildingplanapproval #buildingplanapprovalrulesintamil #buildingplanapprovalfeescalculator #buildingplanapprovalvillagepanchayat #builderinchennai
    Contact HireandBuild at 7200472008 or visit www.hireandbuild.com to build the best quality house at the best price.
    For appointments call:
    7200472008/7200870088
    Office Address: No 87A, Nolambur phase-II, (Above Talon Studio), Mogappair West, Chennai - 60003
  • ХоббиХобби

Комментарии • 455

  • @vinodkumar9420
    @vinodkumar9420 3 года назад +11

    Amazing Video Bro ❤️

  • @MaraThamizhan
    @MaraThamizhan 3 года назад +71

    All civil engineers, planners and builders should come together and voice for transparent processes that will provide approval without bribe/corruption and within a time frame. Without that no use of living in "independent" India.

    • @venkatesharun2c2
      @venkatesharun2c2 2 года назад +6

      True sir.... All govt offices it's happening 😞 EB alone can take sir how much they asking bribe 🤦 even from common people...

    • @dinnasivamugam1885
      @dinnasivamugam1885 2 года назад +1

      Exactly sir

    • @srivatsansubramanian9494
      @srivatsansubramanian9494 2 года назад +5

      That is correct sir..eventhough registration process is introduced in online..still we have to bribe those officials..and hard earned money is going to these culprits.

    • @venkatvignesh106
      @venkatvignesh106 2 года назад +1

      Hi sir I submitted the documents for approval in medavakkam area nearly it was more than 2 years before but every time they are saying documents missing second time submitted in February 2021 but still again they are telling documents missed again I don't know why these happen

    • @senthilkumar-ol4bx
      @senthilkumar-ol4bx 2 года назад +2

      @@venkatvignesh106 Hi Mr. Venkat. It's so easy please give under table dealing with concern officer's and A. E,You will get second week with your missing document's with approved...

  • @hariharasudhannayar411
    @hariharasudhannayar411 3 года назад +2

    Thanks Bro. Much Appreciated.

  • @ytsmcsmcm
    @ytsmcsmcm 2 года назад +2

    truly amazing bro :)) Thanks

  • @kamalanahthanraarumugam4794
    @kamalanahthanraarumugam4794 3 года назад +1

    Really interesting and informative. Thanks

  • @vishnuchandrasekar7204
    @vishnuchandrasekar7204 3 года назад +1

    Very useful video .. thanks!

  • @thomaswalker8790
    @thomaswalker8790 2 года назад

    Great! It's a real eye opener

  • @jrakeshbe
    @jrakeshbe 3 года назад +2

    Very nice explanation... Great job.

  • @naveenkumarnaveen7022
    @naveenkumarnaveen7022 3 года назад +1

    Thank you for the information sir.

  • @NaveenKumar-zx2ml
    @NaveenKumar-zx2ml 2 года назад +2

    Good information bro... keep going....all the best 👍

  • @50rameshj
    @50rameshj 2 года назад +1

    Excellent... Very informative

  • @drsmusic5328
    @drsmusic5328 Год назад

    Very helpful and detailed video info, Thanks so much brother.

  • @venkatvenkat6274
    @venkatvenkat6274 2 года назад +1

    Thank You SIR , Useful important Video - V.V.C

  • @venkatesanm3027
    @venkatesanm3027 3 года назад +12

    Impressive. That escape moment from telling the truth about commission. Expecting a lot from your channel.

    • @johnm3938
      @johnm3938 3 года назад +6

      Full corruption
      Without bribe no work will happen

    • @umamaheswari604
      @umamaheswari604 Год назад

      @@johnm3938 exactly.

    • @umamaheswari604
      @umamaheswari604 Год назад

      Yes. Without commission nothing will happen in tn govt

  • @chinnasamyramesh1520
    @chinnasamyramesh1520 3 года назад +2

    Thanks for open talk

  • @umarbathusha9292
    @umarbathusha9292 3 года назад +3

    Final dialog sema bro..

  • @gouthamd8458
    @gouthamd8458 Год назад

    Very very useful sir. Thank you

  • @jebassundar9433
    @jebassundar9433 3 года назад +2

    ❤️ superb

  • @manoharana7364
    @manoharana7364 2 года назад +24

    அரசு ஒப்புதல் இல்லாமல் வீடு கட்டகூடாது என்பது சட்டம் . சட்டப்படி ஒப்புதல் கொடுக்க லஞ்சம் எதற்காக
    .

    • @lokeshgnanasekar
      @lokeshgnanasekar 2 года назад +3

      this is India not the US 🤣🤣🤣

    • @manoharana7364
      @manoharana7364 2 года назад +3

      இந்தியாவில் லஞ்சம் கொடுத்தால்தான் காரியம் நடக்கும் என்பது எழுதப்படாத சட்டம்

    • @rahulkrish9840
      @rahulkrish9840 2 года назад

      @@lokeshgnanasekar Everything can change

    • @umamaheswari604
      @umamaheswari604 Год назад

      Lanjam kodutha thaan Vela nadakkuthu. This is Dravida model.

    • @umamaheswari604
      @umamaheswari604 Год назад

      @@rahulkrish9840 but tn people take bribe for voting and expect freebies. Nothing going to change unless people mentality change and stop voting corrupted politician

  • @deeparamesh1336
    @deeparamesh1336 3 года назад +3

    As per your video G+2 may be 1000 sqft means 1 lak based on sqft multiple with 100 correct.

  • @adhithiyant2868
    @adhithiyant2868 3 года назад +2

    Good work sir

  • @divahartirumurthy2219
    @divahartirumurthy2219 3 года назад +2

    Nicely explained

  • @sabarikrishna5874
    @sabarikrishna5874 2 года назад +1

    Nice explanation bro

  • @giridharans6512
    @giridharans6512 2 года назад +10

    There should be transparency in all process for general public, as per Govt norm they have already fixed the amount for all process, but due to under the table formalities good things is not happening... Without knowing the people's pain and their hard earning why we should pay extra amount... do they are not paying for there service government... This really unacceptable.. any how the topic Good 👍

    • @saleemkh42
      @saleemkh42 2 года назад +1

      EVERY ONE TAKE PLEDGE NOT TO PAY ANY BRIBE,

    • @sakthipriya2826
      @sakthipriya2826 2 года назад

      Exactly if everyone stops then only there will be an end ..

    • @umamaheswari604
      @umamaheswari604 Год назад

      Yes. Those who are taking bribe never realise that this is going to be curse on them and their families. I gave bribe 12000/- for getting patta name transfer work to manimangalam vo two years back. After troubling me fir one year he did my job inspite of taking under table. Even today I pray God that he and his family should suffer. My stomach is burning. These corrupted people will not have peaceful life at the end of their living

    • @umamaheswari604
      @umamaheswari604 Год назад

      @@saleemkh42 that is not practical

    • @Hireandbuild
      @Hireandbuild  5 месяцев назад

      Thanks for Expressing your views👍..

  • @dkjeeva
    @dkjeeva 3 года назад +2

    Good info Bro

  • @rajaveerappa8418
    @rajaveerappa8418 3 года назад +3

    super sir,

  • @Raja00727
    @Raja00727 3 года назад +32

    Because of corruption u cannot say the exact amount?that’s what he is symbolically saying.All corrupted

    • @perfectgameraj
      @perfectgameraj 2 года назад +2

      THEY ARE NOT CORRUPTED, ITS WE WHO CORRUPT THEM BECOZ OF OUR URGENCY.....DEVIATION... AND GREED.....

  • @subinraj4488
    @subinraj4488 2 года назад +2

    Thanks bro

  • @firegaming-ds6gf
    @firegaming-ds6gf 2 года назад

    Thank you sir

  • @kumaravelbkumaravel1820
    @kumaravelbkumaravel1820 2 года назад

    Super explanation

  • @syedismail3253
    @syedismail3253 2 года назад +3

    Matra sila Pala charges... 😃😃 Super bro

  • @arvilochanan
    @arvilochanan 2 года назад +5

    Thanks a lot for a frank and detailed post..I have been watching your posts quite often ..the transparency with which you share the knowledge /info is commendable..keep up the good work ..wishing you all the very best..

    • @Hireandbuild
      @Hireandbuild  2 года назад

      Thanks a lot for your kind words sir. Keep watching!

  • @vishnucharanrajan7194
    @vishnucharanrajan7194 2 года назад

    Good informative video

  • @mohammedazfar918
    @mohammedazfar918 2 года назад

    @hireandbuild - is it mandatory land approvals are required for building/plan approval ?

  • @sathyabama2222
    @sathyabama2222 2 года назад

    Very excellent

  • @sbmleo
    @sbmleo 2 года назад

    Very useful

  • @aravindm1285
    @aravindm1285 3 года назад +1

    I have 2 queries..
    1)Can we get a building approval for a existing house
    2)What if the construction deviates the building plan..any ways to update the existing plan.

    • @Hireandbuild
      @Hireandbuild  3 года назад +1

      No, we cannot get approval for an existing building

  • @kannana1800
    @kannana1800 2 месяца назад +1

    Very nice

  • @kishorekumar-ru6ub
    @kishorekumar-ru6ub 3 года назад

    Can we buy pp plot realtor is telling after one year they can sale with the confirmation from CMDA, please advise

  • @s.r4090
    @s.r4090 2 года назад

    Super nice Bro

  • @muthu1292
    @muthu1292 3 года назад +2

    Super sir.. yesterday only I asked you. Today got your video

  • @mercury-ke7vj
    @mercury-ke7vj 2 года назад

    Super bro

  • @Sikharanandjain
    @Sikharanandjain 2 года назад

    It's decided
    U r going to build my dream house 🏠

    • @Hireandbuild
      @Hireandbuild  2 года назад

      Glad to hear that. Thanks a lot for your support :)

  • @kudilagaminteriors-phiferm7390
    @kudilagaminteriors-phiferm7390 3 года назад +3

    how to avoid lanjam or corruption in civil field? oru vdeo podunga sago.. It will be very useful to many of them..

    • @a.sahayaraj7398
      @a.sahayaraj7398 2 года назад +1

      வாய்பில்ல ராஜா

  • @gibinthomas8262
    @gibinthomas8262 2 года назад

    Informative video sir🎉,sir I have small doubt I have 20*30 plot in korattur,is it is the same process for 600 sqft land also, some one says approval for 600 sqft land not available please reply thank you

  • @a.mohangandhi3695
    @a.mohangandhi3695 3 года назад +2

    👍

  • @kannana1800
    @kannana1800 2 месяца назад +1

    Correct

  • @KnowYourGamer
    @KnowYourGamer 2 года назад +1

    How long is the approval valid? Can the validity be extended?

  • @vinju431
    @vinju431 2 года назад +2

    Hi sir, pls help me in finalizing the per square feet rate with contractor, as contractor has finalised for 2000/sqft, but now I want the home to be build with AAC and gypsum plastering inside my house, so how to bring down sq ft rate?

    • @Hireandbuild
      @Hireandbuild  2 года назад

      If they have experience in building with AAC blocks and gypsum plastering they will know the exact cost and reduce sir, if not they won't

  • @bobbytables1
    @bobbytables1 2 года назад +3

    Dear Sir, I have a onroad property in Vandalur - Kelambakkam road, Kolappakkam, It comes under Nedumkundram Panchayat, Vandalur taluk. What kind of approval is required to do commercial construction?

    • @Hireandbuild
      @Hireandbuild  2 года назад

      Construction approval is required, please contact the panchayat office

  • @vijaysrinivasan6362
    @vijaysrinivasan6362 3 года назад +2

    Good one Dilip. Remember we discussed this when we met you recently and we encouraged you to make a video on this topic :) Talk to you soon!

    • @Hireandbuild
      @Hireandbuild  3 года назад

      Yes sir, got this idea after the discussion with you. Thanks to you :)

  • @Enakkutherinchathu
    @Enakkutherinchathu 2 года назад +1

    Nice video ,its not building approval its bribe approval

  • @shankard7296
    @shankard7296 3 года назад +5

    Sir, you have mentioned the Set Back requirement for Corporation limit plot approval, Can you please provide setback details for outside corporation limit like Madambakkam, medavakkam areas etc.,

    • @Hireandbuild
      @Hireandbuild  3 года назад

      It will vary based on your location sir, it can be decided at the time of planning after checking your documents only

    • @hariprasath6211
      @hariprasath6211 Год назад

      After tamilnadu combined rules 2019. that setback norms is same for all municipalities.corporation ,bdo in tamilnadu

  • @ravicharans7733
    @ravicharans7733 3 года назад +3

    Out standing presentation sir tq with santhosam vmnm9

  • @athikesu8
    @athikesu8 Год назад +1

    Planning permit and building permit in panchayat will be given in the respective panchayat office Itself?

  • @damodharankannan5801
    @damodharankannan5801 Год назад +1

    we understand

  • @bhuvanendar
    @bhuvanendar 2 года назад +4

    Sir I have a plot in gerugambakkam back side of Porur ...plot size 20* 60 what is the set back for it .. as 20ft itself is very less how can avail 5ft

    • @Hireandbuild
      @Hireandbuild  2 года назад

      It can be checked after seeing the land documents only sir

  • @jithucoffee
    @jithucoffee 3 года назад +3

    I spent close to 2 lakhs for getting an approval.... Since we didn't wanted to pay they gave stop notice...

  • @sureshv400
    @sureshv400 3 года назад

    Thank you for the information
    In Village they say no need for approval
    The olden days houses no approval
    What is the best can be done.

    • @Hireandbuild
      @Hireandbuild  3 года назад

      Now it's mandatory in cities sir.

  • @pca051
    @pca051 2 года назад +1

    Excellent video.
    In Perambur PaperMills Road how much road widening will happen sir. Pls guide me

  • @vijiguru3035
    @vijiguru3035 2 года назад

    Super

  • @manikanthan4693
    @manikanthan4693 2 года назад +1

    Sir!
    My house is located in Chennai Copn limit located abutting 65 ft road. Planning construct permissible level of floors with 3 bed room flats above the existing building which is 26 yrs old spreading 1357 sq. ft area. Pl advise the following:
    1. Whether you can inspect the bulds for verifying its structural strength.
    2. Whether construction above existing bulds is permisdble?
    3. How many floors will be allowed to construct.
    4. Whether construction will be undertaken by you. If so, cost of construction and materials & facilities will be provided.
    After hearing from you, I will come in contact for further discussion. Pl reply.

  • @ranjithanbalagan
    @ranjithanbalagan 2 года назад +2

    Process is hectic and too much of bribe ..shameless people working in corporation . They need to be arrested or if the state government is having guts and if they are really concerned on the people.and honest , outsource this process to private sector company with some contract agreement. We don't want any government staff for this process

    • @Hireandbuild
      @Hireandbuild  5 месяцев назад

      Thanks for Expressing your views

  • @chrisdaniel8327
    @chrisdaniel8327 2 года назад

    Simple answer to all per sqft 100 rs for commercial. 30-40 for residential approval

  • @gokullub7798
    @gokullub7798 2 года назад

    What are the benifit for plan approval?

  • @abdullahulk86
    @abdullahulk86 2 года назад +2

    what to do for already constructed house on land received from slum clearance board. is it possible to get approval>

  • @vijayakumarm9263
    @vijayakumarm9263 Год назад

    Nice video bro. Any restrictions of new construction near backwaters omr chennai

    • @Hireandbuild
      @Hireandbuild  Год назад

      Thank you sir.
      Please kindly contact the below number for
      more information.
      +91 7200472008 or visit www.hireandbuild.com

  • @nithishkumar6706
    @nithishkumar6706 3 года назад +1

    Sir epo again dtcp approval online registration open panuvaga

  • @pvparthasarathy
    @pvparthasarathy 3 года назад +2

    Highlight is 10.50. In document road cut charges and demolition fee iruku its just for approval or will they will demolish and cut road ?

  • @daivasigamani366
    @daivasigamani366 3 года назад +2

    Currently what is the contract rate for per sq ft in redhills for standard specification?

    • @Hireandbuild
      @Hireandbuild  3 года назад +1

      Please check the construction calculator tool here hireandbuild.com/construction-cost-calculator-free-online/

    • @daivasigamani366
      @daivasigamani366 3 года назад

      @@Hireandbuild but the prices are changed nah, or is the same you are following after the price hike

  • @afneenofficial7034
    @afneenofficial7034 2 года назад +2

    #hireandbuild Nice Video, Are we allowed to build house without setback for 19.6*59 plot area, I am in Parivakkam Poonamalle. Can you suggest so that we can approach you later when we plan?

    • @Hireandbuild
      @Hireandbuild  2 года назад +1

      It can be checked after seeing the plot documents only sir

  • @arunkumar-qx1ib
    @arunkumar-qx1ib 3 года назад +2

    😊😊😊

  • @lakshanasethu3499
    @lakshanasethu3499 2 года назад +1

    Does there require for Plan & building approval for sheet metal roof or asbestos roof for village side ( Natham)

    • @Hireandbuild
      @Hireandbuild  2 года назад

      No, its not required

    • @rubytraders4926
      @rubytraders4926 2 года назад

      @@Hireandbuild bro steel sheet potu pandradhuku...Namakkal municipality limit la varudhu.. adhuku evlo ketpaanga

  • @saranmdg3059
    @saranmdg3059 2 месяца назад

    Bro madavaram ula angaluku 600sqft edam eruku edam cmda apporved adula 400sqft ground floor kata apporved kudupangala please solunga bro

  • @jawaharjn5436
    @jawaharjn5436 3 года назад +1

    commercial shop 43*15 la shop construct panathuku evlo agum and which way of construction is best and economy?? plz tell us sir

    • @Hireandbuild
      @Hireandbuild  3 года назад

      Please check the construction calculator tool here hireandbuild.com/construction-cost-calculator-free-online/

  • @kumarankrishna9033
    @kumarankrishna9033 2 года назад +1

    Respected sir,
    How to get CMDA approval and building plan for a patta land in Thiruninravur, Chennai

    • @Hireandbuild
      @Hireandbuild  2 года назад

      Kindly contact the local approval office, they will check your document and update you

  • @markjackson8219
    @markjackson8219 2 года назад +1

    can we modify house plan which is within the approved Sqft after CMDA approval.

    • @Hireandbuild
      @Hireandbuild  2 года назад

      Depends upon the project size and location sir

  • @shivabalaji6139
    @shivabalaji6139 2 года назад +1

    Sir as per approved plan is there is any building constructed. If we have to leave so much space on each side and front area can anyone construct

    • @Hireandbuild
      @Hireandbuild  Год назад

      Sorry sir, We can't understand your question.

  • @sKids-sw7ub
    @sKids-sw7ub 2 года назад

    If the approvel is needed for only 700 sq ft above it is true?

  • @nambigai9459
    @nambigai9459 Год назад

    We knew lot of corruption doing by chennai corporation, Government need to do some actions..

    • @Hireandbuild
      @Hireandbuild  Год назад

      Addressing corruption is crucial for a transparent and accountable government. Citizens should raise awareness and demand action to combat corruption in public institutions.

  • @sureshs3008
    @sureshs3008 2 года назад

    What is the different between corporation and CMDA approval and which case we need to go for CMDA

    • @Hireandbuild
      @Hireandbuild  2 года назад

      It depends upon the land location

  • @MURALIKRISHTV
    @MURALIKRISHTV 3 года назад +1

    Nice g 🔥🔥🔥👍 g

  • @mohamedkasim6613
    @mohamedkasim6613 Год назад

    Sir, 600 square feet home purpose building kum Approvals vanganuma sir.... Need explain sir ....

  • @venkatvenkat6274
    @venkatvenkat6274 2 года назад +1

    how to draw On Line building plan , please explain sir , Thank You - V.V.C

    • @Hireandbuild
      @Hireandbuild  2 года назад

      Sure sir, thanks for your suggestion

  • @HARRISHSB
    @HARRISHSB Год назад

    Corporation approval is only enough or cmda approval not required for re construction building

  • @saleemkh42
    @saleemkh42 2 года назад +1

    Bro, you said front side 10 feet and other three sides 5 feet space to be left open, is there any building in any city is constructed in that manner. In cities buying a 600 sqft place is a herculion task for any ordinary person , how it possible to get approval for such plot.

    • @Hireandbuild
      @Hireandbuild  2 года назад

      Apartments and most buildings which are being built inside city limits are built that ways sir.

  • @Karthik-kq8tg
    @Karthik-kq8tg 2 года назад +1

    For panchayats, will there be any vacant land tax if you buy a plot and plan to construct?

    • @Hireandbuild
      @Hireandbuild  2 года назад +1

      No sir, but it may vary for certain locations

    • @geethasekar3621
      @geethasekar3621 9 месяцев назад

      Vct is for corpopration limit

  • @PrabhuKR
    @PrabhuKR 2 года назад +1

    Hi Sir, shall we make any minor alterations to layout like changing door facing and resize room after getting approval? Do weed net to again get permission from CMDA and if so any cost is involved?

    • @Hireandbuild
      @Hireandbuild  2 года назад

      Yes we can make those changes without any permission from CMDA sir

    • @kavirajguru9444
      @kavirajguru9444 2 года назад +1

      No, they giving only permission for the total area and ventilation of building.
      Not for facing of house
      Resize of rooms not exceeding the total plinth area

  • @suganthiramesh628
    @suganthiramesh628 2 года назад +1

    Sir, 4 to 5 kitchen 40×60 approximately plan and building approval charges in corporation limits.

    • @Hireandbuild
      @Hireandbuild  2 года назад

      You can expect around 5-6 lakhs totally mam

  • @sampathnarayanan7190
    @sampathnarayanan7190 3 года назад +1

    Prengalathur comes under CMDA only i.e wthin corporation limit only

    • @Hireandbuild
      @Hireandbuild  3 года назад

      CMDA is different and corporation is different

  • @vmurugan100
    @vmurugan100 3 года назад +1

    Bro, i have patta land with building in karapakkam, can i get land approval and building approval for existing building

  • @aadityastechworld5959
    @aadityastechworld5959 3 года назад +1

    i'm clearly understanding the extra charges, thing is how much cost's will be charged extra not by you but other, just asking fo knowlodge, i know it differs eventhough under what circumstances what will be the price, because we should have clear mind when our licensed surveyor askes for extra charge, so kindly explain in discrete manner. if possible

  • @mohannarasiman7017
    @mohannarasiman7017 3 года назад +1

    Bro, plan Approval and building Approval are must for before construction?

  • @anbum930
    @anbum930 2 года назад +2

    Hello Sir... Licensed Engineer (Plan Approval Engineer) Certificate apadi vanga vendam nu oru video upload panunga sir

    • @a.sahayaraj7398
      @a.sahayaraj7398 2 года назад

      வாய்ப்பில்ல ராஜா

  • @anithab8002
    @anithab8002 2 года назад +1

    If demand advice is provided.. Shall a builder can consider as a approval. Else after that how long they need to wait

    • @Hireandbuild
      @Hireandbuild  2 года назад +1

      Approval will be given in 1 week after the fees has been paid

  • @letchumanant5319
    @letchumanant5319 Год назад

    Bro na fresher.,2021 passout .na conceptual plan pothu kudhukalam nu idea irukku engineering license irundha ta panna mudhiyuma illa ippovum panalama

  • @sriveerapandiyaayyanarspor7891
    @sriveerapandiyaayyanarspor7891 2 года назад +2

    Sir intha panyathu apply document kodunga PDF kodunga sir

  • @kishorebaskar2522
    @kishorebaskar2522 2 года назад +1

    Hi sir,
    Are v able to get the approval for 838 sqft in cmda limit

  • @krishnasamypunusamy9314
    @krishnasamypunusamy9314 2 года назад

    If it's a agricultural land. I want to build house in 2 ground in Chennai. Can your company assist in getting residential approval first. Then Hireandbuild can build our house as planned

    • @theroadgaming09
      @theroadgaming09 2 года назад

      You need reclassification to residential for agri land followed by approval. Only then you can move to building and plan approval.

    • @Hireandbuild
      @Hireandbuild  Год назад

      Please kindly contact the below number for
      more information.
      +91 7200472008 or visit www.hireandbuild.com

  • @vaidyalingamvenkatasubban925
    @vaidyalingamvenkatasubban925 3 года назад +1

    How about vacant land tax? Is it be approved by the Govt.? How much percentage or at rate at which this is levied.

    • @Hireandbuild
      @Hireandbuild  3 года назад

      Yes sir, govt. will charge based on the no. of years the land tax hasn't been paid

    • @vaidyalingamvenkatasubban925
      @vaidyalingamvenkatasubban925 3 года назад

      @@Hireandbuild Thank you for information. But that tax is not uniform in all the places. So raised this. Thanks.