Your videos are very useful and fully appreciated. i have a small clarification regarding the PC rate and provisional sum items, from my expereince not all PC rate and PS items need to be nominated unless the contract specifically states so, correct me if i am wrong
Usually these will be done by Nominated sub contractor. Hence the provision for same. If contract specifies the contractor itself to carry out the work, then it will be their responsibility. But ultimately these are priced at later stages.
Does the PC rate remains fixed? Why the contractor will require invoice from supplier to determine the price when it's already mentioned in BOQ? And does it always means that PC rate is the price of only supply of material..and thus it by default means that main contractor scope will be excluding supply of that material?
Very informative, thanks a lot. Below are some of my doubts, I will be thankful, if you can reply. 1) what about the cost of builders work / civil work / indirect work for executing the works listed under PC & PS items? 2) Is Project duration depends on PC & PS Items? 3) If there is a change in the amount or list of items of PC & PS Amount, how it will be treated? 4) What assistance is to be allowed by the Contractor for PS & PS amount items subcontractors Thanks
1. It should be included while pricing it 2. It should also be considered. 3. Depending on actual usage, the final amount can reduce or increase. 4. Attendance and coordination percentage can be claimed by main contractor.
Very useful video, highly recommended.
Wonderful explain and easy to catch..keep rock...all the best
Thanks a lot
Very informative. Great presentation.
Thanks a lot !!!
Very informative, Good job bro 👍👍
Thanks a lot.
Very use full thank a lot
You are welcome !!
Very useful and informative video.....
Thanks a lot for the positive feedback!!
Good work , keep it up !
Thanks a lot !!!
Super informative
Thanks a lot !!!
Hello sir how can we calculate preliminaries breakdown sheet rates
That depends on the quotations and bills of different utilities.
@@QuantitySurveyingStudio sir please make a video on preliminary breakdown sheet 🙏🙏🙏🙏
Very Helpful..
Glad to hear that
very useful. pls upload related to cesmm explanation videos is possible.
Have already uploaded
Superb
Thanks a lot !!
The nominated sub contractor will be contractually dealing directly with the client or their contract will be with main contractor?
Contract will be between main contractor and NSC but the NSC will be decided by client.
Your videos are very useful and fully appreciated. i have a small clarification regarding the PC rate and provisional sum items, from my expereince not all PC rate and PS items need to be nominated unless the contract specifically states so, correct me if i am wrong
Usually these will be done by Nominated sub contractor. Hence the provision for same. If contract specifies the contractor itself to carry out the work, then it will be their responsibility. But ultimately these are priced at later stages.
Does the PC rate remains fixed? Why the contractor will require invoice from supplier to determine the price when it's already mentioned in BOQ?
And does it always means that PC rate is the price of only supply of material..and thus it by default means that main contractor scope will be excluding supply of that material?
Thank you.
You are welcome
Very informative, thanks a lot.
Below are some of my doubts, I will be thankful, if you can reply.
1) what about the cost of builders work / civil work / indirect work for executing the works listed under PC & PS items?
2) Is Project duration depends on PC & PS Items?
3) If there is a change in the amount or list of items of PC & PS Amount, how it will be treated?
4) What assistance is to be allowed by the Contractor for PS & PS amount items subcontractors
Thanks
1. It should be included while pricing it
2. It should also be considered.
3. Depending on actual usage, the final amount can reduce or increase.
4. Attendance and coordination percentage can be claimed by main contractor.
Quality video
Thanks a lot for the positive feedback!!
Great
Thanks a lot !!
Is the preamble is made by QS?
Yes.