The 4 "P" Know-What for a Quantity Surveyor | Preliminaries, Provisional Sum, Prime Cost, Preamble

Поделиться
HTML-код
  • Опубликовано: 20 янв 2025

Комментарии • 41

  • @bondfazil007
    @bondfazil007 4 года назад +2

    Very useful video, highly recommended.

  • @real_shine
    @real_shine 3 года назад +1

    Wonderful explain and easy to catch..keep rock...all the best

  • @kevinasega282
    @kevinasega282 3 года назад +1

    Very informative. Great presentation.

  • @Adnan.4474
    @Adnan.4474 2 года назад +1

    Very informative, Good job bro 👍👍

  • @manhaseema9590
    @manhaseema9590 2 года назад +1

    Very use full thank a lot

  • @vijaynmr
    @vijaynmr 4 года назад +1

    Very useful and informative video.....

  • @vishwazoysa9100
    @vishwazoysa9100 3 года назад +1

    Good work , keep it up !

  • @salmanameen5959
    @salmanameen5959 2 года назад +1

    Super informative

  • @sabhisaini4518
    @sabhisaini4518 2 года назад +1

    Hello sir how can we calculate preliminaries breakdown sheet rates

    • @QuantitySurveyingStudio
      @QuantitySurveyingStudio  2 года назад

      That depends on the quotations and bills of different utilities.

    • @sabhisaini4518
      @sabhisaini4518 2 года назад

      @@QuantitySurveyingStudio sir please make a video on preliminary breakdown sheet 🙏🙏🙏🙏

  • @amosarockiasamy
    @amosarockiasamy 4 года назад +1

    Very Helpful..

  • @PradeepKumar-sw8hl
    @PradeepKumar-sw8hl 2 года назад +1

    very useful. pls upload related to cesmm explanation videos is possible.

  • @priyajain2013
    @priyajain2013 3 года назад +1

    Superb

  • @mdtouseef6940
    @mdtouseef6940 3 года назад +1

    The nominated sub contractor will be contractually dealing directly with the client or their contract will be with main contractor?

    • @QuantitySurveyingStudio
      @QuantitySurveyingStudio  3 года назад

      Contract will be between main contractor and NSC but the NSC will be decided by client.

  • @john21219811
    @john21219811 3 года назад +1

    Your videos are very useful and fully appreciated. i have a small clarification regarding the PC rate and provisional sum items, from my expereince not all PC rate and PS items need to be nominated unless the contract specifically states so, correct me if i am wrong

    • @QuantitySurveyingStudio
      @QuantitySurveyingStudio  3 года назад +1

      Usually these will be done by Nominated sub contractor. Hence the provision for same. If contract specifies the contractor itself to carry out the work, then it will be their responsibility. But ultimately these are priced at later stages.

    • @mdtouseef6940
      @mdtouseef6940 3 года назад

      Does the PC rate remains fixed? Why the contractor will require invoice from supplier to determine the price when it's already mentioned in BOQ?
      And does it always means that PC rate is the price of only supply of material..and thus it by default means that main contractor scope will be excluding supply of that material?

  • @chilufyachristopher9804
    @chilufyachristopher9804 2 года назад +1

    Thank you.

  • @vepakrishna7513
    @vepakrishna7513 3 года назад +2

    Very informative, thanks a lot.
    Below are some of my doubts, I will be thankful, if you can reply.
    1) what about the cost of builders work / civil work / indirect work for executing the works listed under PC & PS items?
    2) Is Project duration depends on PC & PS Items?
    3) If there is a change in the amount or list of items of PC & PS Amount, how it will be treated?
    4) What assistance is to be allowed by the Contractor for PS & PS amount items subcontractors
    Thanks

    • @QuantitySurveyingStudio
      @QuantitySurveyingStudio  2 года назад +1

      1. It should be included while pricing it
      2. It should also be considered.
      3. Depending on actual usage, the final amount can reduce or increase.
      4. Attendance and coordination percentage can be claimed by main contractor.

  • @qsbestimate3472
    @qsbestimate3472 4 года назад +1

    Quality video

  • @aravindnmdc117
    @aravindnmdc117 3 года назад +1

    Great

  • @jumeenmohamed6589
    @jumeenmohamed6589 3 года назад

    Is the preamble is made by QS?