bellways brought in special corner pieces for the damp tray which done away with a lot of taping shite in the corners otherwise it,s like doing oragamy ...
@@Changy_C anything apart from the weekly measure..i used to get it signed by the site manager,before giving it to the subby...i bet your subby got paid for the 4 they are all the same....
Great use of the tip of the trowel, when offering up a block.👍
bellways brought in special corner pieces for the damp tray which done away with a lot of taping shite in the corners otherwise it,s like doing oragamy ...
Ties need to be every 600mm so there’s 3 ties to a board of kingspan. Its manufacturers stipulation and the NHBC will pull it
Correct but that’s if it’s a 1200mm board. 600mm and don’t stagger them
Great tutoring Chan ( like a teacher ha. . what do the mesh ties connect to ?
Do u prefer ready mix ? than silo ?🤔 and why ....
Thanks 👍
The Weight and feel is better but obviously silo mix is stronger
The mesh connected to the internal wall
@@Changy_C oh interesting...didn't know Silo was a stronger mix . Thanks changy .
thought it was 5 course of blockwork before backing it up ,and you get paid for wind damage ...
Lucky if you get full money anywhere efor wind damage, I had 4 courses go on me and only got paid for 2 for a different subby
@@Changy_C anything apart from the weekly measure..i used to get it signed by the site manager,before giving it to the subby...i bet your subby got paid for the 4 they are all the same....
Check the formers changy might need give it 5m old
be orate at the top ode
Haha thats the one 👍
Cant no fucker build a corner anymore
I'm glad i don't do that type of work anymore. Cavity tray gone mad.
🧱👌
Changy do you get paid for faffing about with those trays ?
I doubt it, we used to only get 50p a metre any how, most ive had is a pound a l/m. Its just one of the extra things you have to do
@@Changy_C do you get paid for bedding the wall plates?
Doubt it but I'd say you should get at least £2-3 per lm for it really