Estimation of residential building Part 3
HTML-код
- Опубликовано: 18 апр 2020
- This video shows how to calculate quantities for interior and exterior plastering, flooring, woodwork and enamel painting, this is the third part of estimation of residential building, in Part 1 we calculated centerline and found number of junctions, in Part 2 we calculated the quantities of Earthwork in excavation, bed concrete, masonry in foundation, DPC, brickwork in superstructure, lintel and RCC roof, the link are as follows
Part 1 : • Estimation using Cente...
Part 2 : • Estimation using Cente...
My Phone : amzn.to/311uFDW
Amazon Basics 50-Inch Lightweight Tripod with Bag : amzn.to/3ayCdkG
Laptop : amzn.to/3hi2yGp
Estimating and Costing by B.N.Dutta : amzn.to/2Eanu3c
Estimating and Costing by Rangwala : amzn.to/31X7gTi
#centerlinemethod #buildingestimation
Thank you so much. Finally all my concepts are crystal clear 🙏🏻
u rocking sir thanku so much
Thank you so much sir 💖
i understood everything expect in plastering calculation of exterior plastering length
Thank you so much sir
Sir,
kindly give me the explanation of RCC roof slab steel calculation (7th calculation) is missing in your session
Tnq sir 😊😊
thank u sir ji 😍
part 1 and part 2 understand.
But...
this part is not understanding 😞
good sar
Hi sir I have questions in deduction of opening internal and external plastering calculated together so. We should deduct opening two times isn't it
For an example we have w1 2no so so deduction should 4 times isn't it sir. Can you explain please
Thank you sir❣❣
You're welcome 😊
👏👏👏👏
Nice sir....
Thanks Vinay
Good sir.please make video small building with structural design from top to bottom.
G.sambasivarao.
Please upload estimation and costing all lectures
thanks a lot
Welcome, keep watching and supporting
Pls do sir manual design of G+3 building
Sir I understand every point but we need that particular problem notes could you please provide that calculation notes
Really good job sir god bless you please how to build Swimming pool provider& cost estimates please sir
Thank you so much for appreciating, i have not planned for the swimming pool but definitely i will consider
In plastering deduction of door and window you have to take no into side
Will u please repeat part 3 it's not understandable especially the painting of doors windows and ventilator it's not clear at all
good explanation but there is mistake in plaster work deduction. In plaster work consider half size of door and window.
But how ?
I understood everything expect part 3 video🤦♂️🤦♂️
It was my only video on screen recorder and many dint understood so i stopped doing screen recording
U miss the clarity in part 3sir
Yes compared to 1st and 2nd part its little low due to screen recording, i had tried new way but dint worked out
Sir,
U forget to calculate the quantity of slab reinforcement..?
for doors, windows and ventilators, the deduction should be done on both sides sir, why didn't you consider that? it makes a difference of 26.46sq.m
Because of below 30sq.m consider only one face in plastering
Video on Bar bending schedule plzz sir 🙏
Noted, soon i will upload
Yes uploaded it fast sir
Old two videos are good sir instead of this
Sir
Can I have class on design of columns LST method please
Very soon i will put videos on columns
@@structuralanalysisanddesign OK tq
Started uploading Column concepts, kindly check the videos
@@structuralanalysisanddesign sir I will go through it
Present I'm working footing problem
@@structuralanalysisanddesign tq for uploading sir
Great way of teaching sir
Sir u have say is super but in say computer is not clear
Exterior 3.55m hieght
Where is costing?
Height for exterior should be 3.55 na how u had taken 3.65?
Because of an outside plastering consider for below 10cm from the G.L.
Sir kansalla