Super Crane - Demag CC 3800 🏗️

Поделиться
HTML-код
  • Опубликовано: 10 фев 2025
  • Steil Kranarbeiten has a large fleet of telescopic and crawler cranes, self-propelled and heavy-duty transporters. They support the construction of 2 wind turbines in Luxembourg.
    STEIL Kranarbeiten
    www.steil-kranarbeiten.de/
    SOLER S.A.
    www.soler.lu

Комментарии • 68

  • @CaptainZuurpruim
    @CaptainZuurpruim 12 дней назад +2

    What I see is great engineering, with excellent preparation. It also shows only a few technicians/operators are required. Nice!

  • @SJR_Media_Group
    @SJR_Media_Group 29 дней назад +12

    When you need 2 smaller cranes to assemble the big one, you know your going to be impressed... wow. Thanks for sharing,

    • @jryank22
      @jryank22 10 дней назад

      I work for a crane rental company. We refer to the smaller cranes as, "assist cranes."

  • @williamleonardo8478
    @williamleonardo8478 24 дня назад +4

    We had 10 small support cranes assembling all the other cranes and unloading the wind machines and all their structures it was a lot of cranes that were very nice

  • @Bulldog1653
    @Bulldog1653 16 дней назад +8

    Now THAT'S a crane!

  • @rickbedard5758
    @rickbedard5758 24 дня назад +13

    the wind turbines was the biggest waist of taxpayers money ever, but love the crane

    • @anthonyrivers8395
      @anthonyrivers8395 14 дней назад +1

      May work for some countries, but not here😂😊 so true😊

  • @AhTechus
    @AhTechus 7 дней назад +1

    Love this modern approach

  • @richmiller9844
    @richmiller9844 21 день назад +3

    Thank you for doing a perfect video on this. Excellent coverage, good music and great narration!

  • @thenussbaum44
    @thenussbaum44 27 дней назад +30

    I wonder if they factor all those transport trucks into the carbon footprint of wind energy??

    • @stevefrazier2214
      @stevefrazier2214 25 дней назад +9

      That wind mill will never off set the carbon footprint created, in order to manufacture it and the equipment created to set it up…imagine how many people were involved in getting the funding, designing, manufacturing, delivering and how much traveling they had to do. It’s like people who drive electric cars and pretend they are doing it for the environment, then take a trans Atlantic flight for vacation…😂

    • @ronaldwestra8735
      @ronaldwestra8735 23 дня назад +2

      No

    • @RoyvanRikken
      @RoyvanRikken 22 дня назад +3

      Well. As long as it feels good in some dumb politicians hearts and for the people who voted for them, right ?

    • @Michael-ul8bv
      @Michael-ul8bv 19 дней назад +2

      I'll bet not and don't forget it takes 3 other cranes to assemble that thing

    • @larrycopenhaver
      @larrycopenhaver 18 дней назад

      no

  • @geneautry2091
    @geneautry2091 26 дней назад +3

    2006-2007 I worked as an AWS unlimited certified welder fabricating wind turbines.

  • @leslieallan392
    @leslieallan392 Месяц назад +21

    And all this for CLEAN???energy😂😂😂

    • @laurentbreyer
      @laurentbreyer  Месяц назад +2

      It's about free energy available from nature.

    • @atwoodca
      @atwoodca 29 дней назад +5

      @@laurentbreyer and all the energy/ carbon it takes to make all that Equipment. Just to get ”free” energy, lady you are short many bricks.

    • @Lancaster786
      @Lancaster786 27 дней назад +3

      And how much oil, energy is used to keep this monstrosity making free energy 😂😂😂 don’t be fooled !

    • @johnhaydon4055
      @johnhaydon4055 27 дней назад +1

      Yep,many studies have shown it takes about 9 months or so for a big wind turbine to repay its embodied energy, after that maintenance is a tiny fraction of the energy it produces.

    • @johnboelema3586
      @johnboelema3586 27 дней назад +3

      @@laurentbreyer 70 truckloads just to get one crane assembled?!?!?!? this boondockle is neither clean nor free!!! not to mention the large amount of oil based lubricants needed to run the turbine.

  • @Brad772006
    @Brad772006 11 дней назад +1

    I would love to be working on that site. They have some nice machines. Top tech level!

  • @williamleonardo8478
    @williamleonardo8478 24 дня назад +6

    Worked on a windmill farm in Mojave California for mortensen we built a Libra 13000 with a 430 ft boom it came in on 49 truckloads it took seven men a week to build it and it was awesome biggest f****** thing I've ever been very proud to be on that job operating engineers local 12 God bless America

    • @anthonyrivers8395
      @anthonyrivers8395 14 дней назад +1

      The golden age of America❤ we’re gonna need you to come back to work please 😂

  • @Shotsmoky
    @Shotsmoky 7 дней назад

    “Green” energy? Cool cranes. That’s all.

  • @wolfgangkowalik6
    @wolfgangkowalik6 18 дней назад +2

    WOW GREAT !!!!!!!!!!!

  • @vincenzo3292
    @vincenzo3292 23 дня назад +6

    Diesel power to build wind power.

  • @SohailMirza-t1m
    @SohailMirza-t1m 25 дней назад +2

    this is my favorite video

  • @malbaillee5187
    @malbaillee5187 6 дней назад

    what a tool amazing

  • @tatayrobertvlog5305
    @tatayrobertvlog5305 28 дней назад +2

    ❤❤❤ thanks for sharing

  • @jerrydosser7031
    @jerrydosser7031 28 дней назад +11

    The expense of the mill will not be paid for by the end of the service life. The only thing flowing is the money.

  • @MachineintheMonkey
    @MachineintheMonkey 27 дней назад +1

    The back mast has got more stick than most oil cans I’ve operated

  • @stevenkoski228
    @stevenkoski228 26 дней назад +3

    Well Manitowoc, make your move🧐.

    • @ThatNorma
      @ThatNorma 26 дней назад

      Why would Manitowoc need to make a move? Manitowoc crawlers have been left out in the dust for a long time, easily surpassed everywhere by Demag/Tadano and Liebherr. The only place where you still see Manitowoc Crawlers working in the Wind industry is the USA and even those are rare for Wind Work. American stubborn leaders at Manitowoc dictacted the end of their once profitable crawler line

  • @MariaCarmen吴-e7z
    @MariaCarmen吴-e7z Месяц назад +2

    👍excellent

  • @theamazingeg
    @theamazingeg 8 дней назад +1

    I run one of these

  • @jfro5867
    @jfro5867 16 дней назад +4

    When you tot up all the energy, raw materials, hundreds of tons of concrete in the base, all the resins, fiberglass, copper, plastic, rubber and goodness knows what else into each turbine then the astronomical cost of installing the damn things, how on earth is this ‘progress’? How can it help the environment? It’s such a load of BS.

  • @robertbate5790
    @robertbate5790 22 дня назад +1

    HOW MANY MEN DOES IT TAKE TO CHANGE A LIGHT BULB? Without a wind turbine it doesn't matter. No wonder the cost of net zero is so high. Huge engineering accomplishments though, and a highly skilled workforce. Hopefully reflected appropriately in salary. And all so we can light that bulb.

  • @hubertkaiser8581
    @hubertkaiser8581 Месяц назад +1

    ohne die Gruenen die Kranindustrie pleite, fuer jeden Ventilator ein Kran.....Demag lebt auch nicht schlecht.........

  • @GSSurry
    @GSSurry 19 дней назад +1

    When you have hearing impairment this video is difficult to watch with background music

  • @robsalvv5853
    @robsalvv5853 24 дня назад

    After all that, we didn’t even see a lift. :/

    • @laurentbreyer
      @laurentbreyer  24 дня назад

      The journey is the destination. This is shown in another movie.

  • @anonymously241
    @anonymously241 29 дней назад +1

    What is the top speed? 😩😩😩

    • @ronaldvdfluit7337
      @ronaldvdfluit7337 29 дней назад +1

      Travel speed max. 0.68 mph and km is it travelspeed
      1.08 km/h

  • @bogey19018
    @bogey19018 24 дня назад +18

    The green scam continues.

    • @mechman242
      @mechman242 15 дней назад +1

      Yep, seems like a very high level of labor and expense for a unit that doesn’t really generate that much power. Might be worth it in very remote areas possibly though.

    • @rongrose3746
      @rongrose3746 15 дней назад +1

      So true . Rate of return is RIDICULOUS on the investment!!

    • @TheSpicyLeg
      @TheSpicyLeg 13 дней назад

      LOLerskates!

    • @ruger8412
      @ruger8412 10 дней назад

      You watch to much fox,, losers

    • @bogey19018
      @bogey19018 10 дней назад

      @@ruger8412 Pot meet kettle.

  • @newnew7055
    @newnew7055 29 дней назад +1

    🍻🥟🥟🥟🥂

  • @naimishdbhatt7922
    @naimishdbhatt7922 28 дней назад +1

    184th like 😂

  • @jeffj2495
    @jeffj2495 23 дня назад

    Marketing....but mildly interesting

  • @grumpyg9350
    @grumpyg9350 15 дней назад +1

    What a waste of resources. Net loss.