Trains at the Hudsons road level crossing, Spotswood

Поделиться
HTML-код
  • Опубликовано: 6 окт 2024

Комментарии • 1

  • @darrenmiles-morland8038
    @darrenmiles-morland8038 3 месяца назад

    The Westinghouse Hybrid bells have been replaced at this level crossing too. The last time that I visited it was in November 2017, and it had Westinghouse Hybrid bells at the time. Luckily I managed to record some footage of them when I was there that day.