GO Tech Centre | Work in progress

Поделиться
HTML-код
  • Опубликовано: 11 июн 2024
  • The new GO Tech Centre at the Industrial Estate of Bulebel in Zejtun provides a prime example of AP’s sustainable design philosophy.
    The proposed data centre, the largest of its kind on the island and designed to reduce heat losses through its skin, overlies the plant and generator rooms while the heart of the project is provided by the gateway building, a low lying building almost wholly covered with a vertical garden system spilling over into the car park at the core of the development.
    It is connected to the office blocks and data centre by a series of bridges that provide healthier routes to the employees crossing from one area to another, while taking in south facing valley views.

Комментарии •