I have created a schedule and already I have negative float and longest path with FF relationship. I don’t have an option to change the FF to FS please help
Hi, Do you have videos for Revising the schedule that have already actual % and mhrs on which the EV = PV so that after revising the schedule on update it will have the same schedule % or the end % equals to 100%. As of the actual update becomes the plan schedule which is the baseline. Thanks for the videos by the way, I have learned a lot while following yours.
1. Actual start date (if the activity was started), 2. Actual Finish date (if the activity was finished), 3. % Complete Type? is it Physical, is it Duration, is it Unit? if you set % Complete type into physical %, you should update physical based on actual condition on field in the status tab, then manually update remaining duration in the status tab, then manually update actual unit in resource tab. 4. run the schedule according to data date if you set % Complete type into Duration %, update the duration manually in the status tab, so labor unit and Non labor unit will automatically change, and also duration will automatically change then run the schedule if you set % Complete type into unit %, update the unit % manually in the status tab, so labor unit and non labor unit will automatically follow the unit %, then run the schedule Please correct me, Thank you
very good. Yes, I was using this method without the logic behind it you were describing
this is very useful for me, thank a lot, always waiting and following your channel. thank you
GREAT THANKS FOR THIS INFORMATION
Why sometimes some activities that are already completed shows in the FP analysis?
My critical path is not show in bar chat , there is no any critical path but before that one is show please advice how to fix it
Using progress override ,it is possible to get an real critical path? Not longer I talking about critical by total float.
I have created a schedule and already I have negative float and longest path with FF relationship. I don’t have an option to change the FF to FS please help
Great
To show overlapping we have to show Longest Path Noth Float Path
Hi, Do you have videos for Revising the schedule that have already actual % and mhrs on which the EV = PV so that after revising the schedule on update it will have the same schedule % or the end % equals to 100%. As of the actual update becomes the plan schedule which is the baseline.
Thanks for the videos by the way, I have learned a lot while following yours.
What about when we have constraint milestones then how we can extract the longest path?
Dear all I have problem with updating my schedule Please guide me which way you used and which is the best way for updating schedule
1. Actual start date (if the activity was started), 2. Actual Finish date (if the activity was finished), 3. % Complete Type? is it Physical, is it Duration, is it Unit?
if you set % Complete type into physical %, you should update physical based on actual condition on field in the status tab, then manually update remaining duration in the status tab, then manually update actual unit in resource tab. 4. run the schedule according to data date
if you set % Complete type into Duration %, update the duration manually in the status tab, so labor unit and Non labor unit will automatically change, and also duration will automatically change then run the schedule
if you set % Complete type into unit %, update the unit % manually in the status tab, so labor unit and non labor unit will automatically follow the unit %, then run the schedule
Please correct me, Thank you
Why don't show overlaping activities if are a critical activites as well ? Thanks.
Of course, if they are critical overlapping activity should be shown as well.