Point Hope Shipyard Barge Dry Docking

Поделиться
HTML-код
  • Опубликовано: 10 сен 2024
  • The process of dry docking a barge using a railway system. Follows the barge from being maneuvered into the cradle by tugboats to being pulled out of the water and positioned in its final work site.

Комментарии • 22