Building a House Ep 8 - Posies Installed and Subfloor Completed

Поделиться
HTML-код
  • Опубликовано: 14 дек 2024
  • ХоббиХобби

Комментарии • 4

  • @VijayDahiya-e2c
    @VijayDahiya-e2c Час назад +1

    Wonderful work dave 👍❤

  • @trollingdogRblx
    @trollingdogRblx Час назад +1

    The lvl blue beams. You said cyclone tie downs. Will that also stop it twisting over? I'm just curious. Another great video. 👍

    • @AndyPearo
      @AndyPearo 59 минут назад +1

      It helps stop wind loading from lifting the beam when the floor is attached. Nails are useless at preventing wind from lifting flooring and roofing in high winds.

    • @DaveDoesCarpentry
      @DaveDoesCarpentry  46 минут назад

      It definitely will stop the bean twisting but I’m not sure if they’re intended for that. Once the subfloor is built and everything is connected, the beam should be locked into place and unable to twist