Amtrak Pioneer (25) April 1997 Greeley to Seattle

Поделиться
HTML-код
  • Опубликовано: 2 дек 2024

Комментарии • 16

  • @SkipW
    @SkipW 12 лет назад +2

    A classic trip, & thanks for the ride along!

  • @jimwolken6726
    @jimwolken6726 11 лет назад +2

    so glad you got those train stations thru Wyoming

  • @salemcripple
    @salemcripple 11 лет назад +2

    i don't know why they canceled this route. They stated low ridership on it. But i rode it several times (Portland to Denver), and it was packed every single time!

  • @SebastianLandrus
    @SebastianLandrus 7 месяцев назад

    Cool I wish Amtrak’s pioneer could come back in service In the near future

  • @Lightwolf333
    @Lightwolf333 12 лет назад +1

    man I remember watching this train roll by when I was a kid.

  • @arifakyuz7673
    @arifakyuz7673 4 года назад +1

    Wow, amazing footage!
    Too bad Wyoming and Idaho don’t have rail service.

  • @herinol
    @herinol 5 лет назад +1

    Wow Amazing!

  • @BNforever2009
    @BNforever2009 10 лет назад +1

    mice video--now i get to see what Amtrak was using back in 1997

  • @trainjack16
    @trainjack16 8 лет назад +3

    They are trying to bring back the Desert Wind and the Pioneer.

  • @thetrainman3923
    @thetrainman3923 8 лет назад +2

    there's been attempts trying to bring it back but it's not likely to return anytime soon.

  • @Lightwolf333
    @Lightwolf333 12 лет назад

    Thanks for posting this Jim.

  • @DashMatt-qu4cb
    @DashMatt-qu4cb 6 месяцев назад

    I heard they’re gonna restore Amtrak Pioneer route soon. I hope they go through Wyoming cause it’s fantastic to see out there and I want to take the train through there.

  • @chriswalker1993
    @chriswalker1993 11 лет назад +1

    Unfortunately, Amtrak didn't have enough Superliners to run the Pioneer, Desert Wind, and Zephyr. By the time the Pioneer and Desert Wind were cut, the Zephyr was running 4x a week, while the Pioneer and Desert Wind ran 3x a week. Ultimately, the decision was made to cut the Pioneer and Desert Wind, so the Zephyr could run daily.

  • @McMinn1981
    @McMinn1981 8 лет назад +1

    nice video

  • @blackbirdgaming8147
    @blackbirdgaming8147 5 лет назад +1

    I wonder why Amtrak was short of equipment during this time. The Hi Levels had plenty of runtime left and the Superliner II order should have helped a lot to alleviate the shortage. Worst case scenario, they could have kept heritage sleepers and the Hi Levels, using them for routes that wouldn’t have Superliners available. The Viewliners would make the heritage sleepers surplus, so they could easily be used on other routes with Hi Levels.

    • @AVeryRandomPerson
      @AVeryRandomPerson 4 года назад

      Because there weren't enough Trans Dorms for all routes and the top of the Hi-Level Transition Cars were coaches instead of sleepers. The Viewliners were going into service at this time, but too many routes existed for too few cars.