How to use Dumpy Level for Excavation of Sloping Ramp

Поделиться
HTML-код
  • Опубликовано: 10 фев 2025
  • How to do Excavation of Sloping ramp using Dumpy Level...
    As a Civil engineer what is our duty during excavation of Sloping ramp of parking, retaining wall construction....
    How to check level of ground during excavation of Sloping Ramps...
    Sloping Ground excavation by using Dumpy Level....
    How to calculate slope of ramp
    Watch More:
    1) How to Draw Floor Plan by Hand: • How To Draw House Plan...
    2) How to Draw House Plan Step by Step Method: • how to draw house plan... (450k views)
    3) How to Draw House Plan Easiest Method: • how to draw house plan... (36k Views)
    4) House Plan Drawing Step by Step(Most Popular Video on RUclips): • How to draw house plan...
    Also Watch:
    1) Staircase Reinforcement Calculation || Full Estimate in Excel Sheet: • Staircase Reinforcemen...
    2) Construction Estimating Using Excel || Free Download Excel Sheet: • Full Building Estimati...
    3) House Construction Cost ¦¦ Calculate Cost in Excel sheet: • House Construction Cos...
    4) Building Material Price ¦¦ Construction Labour Rate: • Building Material Pri...
    5) How to prepare Bill of Quantities (BOQ): • How to Prepare BOQ | ...
    6) How to Calculate Load on Column: • How to Calculate Load ...
    7) Full Building Estimation in an Excel sheet: • Full Building Estimati...
    Visit My Website: www.civiconcepts.com
    My Facebook Page: / civiconcept
    My Twitter Account: / civiconcepts1
    My Instagram Account: / civiconcepts
    My Linkedin Account: / civiconcepts
    #Surveying #Buildingestimation #Civilknowledge

Комментарии • 69

  • @brijmohansharma4732
    @brijmohansharma4732 3 года назад +10

    maximum Height of staff rod is 4 or 5 m,hence instrument need to be shifted for achieving desired ht.as going downward in slope.

  • @vipulsingh8647
    @vipulsingh8647 5 лет назад +2

    आप के समझाने का तरीका बेस्ट है

  • @abdullahimtiaz9645
    @abdullahimtiaz9645 4 года назад +2

    Ok sir g apka bhat bhat shakrya
    Takns aj sy ma dil sy kam kro ga aur only survy ki video daku ga

  • @harmelsroa5102
    @harmelsroa5102 2 года назад +1

    Best way of learning.best teacher engr.

  • @alkhairabaya
    @alkhairabaya 3 года назад +1

    Best video 👍👍👍👍

  • @commonerIndian
    @commonerIndian 3 года назад

    very good

  • @Mahesh-xb6cc
    @Mahesh-xb6cc 4 года назад +1

    Excellent explained sir thanks.

  • @pradumkhare6609
    @pradumkhare6609 3 года назад +1

    Good

  • @srikarvemu5945
    @srikarvemu5945 6 месяцев назад

    Thank you sir

  • @surajmamdekar3463
    @surajmamdekar3463 6 лет назад +2

    Thank u bro love you🙏🙏🙏

  • @sarthakmohapatra3738
    @sarthakmohapatra3738 5 лет назад +1

    Excellent video sir. thnx a lot.

  • @vinodr.prasad9069
    @vinodr.prasad9069 6 лет назад +1

    very good sir thank you

  • @chennakesavulukate8448
    @chennakesavulukate8448 4 года назад +1

    How to Water pipe line excavation surerving videos please sir

  • @fawadalishah2163
    @fawadalishah2163 2 года назад

    Appreciate your help for us but it's so easy if we use slop formula..
    1st level _2nd level/total distance*req distance+- 1st level

  • @mikramsanwalsanwal1535
    @mikramsanwalsanwal1535 4 года назад

    Deffierent plot mearusment krny vidio bano sir. Ap ki vidoe nice ha . Example. 1 kanal ka plot. 2.5 marly ka. 3 marly ka . 4 marly ka. 5 marly ka. ............... and 10 marly ka plot pamysh kasy li jati ha in py vidioe bnao g plzzzzz

  • @san-sanibharatvarsh6186
    @san-sanibharatvarsh6186 3 года назад

    Superb sir ..can you plzz make an video on feild book filling for underground pipelinr

  • @yashgupta6826
    @yashgupta6826 6 лет назад +1

    Thank You So Much Sir....

  • @sachingola9702
    @sachingola9702 5 лет назад +1

    Nice

  • @akshay232676
    @akshay232676 4 года назад +1

    Sir kya aap lajldi mey bhool gaiye 5m ka staff hota hai to age key ka readings kaise ayegaa

  • @mubi11988
    @mubi11988 5 лет назад +7

    But is there staff greater than 4mtr... so how can we get a staff reading higher than 4 mtr without changing the instrument

    • @screwdriver4862
      @screwdriver4862 4 года назад

      Exactly. I think this is applicable only in theory and not in practice. Waste.

  • @homeanimations5786
    @homeanimations5786 5 лет назад

    👌👌👌

  • @mdbadshahrajraj6915
    @mdbadshahrajraj6915 5 лет назад

    Thanks u sir knowledge dene ke liye bt sir ek questions hai sir Jaise hamko koi excavation hua hai maan lijiye wo excavation 450mm Ka hua hai to usko auto level se kaise check karenge ki Mera excavation 450mm sahi hua ki nahi

  • @niravsavsaviya9
    @niravsavsaviya9 4 года назад +1

    आगर स्टाफ रीडिंग ज्यादा आ रहा है तो क्या करें अगर कम आ रहा है तो हम excavation करते है तो ज्यादा में क्या करते है

  • @PhysicWorld9847
    @PhysicWorld9847 4 года назад +1

    HELLO SIR , PLEASE MAKE A VIDEO ON THE TOPIC ARE :- (1) HOW TO SHIFT TBM .
    (2) HOW TO SHIFT FLY TBM .
    (3) HOW CHECK THE REQUIRED EXCAVATION LEVEL BY MAIN TBM OR ALSO ANY ONE FLY TBM VALUE .
    (4) HOW TO CHECK THE TOP AND BOTTOM LEVEL OF ANY EARTHCRUST LAYER BY MAIN TBM OR ALSO BY ANY ONE FLY TBM .
    (5) HOW TO CALCULATE THE QUANTITY OF EACH AND EVERY EARTHCRUST LAYER BY USING THE OGL DATA WE ARE TAKING FROM INITIAL STAGE OR BEFORE EXCAVATION STARTS.
    (6) HOW TO MAKE EXCEL SHEET FOR THESE ALL WORKS AND CALCULATE .

    • @dkaloupis75
      @dkaloupis75 4 года назад

      And most important THAT VIDEO should be in English

  • @adityajena6226
    @adityajena6226 6 лет назад +1

    nice

  • @dhrubajyotitalukdar1560
    @dhrubajyotitalukdar1560 4 года назад +1

    How did you get the RL value ?

  • @babyash6916
    @babyash6916 3 года назад +1

    Sir Ye toh B.S/I.S reading k according bhi de check Kr skte hain ki 10 m pe level ko itna down Krna h ,begair HI aur R.L calculate kiye

  • @Amarnath-dp5dx
    @Amarnath-dp5dx 4 года назад +1

    Jab hamara staaf hi 5 mtr ka hota hai to ye 11 mtr ki reading kha se aayegi ... instrument change karna padega

  • @sourabdas1467
    @sourabdas1467 6 лет назад +2

    Nyc video sir .. RL 50 m kesa liya sir

    • @Civiconcepts
      @Civiconcepts  6 лет назад +3

      Koi bi high level location lena hota hai... Aur uski RL assume karni hoti... Calculation me easy ho esliye 50 ya 100 aap RL le sakte hoy...

    • @amaragrawal4444
      @amaragrawal4444 6 лет назад +2

      Kch places pe RL diya bhi hota hai,MSL v ise ko bolte hai

  • @adityajena6226
    @adityajena6226 6 лет назад

    aur video banaye civil topic pr pls sir

  • @sheharyarnawaz8586
    @sheharyarnawaz8586 3 года назад +1

    Bhai 12 m ka staff Kahan say layen gay staff to total 5 m ka hota hai

    • @Civiconcepts
      @Civiconcepts  3 года назад

      Ye सिर्फ sikhane ke liye hai... Level shift karna hota hai

  • @bnbgouda
    @bnbgouda 4 года назад +1

    Sir staff tho maximum 5 meter ka hota hai next tho staff visible nai hoga tab kaise kare sir...????🤔🤔🤔🤔🤔🤔🤔🤔🤔🤔🤔🤔🤔🤔🤔🤔🤔🤔🤔🤔🤔🤔plz rply sir

  • @yashgupta6826
    @yashgupta6826 6 лет назад +1

    Sir, exeavation par 1m3 ka rate kese calculate karte hai Plz bataye Sir....Plz M3 ke Rate Kese Calculate kare gisame Sir concrete ke bhi kese calculate karege Sir Plz... Help

  • @RandhirSingh-lk7vl
    @RandhirSingh-lk7vl 5 лет назад +2

    But sir staff is only of 5 metre then how will we measure

  • @SouravKumar-dp1rr
    @SouravKumar-dp1rr 4 года назад +1

    Sir staff ki height 4m ka hota hai to 12m height ki kaise measure kare

  • @bigraclub6798
    @bigraclub6798 6 лет назад +1

    Sir railway ka staff quarters ka slap ka bbs nikal ke dijiye plzz

  • @hrishikeshsakpal4006
    @hrishikeshsakpal4006 4 года назад

    sir but staff ki length to 5 mtr. hai so pls continues kro ye video fall and rise method. se

  • @priyamroychowdhury1804
    @priyamroychowdhury1804 6 лет назад +1

    Sir ek chiz samja digia Mera staff 5 m thak hota Hai 12 m meh kaise dekhu tell me the process

    • @Civiconcepts
      @Civiconcepts  6 лет назад

      Dumpy level shift karna padega

    • @priyamroychowdhury1804
      @priyamroychowdhury1804 6 лет назад +1

      Then sir everything will be changed sir total process specially for new fresher's one clarify it properly and also do some videos on reverse levelling

    • @Civiconcepts
      @Civiconcepts  6 лет назад

      Sure

  • @letsdoit7474
    @letsdoit7474 3 года назад

    But how could we take staff reading beyond 5 Mtr??? cause staff itself is 4/5 Mtr

  • @munafahmad8701
    @munafahmad8701 2 года назад

    Itna long length ka staff kha aata he

  • @surajmamdekar3463
    @surajmamdekar3463 6 лет назад

    Broo we need building footing excavation details

  • @ankurshukla6855
    @ankurshukla6855 6 лет назад +1

    slope ratio to bataya hi nhi kitna rkhna chahiye

  • @bigraclub6798
    @bigraclub6798 6 лет назад +1

    Q ki main l. C goomty or ib goomty ki sara kch krwa diya hun ab staff quarters pe jana h

  • @raghunathpatil895
    @raghunathpatil895 4 года назад +1

    Ye autolevel he na sir?

  • @yashgupta6826
    @yashgupta6826 6 лет назад

    Kyuki Sir Govt tender me bill fo quantity barni padati hai uake liye aap ki help chahiye thi Sir Aap ki Email ID Mila sakhti hai Plz......

  • @tannycreation1777
    @tannycreation1777 5 лет назад

    Railway Main LHS ka kam tha keya wo?

  • @sunnybadhan7930
    @sunnybadhan7930 4 года назад

    Sir 5 ja 6m se jyada staff Ni hota

  • @musimpackam3484
    @musimpackam3484 2 года назад

    Can you translate to English spoken?

  • @sureshraj5383
    @sureshraj5383 2 года назад

    You divided wrong

  • @dkaloupis75
    @dkaloupis75 4 года назад

    Indian video with English comments...no chance to understand a f@cking single word and it really seems too Greek even for a Greek like me....

  • @shahrukhdaud7989
    @shahrukhdaud7989 2 года назад

    Good