Thanks to ET Transit for the video footage- twitter.com/ET_Transit @ET_Transit Thanks to Droneman for Video Footage - www.youtube.com/@Imdroneman @Imdroneman
Sadly to say I was the 1st Civil Engineer hired for this project in 2011 from the GC side. Corruption and corruption is the only reason for the delay of this project. This was one of the most simple and easiest metro project for construction as the area was almost open for construction as compared to Mumbai.
@@pranavtripathi791 it doesn't really. There's barely one harbour line without any fast train services and NM connects with Mumbai at just Vashi bridge. Good things are that Airport and Sewri sealink are coming up. Also this metro 1 plus metro 12 and an expected metro 8 will make more difference. For most people travelling to Navi Mumbai can be nightmare with lack of options.
There are lot of projects in Kharghar which are delayed significantly. Like - Kharghar taloja bridge - kharghar turbhe link road - BKC-2 - Children park in sector 18 etc to name a few. Only the property rates kept on increasing here during these projects announcement. People have been fooled by CIDCO and developers together. There are only two roads to get out of kharghar node and there is lot of traffic near monkey point signal. Still there is no planning for new gateway to-from Kharghar and new constructions are going on in massive pace. Infrastructure will be one of the worst in Kharghar in coming years.
Kharghar to panvel was in controversial decision between panvel mahanagar palika and cidco which was passed recently and decided that it will be the part of panvel mahanagar palika.
ये मेट्रो पनवेल से खारघर होके जुईनगर रेल्वे स्टेशन सानपाडा रेल्वे स्टेशन होके apmc मार्केट फिर वाशी सेक्टर 9 बस डेपो होके वाशी स्टेशन तो ये लोगो को काम आती
I think even after inauguration Navi-Mumbai metro will be loss making and failed metro, as it doesn't travel through high dense area. Many people living around those areas already have their personal vehicle and calculating fare as well as frequency, won't think this metro will much succeed
Public transport is never meant for profit making. I think the local govt should instead encourage more people to take metro, and develop that area more. Plus even if people have private vehicle, most don't want to go through the headache of traffic, bad road conditions etc. Give it time, it will be successful.
They could make it work of they connect it with metro 1 at ghatkopar or metro 6 at kanjurmarg or metro 2b at mankhurd. Else it's failed project by all means.
@@kracks9852 Agreed, but NM metro can be the next Mumbai mono rail in terms of low ridership. Unlike other cities, Navi-Mumbai has good and wider roads. Specially certain sectors Kharghar where this metro passes from has 4-6 lane roads, having max 10 vehicle any given time. No doubt in future as these sectors get develop, metro may provide a good alternative.
@@At_sk there will be a taloja-kalyan extended line. From here we can get the crowd cause Mumbai's main workforce in Dadar, Andheri and Parel comes from either Thane or Kalyan.
Modern and advance metro projects may come and go but Delhi Metro will always be an emotion.... Although I am not from Delhi but it's still well managed metro throughout India.
I remember i was in School when metro construction started in 2010 after that i completed high school, jr cllg,sr Cllg,masters nd moved abroad but still NM metro not completed 😢
A great videos indeed, everyone including media, government seemed to forgot about the project, also there have been a lot of issues with road construction in new cidco areas like Karanjade, ulwe, etc. Road construction and area development has also been delayed for years just like Navi Mumbai metro.
That's so true. I was an engineering student back then when metro work started. Took admission in 2011 and now in 2023 I'm moved forward in my career but still whenever I visited Kharghar I see just fraction of work being proceeded. Such a shame for a city which is still one of the best designed cities
I used to travel from Panvel to Vashi during my DIploma in 2014 and i used to see the Metro construction throughtout the course. Now i have completed my Diploma then my Bachelors, worked for 1 year and again i switch into another filed and again got job......still after all this years this Mtero project is going on, even the Belapur metro's whole construction is not even completed. I hope this project will get completed when my kids will travel from same routes which i used to take.
And guess what Mumbai Metro Line 14 is consistently being ignored that will connect Ambarnath, Badlapur with Navi Mumbai & Powai. This line being the need of an hour is conveniently being ignored.
@@jalpasheth5272example they haven't even planned what line 8 would look like, where the stns will be while it's supposed to connect Mumbai with new upcoming airport. And I'm pretty sure metro 14 is not the solution to take people who travel fast train from badlapur ambarnath to ride a much slower metro passing through much more sparse population (creek, mangrove, mountain will take up half the length while a lot of what is land is sparsely populated). I have a guess as more and more metros are built they'll hit a point where they might see this metro 14 as white elephant project and not approve it.
Thank you for info... I finished studies while seeing metro being constructed, Took job... Switched job... Still after 8-10 years it is not yet started... 😅😂
Wow... Very great knowledgeable and truth of navi mumbai metro train updates and project works. This is really needed for nation. Another there should be complete enquiry commission and bench should appoint to clear cut details where and whom has actually did what Regularities to stole whole nation or people's money's. Jai hind... Jai bharat... Jai shree ram...!!!
Small Delay is ok atleast they made a big project like metro idea for a new built city which was a full village some years ago Navi Mumbai,etc. only and they will extend till vashi Mumbai and connect to mmrda also Mumbai metro only and its a blessing that they made such a big budget Navi Mumbai metro Kolkata so advance city many cities dont even have a metro project so its good and it will start soon by this year Navi Mumbai metro or soon maybe they are taking daily trials so government is doing a great step at its side and it started great speed work in past few years so it will start Navi Mumbai metro soon and its big good thing only 30-40 RS ticket ac metro where auto charges 100-200 rs,etc. for distances of taloja-belapur and there are so many poor people schemes,tax money so less collection so many are poor they get so much benifits of tax money still so many good projects Indian government keeps making hats off to government for bringing such a good project and developed it and development. Mumbai metro underground project,ac local trains,non ac,etc. So this is just a misleading fake video it is not delayed or failed it will start soon Navi Mumbai metro,etc. Ok bye.
#AskPT : What benefits do "Special Purpose Vehicle" Companies like DMRC, NHSRCL, NCRTC, MMRC etc have over existing government/municipal bodies that lets them carry out their assignments quickly, efficiently and without much compromises.
Ek hath se khane ki jagah do hath se khayenge par efficiency ek hath ka hai 😂. Government ka scam hai sab. Problem create Karo phir problem ko solve karne ki jagah pe ek aur problem create karo
Corruption is not there see so less tax people pay so many poverty people are government have to serve them free pensions,money,free medicines,etc. still they are regularly developing india with new metro ac trains and so less tickets 30-40 rs respect government they never do corruption's,etc. Ok small scale maybe but they never do big corruption's or corruption as such delay is there small atleast they start this year or soon Navi Mumbai metro only is starting only ok bye.
Great video buddy. Nicely presented and shared a good deal of information. New update ke hisab se Navi Mumbai metro is mahine (April 2023) shuru karne ka plan hai. Ideally is metro ka value tab badega jab yeh line CBD ke badle Vashi tak extend ho. So maximum navi mumbai cover hoga. Lets hope it starts.
I saw the FIRST digging / pillars for this metro (only trial) come up in 2001-2. This wasn't for the final work, but a trail of the project. Officially it might have started in 2011, but digging etc had started a decade before that! So 20 years+ for a 11kms line...
Kisi bhi city mein metro ka construction karte waqt pehle ek SPV ( Special Purpose Vehicle ) ko appoint Kiya jata hai. MMRC ( Mumbai Metro Rail Corporation ) is responsible for construction Metro lines in Mumbai. Before Maharashtra Metro Rail Corporation is responsible for construction of metro lines in Nagpur, Pune, Nashik, etc. CIDCO has Appointed Maharashtra Metro Rail in 2019 almost 9 years late. Even the Govt of Maharashtra & Govt of India is not interested in construction of this line. Nagpur ko approval 2014 me Mila tha aur 2019 mein operational bhi ho gaya.
What is worst is, they are classifying wetlands and mangroves as commercial lands 😂😂😂 giving it to builders. I just want to move away from this land now, while it’s my ancestral land, I know it’s beyond repair. One major disaster and it will fall.
Please make a video on how Yamuna expressway industrial development authority is taking to the next level for smart city development and developing such a huge land for futuristic city across Yamuna river. It is attracting huge investment and property rates are skyrocketing in the area. Please make another video why “hybrid solar park-Kutch” and Dholera smart city is on a snail paced development
CIDCO and the blacklisted companies shud be sued by the Navi Mumbaikars for delaying and wasting people's money. Movie banni chaiye, aur uska title rakho Thugs of Navi Mumbai
Proud Navi Mumbaikar but this is quite a sham. Good that autonomous institutions make Metro projects now, convinced that privatisation helps the country.
Navi mumbai metro is best government is nice that is why they making such big budget projects and cidco is also good so big city navi Mumbai was a full jungle forest area now so big city cidco makes cities and so many cities like navi Mumbai,etc. only are made only ok and navi Mumbai metro will connect to vashi Mumbai also soon and mumbai underground mmrda metro also only so big big budget projects and development are being done and already some metro,trains,etc. Only completed only projects like vande bharat,ac local,mumbai metro,delhi metro so railways is government and private only and government,etc. And all government only is the best only ok bye.
Pune metro is the slowest. Navi mumbai born after independence, has less population than pune, has local train and Local buses with wide roads due to planned city. On the other hand pune has more population than Navi Mumbai, has narriw roads, Has local train but serves only one direction of area. 3rd most traffic city in india. Despite this we have no metro line which is fully completed. Punekars have been waiting since decades.
Navi Mumbai, Mumbai and Jaipur Metro did not fail. The metro that actually failed is Bengaluru Namma Metro. other metros are doing actually better than the Namma Metro.
I wouldn't say so the Jaipur metro and Navi Mumbai metro are as such major failures even Bangalore metro is a bit of a failure due to construction delay and not proper coverage.
Navi Mumbai is Far away from Mumbai.. why it is named as navi Mumbai.... New name would be better than this one .. and new cities should be built out of Western Ghats...So we can save the our Oldest Forest area😢😢😢
No Navi Mumbai is correct name it will never change it is new Mumbai only and ghats are not proper for humans,etc. Living so ghats are not ok everywhere Navi Mumbai development also is needed for human population growth living so its good development and ghats are also there in Navi Mumbai some only and its not far from Mumbai and future development of fast trains more less time only some 10-20 minutes only distance will be left from vashi Mumbai to Navi Mumbai its not far proper name Navi Mumbai only ok bye.
The one main reason for the delay is CIDCO, they have been pueposely delaying to increase land cost and sell it. The other reason is as you rightly pointed land acquisition, in MMRDA region this is the biggest issue and has multi-nodal agencies with conflicting jursidiction. CIDCO had no expertise in constructing Metro they should have hired DMRC as consultant from the begining and they did that at the last leg of construction. CIDCO is one of the biggest corrupt government bodies in India.
Comedy show bana k rakh dia CIDCO ne 😁, surprisingly koi kaise blacklisted companies ko tender de sakte h? Chairman ya Head ki position vacant hoti h to har organization me power ki ladai hoti h, ghaple bhi pale k hote h or organization hi suffer karta h. Shocked to see such type of corruption in Navi Mumbai, total governance failure. I hope, Maha Metro will complete the project without much resistance.
Im becoming old now.. Listening navi mumbai metro, Navi mumbai Airport.. 🤣 Still both projects are yet to complete... God (govt and contractors) knows when will it complete... Government of all parties have been in maharashtra, but situations are not improved..🤷🏽♂️
Small Delay is ok so no one is going to be punished also only and attleast they made a big project like metro idea for a new built city which was a full village some years ago Navi Mumbai,etc. only and they will extend till vashi Mumbai and connect to mmrda also Mumbai metro only and its a blessing that they made such a big budget Navi Mumbai metro Kolkata so advance city many cities dont even have a metro project so its good and it will start soon by this year Navi Mumbai metro or soon maybe they are taking daily trials so government is doing a great step at its side and it started great speed work in past few years so it will start Navi Mumbai metro soon and its big good thing only 30-40 RS ticket ac metro where auto charges 100-200 rs,etc. for distances of taloja-belapur and there are so many poor people schemes,tax money so less collection so many are poor they get so much benifits of tax money still so many good projects Indian government keeps making hats off to government for bringing such a good project and developed it and development. Mumbai metro underground project,ac local trains,non ac,etc. So this is just a misleading fake video it is not delayed or failed it will start soon Navi Mumbai metro,etc. Ok bye.
it's not fully complete yet. some stations are still under construction... it will take another 4-5 months to get the whole route started. or they can start a small section of the route, but it will surely not be profitable..
metro still not started becoz interior work is still pending .......just today i saw the belapur station and also i think this metro can be opened by this year end or may be nearby diwali
No metro line is more delayed compare to Kolkata metro line 3, it's 13y of suffering for daily commuters and just inaugurated 6km useless part of 16km line.
Hi bro I am from Habra nearby Kolkata our dum dum cantonment to Barasat metro fees from 10years and you know the government does not acquired land after airport to Barasat 😢😢.
Thanks to ET Transit for the video footage- twitter.com/ET_Transit @ET_Transit
Thanks to Droneman for Video Footage - www.youtube.com/@Imdroneman @Imdroneman
sir why india is building metro and bullet train in flyovers not in land
@@Tanmay1332 my guess will be it i sspace efficient
I think you forgot Pune metro
@@Techtips200 its also in flyover as i saw in google
@@Tanmay1332 can you explain ..what
do you want say
Sadly to say I was the 1st Civil Engineer hired for this project in 2011 from the GC side. Corruption and corruption is the only reason for the delay of this project. This was one of the most simple and easiest metro project for construction as the area was almost open for construction as compared to Mumbai.
इस देश के पिछड़ने की वजह बहुत बड़ी बाबू लोग हैं बेउरुक्रेसी है
Last 19 months se Trail chalu hai 😮😮
Bengaluru, Kolkata and Navi Mumbai are known to have metro delays. Otherwise these cities would have been covered like Delhi Metro
Navi Mumbai already has a good public transport system unlike other cities. So tbh I don't need one. Still if we get one good. But no hurry.
@@pranavtripathi791 but why to delay it and wasting time and taxpayers' money
@@pranavtripathi791 it doesn't really. There's barely one harbour line without any fast train services and NM connects with Mumbai at just Vashi bridge. Good things are that Airport and Sewri sealink are coming up. Also this metro 1 plus metro 12 and an expected metro 8 will make more difference. For most people travelling to Navi Mumbai can be nightmare with lack of options.
@@At_sk yes , and 1 day of rains spoils the whole harbour line timetable. dont know what will happen after uran - csmt line starts.....
@@PleasuresOfLife exactly, the rain day earlier this week delayed all trains by about an hour😔
Unfortunately, Bengaluru is giving tough competition to Navi - Mumbai to become India's most slow and delayed metro. 😢😢
Kolkata: U Can't see me!!! 💪
@@harshitsingharya5533 kolkata is real chad🗿
Kolkata says hi
Then also namma metro is far better and well developed
Pune metro is also so slow.
There are lot of projects in Kharghar which are delayed significantly. Like
- Kharghar taloja bridge
- kharghar turbhe link road
- BKC-2
- Children park in sector 18 etc
to name a few.
Only the property rates kept on increasing here during these projects announcement. People have been fooled by CIDCO and developers together.
There are only two roads to get out of kharghar node and there is lot of traffic near monkey point signal. Still there is no planning for new gateway to-from Kharghar and new constructions are going on in massive pace. Infrastructure will be one of the worst in Kharghar in coming years.
I think BKC-2 will take more than 20 years to develop
Kharghar to panvel was in controversial decision between panvel mahanagar palika and cidco which was passed recently and decided that it will be the part of panvel mahanagar palika.
@@abrarmulla4060 development will shift to panvel uran line
ये मेट्रो पनवेल से खारघर होके जुईनगर रेल्वे स्टेशन सानपाडा रेल्वे स्टेशन होके apmc मार्केट फिर वाशी सेक्टर 9 बस डेपो होके वाशी स्टेशन तो ये लोगो को काम आती
@@mp-vy2pz bas Belapur तक ही खत्म , आगे ले जाने का रास्ता ही नहीं छोड़े
All the projects in Navi Mumbai are delayed.
1.Navi Mumbai metro
2.Navi Mumbai airport
3.Naina
4.Panvel railway station redevelopment
CIDCO is so forgiving that it gives blacklisted companies 3rd and 4th chances to do more shoddy work.
I think even after inauguration Navi-Mumbai metro will be loss making and failed metro, as it doesn't travel through high dense area. Many people living around those areas already have their personal vehicle and calculating fare as well as frequency, won't think this metro will much succeed
Public transport is never meant for profit making. I think the local govt should instead encourage more people to take metro, and develop that area more.
Plus even if people have private vehicle, most don't want to go through the headache of traffic, bad road conditions etc. Give it time, it will be successful.
They could make it work of they connect it with metro 1 at ghatkopar or metro 6 at kanjurmarg or metro 2b at mankhurd. Else it's failed project by all means.
@@kracks9852 Agreed, but NM metro can be the next Mumbai mono rail in terms of low ridership. Unlike other cities, Navi-Mumbai has good and wider roads. Specially certain sectors Kharghar where this metro passes from has 4-6 lane roads, having max 10 vehicle any given time.
No doubt in future as these sectors get develop, metro may provide a good alternative.
@@At_sk Kharghar taloja line will extend to Kalyan side
@@At_sk there will be a taloja-kalyan extended line. From here we can get the crowd cause Mumbai's main workforce in Dadar, Andheri and Parel comes from either Thane or Kalyan.
turns out kolkata metro isn't the only one🙂
You forgot about Kolkata metro it took 20 years 😢😢
True 2011 se it's going on🤣🤣
I was a new born kid when it was proposed and now I would be graduating next year, my life is moving faster than kolkata metro project
And still under construction
Modern and advance metro projects may come and go but Delhi Metro will always be an emotion.... Although I am not from Delhi but it's still well managed metro throughout India.
I remember i was in School when metro construction started in 2010 after that i completed high school, jr cllg,sr Cllg,masters nd moved abroad but still NM metro not completed 😢
Bachpan se dekhta aaraha hu navi me under construction metro lol😂😂 but finally abhi 1 2sal me bahot speed me Kam hua he
Corrupt CIDCO officials should be punished for these delays.
Mumbai builder lobby is main reason behind delays, they know prices of mumbai flats will fall due to navi mumbai metro.
Market do not work like this.
@@nochance3914 you don’t know how mumbai is overpriced and how it is controlled by builder mafia and local politicians like UT.
Builder be like: Mumbai me kamao, gujrat me kharch karo....aaa mota bhaiii 😂😂🤣
Kolkata Metro: Finally a worthy opponent 😎
A great videos indeed, everyone including media, government seemed to forgot about the project, also there have been a lot of issues with road construction in new cidco areas like Karanjade, ulwe, etc. Road construction and area development has also been delayed for years just like Navi Mumbai metro.
#AskPT Make a video on Nagpur-goa expressway
That's so true. I was an engineering student back then when metro work started. Took admission in 2011 and now in 2023 I'm moved forward in my career but still whenever I visited Kharghar I see just fraction of work being proceeded. Such a shame for a city which is still one of the best designed cities
WAIT TILL Y OUR RETIREMENT !!
I used to travel from Panvel to Vashi during my DIploma in 2014 and i used to see the Metro construction throughtout the course. Now i have completed my Diploma then my Bachelors, worked for 1 year and again i switch into another filed and again got job......still after all this years this Mtero project is going on, even the Belapur metro's whole construction is not even completed. I hope this project will get completed when my kids will travel from same routes which i used to take.
Sahee baat hai😢😂
And guess what Mumbai Metro Line 14 is consistently being ignored that will connect Ambarnath, Badlapur with Navi Mumbai & Powai. This line being the need of an hour is conveniently being ignored.
They haven't started work on line 8, 9, 10, 11, 12, 13😂
@@At_sk 12 and 11 have started construction
@@jalpasheth5272 nope they just put it finally for tender, no?
@@jalpasheth5272example they haven't even planned what line 8 would look like, where the stns will be while it's supposed to connect Mumbai with new upcoming airport.
And I'm pretty sure metro 14 is not the solution to take people who travel fast train from badlapur ambarnath to ride a much slower metro passing through much more sparse population (creek, mangrove, mountain will take up half the length while a lot of what is land is sparsely populated). I have a guess as more and more metros are built they'll hit a point where they might see this metro 14 as white elephant project and not approve it.
Ur 2 generation will definitely travel through metro in ambarnath...🤣🤣🤣 M from kalwa 🤣🤣🤣 no hard feelings dost .
Thank you for info... I finished studies while seeing metro being constructed, Took job... Switched job... Still after 8-10 years it is not yet started... 😅😂
Same bhai😂
Wow... Very great knowledgeable and truth of navi mumbai metro train updates and project works.
This is really needed for nation.
Another there should be complete enquiry commission and bench should appoint to clear cut details where and whom has actually did what Regularities to stole whole nation or people's money's.
Jai hind... Jai bharat... Jai shree ram...!!!
So Kolkata Metro isn't alone in multiple delays, welcome to the party Navi Mumbai 😂
Small Delay is ok atleast they made a big project like metro idea for a new built city which was a full village some years ago Navi Mumbai,etc. only and they will extend till vashi Mumbai and connect to mmrda also Mumbai metro only and its a blessing that they made such a big budget Navi Mumbai metro Kolkata so advance city many cities dont even have a metro project so its good and it will start soon by this year Navi Mumbai metro or soon maybe they are taking daily trials so government is doing a great step at its side and it started great speed work in past few years so it will start Navi Mumbai metro soon and its big good thing only 30-40 RS ticket ac metro where auto charges 100-200 rs,etc. for distances of taloja-belapur and there are so many poor people schemes,tax money so less collection so many are poor they get so much benifits of tax money still so many good projects Indian government keeps making hats off to government for bringing such a good project and developed it and development. Mumbai metro underground project,ac local trains,non ac,etc. So this is just a misleading fake video it is not delayed or failed it will start soon Navi Mumbai metro,etc. Ok bye.
Legends watching this after Navi Mumbai Metro was inaugurated in 17th november.
#AskPT : What benefits do "Special Purpose Vehicle" Companies like DMRC, NHSRCL, NCRTC, MMRC etc have over existing government/municipal bodies that lets them carry out their assignments quickly, efficiently and without much compromises.
will answer in infranews
@@PowerTrain Thank you !
Ek hath se khane ki jagah do hath se khayenge par efficiency ek hath ka hai 😂. Government ka scam hai sab. Problem create Karo phir problem ko solve karne ki jagah pe ek aur problem create karo
Corruption is India's biggest problem, irrespective of the political party in power.
Corruption is not there see so less tax people pay so many poverty people are government have to serve them free pensions,money,free medicines,etc. still they are regularly developing india with new metro ac trains and so less tickets 30-40 rs respect government they never do corruption's,etc. Ok small scale maybe but they never do big corruption's or corruption as such delay is there small atleast they start this year or soon Navi Mumbai metro only is starting only ok bye.
Everyone knows here in Navi Mumbai that this metro purposefully delayed to Increase it's cost
And they are blaming locals, that we resist, we don’t !,!!!,
You should make video on VIZAG Metro also. Getting delayed from past 12 years.
(despite being top 10 city in terms of GDP)
Great video buddy. Nicely presented and shared a good deal of information.
New update ke hisab se Navi Mumbai metro is mahine (April 2023) shuru karne ka plan hai. Ideally is metro ka value tab badega jab yeh line CBD ke badle Vashi tak extend ho. So maximum navi mumbai cover hoga.
Lets hope it starts.
Navi Mumbai airport giving tough fight, I am from Khandeswar 😎
And after that adani will making tons of money from that airport.
@@Crauniverse instead of Adani why not talk about your beloved congress who is responsible to give this project to corrupt contractors
@@Crauniverse Adani Modi toh abhi aaye hai, real scam toh uske pehle locals bhi khel baithe hai. 😂
Waise ye traditionally bjp constitutecy hai nahi
From Last couples of years we only listening "Opening Soon" 😏😏
FYI,
Harbour (Vashi-CSTM) railway line was inaugurated in May 1992 and the trans Harbour railway line (Vashi-Thane)route was started in 2004
I saw the FIRST digging / pillars for this metro (only trial) come up in 2001-2. This wasn't for the final work, but a trail of the project. Officially it might have started in 2011, but digging etc had started a decade before that! So 20 years+ for a 11kms line...
Sir Make a Video on UP-SCR,Its future and contribution in UP's Economy.#askpt
Kisi bhi city mein metro ka construction karte waqt pehle ek SPV ( Special Purpose Vehicle ) ko appoint Kiya jata hai. MMRC ( Mumbai Metro Rail Corporation ) is responsible for construction Metro lines in Mumbai. Before Maharashtra Metro Rail Corporation is responsible for construction of metro lines in Nagpur, Pune, Nashik, etc. CIDCO has Appointed Maharashtra Metro Rail in 2019 almost 9 years late. Even the Govt of Maharashtra & Govt of India is not interested in construction of this line. Nagpur ko approval 2014 me Mila tha aur 2019 mein operational bhi ho gaya.
Nagpur ke main parts me hai metro isliye bane jaldi.
Very nicely made. Shame on cidco and nmmc. They have looted citizens like anything. This video should be shown as an ad in Navi Mumbai tbh.
What is worst is, they are classifying wetlands and mangroves as commercial lands 😂😂😂 giving it to builders. I just want to move away from this land now, while it’s my ancestral land, I know it’s beyond repair. One major disaster and it will fall.
Please make a video on how Yamuna expressway industrial development authority is taking to the next level for smart city development and developing such a huge land for futuristic city across Yamuna river. It is attracting huge investment and property rates are skyrocketing in the area. Please make another video why “hybrid solar park-Kutch” and Dholera smart city is on a snail paced development
*PowerTrain : Navi Mumbai - India's most delayed metro*
Meanwhile Kolkata metro : *Hold my gorom cha*
CIDCO and the blacklisted companies shud be sued by the Navi Mumbaikars for delaying and wasting people's money. Movie banni chaiye, aur uska title rakho Thugs of Navi Mumbai
Soon, that will happen.
More power to you man! Wat a information very clear on point waah waah
Finally BHOPAL metro got some Competition 😊
Proud Navi Mumbaikar but this is quite a sham. Good that autonomous institutions make Metro projects now, convinced that privatisation helps the country.
Kolkata metro : brother apke daddy aye hai.
Here one metro line joka - taratala took 14 years to cover 6km
Still frequency is 1 hr no signalling system
@@anikaitgupta5569 yes thats why no one using it
Comparison to this, YEIDA, GNIDA, NOIDA are taking a rocket paced development and investment path on the outskirts of Delhi.
Navi mumbai metro is best government is nice that is why they making such big budget projects and cidco is also good so big city navi Mumbai was a full jungle forest area now so big city cidco makes cities and so many cities like navi Mumbai,etc. only are made only ok and navi Mumbai metro will connect to vashi Mumbai also soon and mumbai underground mmrda metro also only so big big budget projects and development are being done and already some metro,trains,etc. Only completed only projects like vande bharat,ac local,mumbai metro,delhi metro so railways is government and private only and government,etc. And all government only is the best only ok bye.
Thanks for making this video 👍👍were waiting for this from your side!!
Uttar Pradesh Metro Rail Corporation 🔥 Lucknow, Noida, Ghaziabad, Kanpur, Agra Metro 🚇
I often visit Kharghar, and the stations are yet to be completed. I don't see this Metro taking off within 2023 atleast.
हमारा प्यारा भारत हमेशा सबके आगे रहेगा।
🚩🇮🇳जय हिंद जय भारत 🇮🇳🚩
Kolkata metro thanks you. Mai Bach gaya
Politician & their Politics🌚🌚
Delhi Metro is also to slow in expansion....
Building one line at once, using all resources makes sense, not all lines using limited resources at same time.
Pune metro is the slowest. Navi mumbai born after independence, has less population than pune, has local train and Local buses with wide roads due to planned city. On the other hand pune has more population than Navi Mumbai, has narriw roads, Has local train but serves only one direction of area. 3rd most traffic city in india. Despite this we have no metro line which is fully completed. Punekars have been waiting since decades.
This is why we need independent body for metro construction and this is why Indian railway should not operate Kolkata Metro
There is a big infrastructure failure in Kharghar Taloja.... Navi mumbai is yet to develop properly
Kolkata is also top notch in delays for metro Project 😂😂.
Patna metro pe bhi ek aisa video banao plzz😊
Excellent video. Unique Topic
your voice gives me feelings 💕
Gay
The Ahmedabad metro is probably the same. The main city of Gujarat got metro delayed and still unconnected with major city points.
Navi Mumbai Metro : " I'm the most delayed metro in India"
Meanwhile ::::: ---
Kolkata Metro : "Hold my Roshogulla" 😂😂😂😂😂😂😂😂😂😂😂😂😂😂😂😂😂
Why is it not connected with Kharghar Station when most commuters travel from Kharghar to Taloja. Aisi planning 1st time dekhi....
If govt wants , they can resolve the issue in few days & complete the project.
Kolkata metro stands 1st in Delayed metro ,is being constructed for era, since 10 years I am watching this 😂😂😂
Navi Mumbai, Mumbai and Jaipur Metro did not fail. The metro that actually failed is Bengaluru Namma Metro. other metros are doing actually better than the Namma Metro.
I wouldn't say so the Jaipur metro and Navi Mumbai metro are as such major failures even Bangalore metro is a bit of a failure due to construction delay and not proper coverage.
Bengaluru Metro had heavy traffic wen i was there in Feb. Why do u call it a failure?
Namma metro over 7 lakh passenger travel
Navi Mumbai is Far away from Mumbai.. why it is named as navi Mumbai.... New name would be better than this one .. and new cities should be built out of Western Ghats...So we can save the our Oldest Forest area😢😢😢
No Navi Mumbai is correct name it will never change it is new Mumbai only and ghats are not proper for humans,etc. Living so ghats are not ok everywhere Navi Mumbai development also is needed for human population growth living so its good development and ghats are also there in Navi Mumbai some only and its not far from Mumbai and future development of fast trains more less time only some 10-20 minutes only distance will be left from vashi Mumbai to Navi Mumbai its not far proper name Navi Mumbai only ok bye.
The one main reason for the delay is CIDCO, they have been pueposely delaying to increase land cost and sell it. The other reason is as you rightly pointed land acquisition, in MMRDA region this is the biggest issue and has multi-nodal agencies with conflicting jursidiction. CIDCO had no expertise in constructing Metro they should have hired DMRC as consultant from the begining and they did that at the last leg of construction. CIDCO is one of the biggest corrupt government bodies in India.
As a citizen of navi mumbai you are right
Belapur and next 2 stations ars still pending. I feel this will start after june.
Comedy show bana k rakh dia CIDCO ne 😁, surprisingly koi kaise blacklisted companies ko tender de sakte h? Chairman ya Head ki position vacant hoti h to har organization me power ki ladai hoti h, ghaple bhi pale k hote h or organization hi suffer karta h. Shocked to see such type of corruption in Navi Mumbai, total governance failure. I hope, Maha Metro will complete the project without much resistance.
Reports have surfaced that Navi Mumbai Metro Lines 2, 3 and 4 are going to be Metro Neo corridors. Can you please make a video confirming the same.
I tell you they're the most corrupted and there should be a case study in college and university, as I stay here from 2007
Mumbai k bi vai hua 2006 mei strt hui 2014 mei vo bi 12km thn 2022 april mei extnd hua 32km ab jake mumbai metro k kam jldi hora ha
Under transfer to Navi Mumbai,, feeling excited 😁
Im becoming old now.. Listening navi mumbai metro, Navi mumbai Airport.. 🤣 Still both projects are yet to complete... God (govt and contractors) knows when will it complete... Government of all parties have been in maharashtra, but situations are not improved..🤷🏽♂️
Till Navi Mumbai will be saturated with more and more people, then only they will start this. Assured return cahiye inhe.
Aisa lag raha hain isase pahle Agra metro start ho jayegi , Jiska construction kuch time pahle start hua .
Cidco should be punished
Persons responsible for delay to be identified and punished.
Small Delay is ok so no one is going to be punished also only and attleast they made a big project like metro idea for a new built city which was a full village some years ago Navi Mumbai,etc. only and they will extend till vashi Mumbai and connect to mmrda also Mumbai metro only and its a blessing that they made such a big budget Navi Mumbai metro Kolkata so advance city many cities dont even have a metro project so its good and it will start soon by this year Navi Mumbai metro or soon maybe they are taking daily trials so government is doing a great step at its side and it started great speed work in past few years so it will start Navi Mumbai metro soon and its big good thing only 30-40 RS ticket ac metro where auto charges 100-200 rs,etc. for distances of taloja-belapur and there are so many poor people schemes,tax money so less collection so many are poor they get so much benifits of tax money still so many good projects Indian government keeps making hats off to government for bringing such a good project and developed it and development. Mumbai metro underground project,ac local trains,non ac,etc. So this is just a misleading fake video it is not delayed or failed it will start soon Navi Mumbai metro,etc. Ok bye.
Good Information
Great work by Ashwini Bhide madam😂😂😂😂
it's not fully complete yet. some stations are still under construction... it will take another 4-5 months to get the whole route started. or they can start a small section of the route, but it will surely not be profitable..
Good work! Keep it up👏👍
Karjat is the fastest growing city for affordable housing
Finally Kolkata got some competition 😂😂
Trans harbour and also harbour line operate in Navi Mumbai along with Nerul uran line
metro still not started becoz interior work is still pending .......just today i saw the belapur station and also i think this metro can be opened by this year end or may be nearby diwali
Kolkata metro:Finally some competition
Me khud 2013 se ab tk construction dekh rha hu 😑
Navi Mumbai metro, Pune metro both metros are too slow.
Madurai metro and Coimbatore metro also delayed metro they announced project in 2019 but now only they take steps in these cities
Noida Extension metro is delayed as well. Even centre hasn't passed it till now
Average infrastructure project in India:- Corruption, delays and protests due to environmental concerns
No metro line is more delayed compare to Kolkata metro line 3, it's 13y of suffering for daily commuters and just inaugurated 6km useless part of 16km line.
Lol Dehradun metro is still under table after 7 years 😂😂😂
vashi mai toh metro ka pillar bhi nhi pohcha :)
Please make video on Pune Nasik train update
I hope it well take next more 10 year to get start of Navi Mumbai metro
Hi bro I am from Habra nearby Kolkata our dum dum cantonment to Barasat metro fees from 10years and you know the government does not acquired land after airport to Barasat 😢😢.