Greenhouse Build - Install the Roof and Rear Windows

Поделиться
HTML-код
  • Опубликовано: 21 авг 2022
  • Had a bit on over the last few weeks so progress has been a bit slow on the greenhouse. Need it finished in 2 weeks. Best crack on.
  • НаукаНаука

Комментарии • 5

  • @valdecirubiratandesouza
    @valdecirubiratandesouza Год назад +2

    Continue prosperando amigo Simon um abraço aqui do Brasil Joaçaba santa Catarina

  • @toddincabo
    @toddincabo Год назад +1

    Looking Good. You may consider more diagonal bracing, like corner to corner X to keep the entire structure from racking much less finding it flat as a pancake after the first good storm.

    • @simonhahnel8092
      @simonhahnel8092  Год назад +2

      It is on the list. One the door and final panels are in will be doing some bracing. Possibly with wire so it does not block the sunlight.

    • @toddincabo
      @toddincabo Год назад

      @@simonhahnel8092 Exactly, use some turn buckles and get those babies tight. Nice work.

  • @valdemirbernardoborges1609
    @valdemirbernardoborges1609 Год назад +1

    Boa tarde do Brasil! 👍