Solar Installation Process - 40 Panel Grid Tie with Ground Mount

Поделиться
HTML-код
  • Опубликовано: 23 ноя 2024
  • The journey to solar gets exciting with the process of installation! Follow the journey as we install the ground mount (Sinclair Design Engineering) as well as build the array and wiring. Thankful for beautiful (although very hot) weather.
    Our system utilizes bi-facial panels with IG8H (the H matters) inverters. These provide optimal panel production.
    0:30 Augering the Holes
    1:15 Concrete and Columns
    2:00 Beams and Purlins
    3:10 Time Lapse of Installation
    5:50 Explanation of the Process
    13:05 Roy Scharf and System Overview
    Scharf Solar - Grove City, PA (724) 372-5908
    40 Panel System - QCells - 485 watt bi-facial
    Inverters - Enphase - IQ8H
    Ground Mount - Sinclair Design Engineering Adjustable
    #enphase #solarenergy #solarpower

Комментарии • 2

  • @JB-xl5kg
    @JB-xl5kg Месяц назад

    Nice job on this installation! I am about to install a similar Sinclair Rack for 48 bifacial panels soon and I was wondering how you've liked the system so far. Is there any recommended maintenance for the metal rack? Grease for the moving parts? Etc. Also, how long did the installation take your contractor? Thanks

    • @ModernCountryLiving
      @ModernCountryLiving  Месяц назад

      Like it a lot thus far. Easy to move. I didn't see anything about lubricating anything, but I went through with fluid film and hit wear surfaces. I figure a little protection won't hurt. The construction of the array tool a few days.