Blue line | ORR METRO | K R Puram to Silkboard DEC 2024 Updates

Поделиться
HTML-код
  • Опубликовано: 27 дек 2024

Комментарии •

  • @parth46767
    @parth46767 15 дней назад +1

    Let me just say that you background music now plays in my head everytime I commute on the ORR.

    • @SunilHP
      @SunilHP  15 дней назад

      @@parth46767 thanks 😊

  • @gamerartificial7208
    @gamerartificial7208 20 дней назад +7

    Use drone shots it will be good from airport to silk board only important places for showing track work

    • @anikethdesai
      @anikethdesai 20 дней назад +2

      NCC releases drone shots of their entire package every month

    • @gamerartificial7208
      @gamerartificial7208 20 дней назад

      @anikethdesai can you send the RUclips channel name

    • @shinoyprahladan
      @shinoyprahladan 19 дней назад

      ​@@anikethdesaiwhere do we get to see that? Any link available?

  • @arjung7633
    @arjung7633 14 дней назад +1

    after 13:12 on the left side what are pillars doing so close to the buildings and 13:28 what are the constructions on the left. Is it for any station

  • @sachinjogi1995
    @sachinjogi1995 20 дней назад +5

    14:28 What are the extra pillars on the right for? Is it continuation of kodibeesanahalli station?

    • @SunilHP
      @SunilHP  20 дней назад +4

      @@sachinjogi1995 that is for train reversal mid way or push trains having problem.

  • @manjunathnarayan5412
    @manjunathnarayan5412 20 дней назад +1

    Great work Sunil👏

    • @SunilHP
      @SunilHP  20 дней назад

      Thanks a lot 😊

  • @madhur3737
    @madhur3737 19 дней назад

    Fabricated piers cap, I griders, U griders, Arms etc no work on site only installation but its must quite speedy R &D still going...Nice info buddy

  • @poms97
    @poms97 20 дней назад +2

    Decent progress after Bellanduru, but no progress near railway overbridge near Marathahalli (maybe due to pending work on Hosur railway doubling works)

    • @SunilHP
      @SunilHP  20 дней назад +1

      Both piers have been cast. and preparation work for cribs which will hold the big girders in place in progress. So fine

  • @rahulrajb14
    @rahulrajb14 20 дней назад

    Said it before, saying it again. Big fan 🙏🏻

  • @amithkashyap5819
    @amithkashyap5819 20 дней назад +2

    @sunil, do you have any idea why in some places they are not using U girder and placing beams or something and at those places the pillar cap also looks different, can you explain it if u know?

    • @SunilHP
      @SunilHP  20 дней назад

      U Girders are used when the piers align in a centreline . Where the pier placement is off centre to the left or right then, pier caps are also eccentric. When eccentricity is beyond limit , even this pier cap cannot be used and hence they opt for portal pier with beam and i-girders are placed above to form viaduct.

  • @vikasn9114
    @vikasn9114 20 дней назад +1

    21:13 why are building small piers on the same lane?

    • @SunilHP
      @SunilHP  20 дней назад +3

      @@vikasn9114 future provision for sarjapur hebbal line - phase 3A to cross from left to right .

  • @osamaaftab4283
    @osamaaftab4283 20 дней назад +1

    Watching it from last one year n wait for one month for the updates.

  • @AbhinavPathak17
    @AbhinavPathak17 19 дней назад +1

    after agara station why are the portals so asymmetrical? one side is way longer than the other.
    also bro what time are you doing this drive how is orr so empty

    • @SunilHP
      @SunilHP  19 дней назад +3

      @AbhinavPathak17 the roads are curvy and hence not in straight line. To keep metro viaduct straight they will have to place the piers on road. To avoid that eccentric piers are used where the piers remain on road median and caps only shift right or left off Centre and helps maintain straight line.
      Mostly always finish my records between 7 to 8.30 in the mornings to avoid rush or sun glare

  • @karthikvenkatachalam1878
    @karthikvenkatachalam1878 19 дней назад +1

    Afcons will delay the blue line by at least a couple of years. IPO money not helping to speed up. Even the option of opening the silk board to kr puram stretch first seems like a pipe dream. Do we know why afcons are stuck from iblur to silk board?

    • @SunilHP
      @SunilHP  19 дней назад +2

      @@karthikvenkatachalam1878 what is IPO money got to do with this project .. working capital is all tied and they get reimbursed monthly for work completed as and when they raise invoices by Metro. Delay is due to split flyover requiring LG to launch U girders and hence bringing a small amount of serialization

  • @abhijith6276
    @abhijith6276 20 дней назад

    What is D loop and E loop piers? Why is it used?

    • @SunilHP
      @SunilHP  19 дней назад

      @@abhijith6276 these qre silkboard junction improvement plan executed by metro . Already you see A, B and C commissioned . D LOOP is from HSR side to BTM crossing over SB flyover and connecting to double decker. E LOOP is down ramp post SB yellow station , if you don't want to go till ragi Gudda where the double decker terminates

  • @siddarth24987
    @siddarth24987 20 дней назад

    Why are U girders placed on alternate spans in many places. Any reason?

    • @SunilHP
      @SunilHP  20 дней назад

      @@siddarth24987 apparently it makes it easier for the LG to move over it without modifications. Else the front support will have to modified to allow it to traverse U girders already placed.

  • @zubaankaghulaam5311
    @zubaankaghulaam5311 20 дней назад +1

    I assume 2.5 more years until commissioning

    • @nithinkumarr2923
      @nithinkumarr2923 19 дней назад +1

      2026 September is the dead line.. also work going smoothly.. incase if delay happens, it might takes 3 to 4 months to complete..

  • @CraigDSouza-xo4te
    @CraigDSouza-xo4te 20 дней назад

    Why are some pillars squared while others are rounded?

    • @SunilHP
      @SunilHP  19 дней назад +1

      @@CraigDSouza-xo4te @AbhinavPathak17 the roads are curvy and hence not in straight line. To keep metro viaduct straight they will have to place the piers on road. To avoid that eccentric piers are used where the piers remain on road median and caps only shift right or left off Centre and helps maintain straight line. Almost all eccentric piers are square in shape for extra reinforcement and load profile being different than a circular pier with pier symmetrical pier cap

  • @gamerartificial7208
    @gamerartificial7208 20 дней назад

    Once try to do from silk board to airport

    • @SunilHP
      @SunilHP  20 дней назад +1

      Actually A lot of depends on the time of the day. Mornings when i generally shoot, SB to KRP is not possible since Sun will be directly in front. and between Hebbal to Airport shooting from the other side wont help. hence have to split up

  • @sudhisubbu5852
    @sudhisubbu5852 18 дней назад

    BMRCL has told that airport to Hebbal metro might commence first out of three but by the looks of it Kr pura to CSB looks to be in more advance stage
    Which one do you guys think will open first

    • @SunilHP
      @SunilHP  18 дней назад +2

      @@sudhisubbu5852 I think a small confusion here . KR Pura to CSB Is ORR metro and in all probability will open first. The news article that came out earlier is about Airport line which is KR Pura to Airport via Hebbal. So in this , KR Pura to Hebbal will time whereas Hebbal to Airport can be operational operationalized earlier among the two.

    • @sudhisubbu5852
      @sudhisubbu5852 17 дней назад

      @@SunilHP ohhh i see thanks a lot

    • @anooprao4969
      @anooprao4969 16 дней назад

      ​@@SunilHP If at all KR Puram Hebbal line get's delayed. Wouldn't it be wise to connect Airport to nagawara, given that Pink line would be completed by that time. So as to provide seamless connectivity atleast for people headed towards Mg Road or Bannerghatta. Rather than go for the feeder bus Mess.

  • @anikethdesai
    @anikethdesai 20 дней назад

    Why is the number of U-Girders for Marathahalli zero?

    • @SunilHP
      @SunilHP  20 дней назад

      Due to crane positioning and launching constraints, they may use i-girder span.

  • @sathyamanikanta2784
    @sathyamanikanta2784 20 дней назад +3

    2027 June or December opening ceremony 😊

  • @rakshithkumarms9450
    @rakshithkumarms9450 20 дней назад

    Hebbal to kr puram video?😢

    • @SunilHP
      @SunilHP  20 дней назад

      @@rakshithkumarms9450 working on it. Will be published in sometime

  • @rprahalad396
    @rprahalad396 19 дней назад

    Afcons are slow they may drag opening by June 2026.

    • @SunilHP
      @SunilHP  18 дней назад +1

      @@rprahalad396 they have picked up pace . Hopefully will be able to wrap up sooner

    • @ayushgarg7033
      @ayushgarg7033 16 дней назад

      Nothing is opening before 2026 end anyway

    • @anooprao4969
      @anooprao4969 16 дней назад

      December 26 is the most optimistic scenario for complete Pink and Blue line

  • @AllInOne-bv1ti
    @AllInOne-bv1ti 13 дней назад

    Local train far better than pillar metro

  • @ganesh3663
    @ganesh3663 20 дней назад

    I think tracker needs update 🙂

    • @SunilHP
      @SunilHP  20 дней назад

      @@ganesh3663 what Tracker?

    • @ganesh3663
      @ganesh3663 20 дней назад

      @SunilHP online excel tracker 2A 2B tracker

  • @vijethkumar6549
    @vijethkumar6549 20 дней назад

    2026 December is still intact