Killer work man always love watching your content just wrapped up my second med gas job, question for you How did you keep flow of nitrogen while trying to braze on those caps ? So I know for future reference
So we know what line is which,we can tell by the diameter. If we are uncertain about the lines, we can flow our purge and verify it. The pipes do not need to be labeled inwall, it may also be up to the inspector if they need to be, we also have drawings of the individual rooms/ headwall units !
Killer work man always love watching your content just wrapped up my second med gas job, question for you How did you keep flow of nitrogen while trying to braze on those caps ? So I know for future reference
So we know what line is which,we can tell by the diameter. If we are uncertain about the lines, we can flow our purge and verify it. The pipes do not need to be labeled inwall, it may also be up to the inspector if they need to be, we also have drawings of the individual rooms/ headwall units !
It’s really clean Work but Why is not labeled?
If in future something happened and had to do pipe tracing it will be hard to do that.
What are those supports called? The ones you use on your stub outs Im having a hard time keeping mine straight when I go to braze
They are called hico couplings or sometimes called baker couplings.