@@ConstructionMachinesChannel well neither of you understand physics, nor the weight of the material nor the time it takes for a wheel loader to dump a single bucket
Bench too high for a start , floor not tidy, tyres must be cheap , if your on a loader use it like a dozer don’t empty the bucket use the dirt in it for traction, excavator needs to jump tracks over or split the bench and double bench
Good work boys!
What if excavator would dump rock don to front lader to load dumpers?
That guy on the loader doesn't no what hes doing how many trucks are w8ing to get loaded
what if you are not allowed to blast?
and believe me, the cement production of this quarry is enough
that is a small bucket, how many passes?
Over cutting height
Raffy Lamaclamac agree height should match the dump trucks tray height, the operator is leaving a messy floor because of it.
I was thinking the same, an old operator once told me that if I feel comfortable working the machine is comfortable too
Look at that clown walking around in the work area
ugly small bucket , wheel loader with 150% Light Weight has bigger bucket .O&K RH120-E has 284 ton !
Yeah. Thinking it would be more productive to get the wheel loader to load the dumptrucks instead
@@ConstructionMachinesChannel well neither of you understand physics, nor the weight of the material nor the time it takes for a wheel loader to dump a single bucket
They dont blast. So the RH is not only a loader, its also a ripper.
Bench too high for a start , floor not tidy, tyres must be cheap , if your on a loader use it like a dozer don’t empty the bucket use the dirt in it for traction, excavator needs to jump tracks over or split the bench and double bench
ㅋㅋㅋ 숏붐이라 ㅠㅠㅠ