[12 Locomotives!] Long BNSF Train Hauling Through Tehachapi Loop

Поделиться
HTML-код
  • Опубликовано: 30 июл 2024
  • Worth the 50 minutes wait at the Tehachapi Loop
    ==Locomotives==
    Leading:
    GE ES44C4 BNSF 4202 + 7071 + GE C44-9W BNSF 4759 + GE ES44AC BNSF 6151 + GE ES44C4 BNSF 4254 + 8216
    Mid-DPU:
    GE ES44DC BNSF 7299 + GE ET44C4 BNSF 3873 + GE ES44AC BNSF 6213 + 5970
    End-DPU:
    EMD SD70MAC BNSF 9738 + EMD SD70ACe FEX 4051 (Ferromex)
    ==Timestamps==
    0:00 intro
    0:17 Leading Locos
    1:39 Crossing Broome Road
    2:13 Lead Locos Closeup
    2:57 Train Looping
    3:13 Mid DPU
    4:15 End DPU
    4:41 Outro
    Filmed 6/18/23

Комментарии • 18

  • @sergiochavez9577
    @sergiochavez9577 9 месяцев назад +2

    Ferromex wahoo nice thank you awesome video,

  • @paulmcnamara6325
    @paulmcnamara6325 9 месяцев назад +2

    Wow some length!! Magic😊

  • @marcocamberos6093
    @marcocamberos6093 4 месяца назад

    Heeey whuat hapent with the little ranchito that was in the midle of the track rails

  • @natesmainlinevids
    @natesmainlinevids 6 месяцев назад +1

    If you would total the amount of HP given by those locomotives since 10 of them had 4400 horsepower each and the last two had 4300 each, that would give you a strong total of 52,600 horsepower. I even saw a 12 engine Intermodal at Hill 582 in April 2022 with 11 GE’s having 4400 each and an ACe giving 4300, resulting in it having 100 more horsepower than what you got here.

    • @BlueMouse08
      @BlueMouse08  6 месяцев назад

      Thanks for the calculation!

    • @bertferri-5685
      @bertferri-5685 5 месяцев назад

      Don't forget, not all of them are firing up. Some are just being returned to the marshaling yards to be used as auxiliary power for the next trains going up the grade. They're going downhill, there's no need to be wasting fuel for that.

  • @maschwi
    @maschwi 7 месяцев назад +2

    You were lucky with only 50 minutes wait. I was there twice half a day and saw only one train...

    • @BlueMouse08
      @BlueMouse08  7 месяцев назад

      Sorry to hear about that, but don't give up, one day you will see more!

    • @NorCaliRailroading2023
      @NorCaliRailroading2023 5 месяцев назад +1

      You might have been there during the derailment, the Tehachapi is a very busy route seeing both UP and BNSF

  • @thomastarwater2989
    @thomastarwater2989 8 месяцев назад +2

    The Tehachapi Loop should be the Eighth Wonder Of The World.

  • @caisuki
    @caisuki Год назад +1

    wawa

  • @faruklezgi4743
    @faruklezgi4743 8 месяцев назад +1

    Сколько вагонов ,какая длина и вес поезда?

    • @BlueMouse08
      @BlueMouse08  8 месяцев назад +1

      About 110 cars plus the 12 locomotives which is 72 feet, and considering the average length of the railcars are around 60 feet, the total length is approximately 7464 feet (2275 meters), and the weight of the train depends on if the train is empty or not, which I do not know, but I hope that will answer your question.

    • @faruklezgi4743
      @faruklezgi4743 8 месяцев назад +2

      ​@@BlueMouse08Спасибо друг, да очень помог 👍

    • @TimD1952
      @TimD1952 7 месяцев назад +1

      Look at a cars springs to determine if a car is loaded or empty...loaded cars have the springs compressed and empties have a space between the springs.

    • @BlueMouse08
      @BlueMouse08  7 месяцев назад

      Thank you for pointing out!@@TimD1952