Day 2 - Starting Dirt Work 8-21-24

Поделиться
HTML-код
  • Опубликовано: 22 окт 2024
  • We are getting the dirt work stated. This project requires us to removed several thousand yards of native soil, then replace that soil in 8" lifts with moisture conditioning and compaction. This will stabilize the soil the reduce the potential for soil movement.

Комментарии •