Mumbai-Ahmedabad high speed rail aims to cut travel time by up to two-thirds

Поделиться
HTML-код
  • Опубликовано: 20 окт 2024

Комментарии • 261

  • @Boldtruths
    @Boldtruths 5 месяцев назад +215

    People who are comparing Indian Bullet train project with Indonesia...
    Must Understand...
    In Indonesia Chinese workers and Chinese machines are doing the majority of work with Indonesian workers.
    **But in India L and T(an Indian company) is doing the construction.**
    **Electrical overhead wiring work will also be done by L and T**
    Machines are also built and operated by Indian engineers. Only Chief engineer comes once a while from Japan to see progress and modifications.
    **So technically India is learning how to make bullet train project**
    **Just like we learned how to make world class Metro infrastructure**
    And also JAPAN'S bullet trains are safest and best in the world.
    "So asking for help again n again in future from Japan is not what India is thinking."
    That's why it is taking time.
    Additional info -- Indonesia's route length is 142 km with 4 stations.
    **India's route length is 508 km (476 km elevated on pillars, including 21 km undersea tunnel) with 12 stations.**
    "Also, Undersea tunnel will be made by AFCONS which is also an Indian Company.
    So, it will take time.
    *Source-Wikipedia.

    • @tanveerahmad72
      @tanveerahmad72 5 месяцев назад

      Afcon is the French company. Google it.

    • @aburetik4866
      @aburetik4866 4 месяца назад +17

      lndonesian bullet train project finished on schedule and now is in full operation, but how many times has the lndian project been delayed and can it finish before 2100? 😅
      No one should ever employ lndian construction company

    • @Boldtruths
      @Boldtruths 4 месяца назад +60

      @@aburetik4866 That same company
      Built...
      *world's tallest statue.
      *World's biggest cricket stadium.
      *World's highest railway bridge.
      *India's first Undersea Road tunnel.
      *India's longest sea bridge of length 21 km.
      *Rocket for chandrayaan 3 mission which made India to reach on moon's south pole for the first time.
      *It is worth more than 20 billion dollars and it operates in more than 45 countries.*
      *Metro in more than 12 cities of India.
      So before using fingers use brain cells.
      142 km

    • @Someone-wh8hi
      @Someone-wh8hi 4 месяца назад +6

      and they are building it very fast.
      of course europe/us has other standards as well as high environmental hurdles, but high speed rail takes for ever in these countries.

    • @udhayakumarMN
      @udhayakumarMN 4 месяца назад +2

      But
      Time is money

  • @moonbalancedd
    @moonbalancedd 5 месяцев назад +109

    Missing key details: It's the shinkansen bullet train being built from Japan which has an impeccable record at 320kmph. Japan is also financing 90% of the costs as a 0.1% interest 50 year loan with a 15 year moratorium at the start. Practically free transfer of technology and project.

    • @daipayanbhowal8914
      @daipayanbhowal8914 5 месяцев назад +21

      Japan is financing but majority of technology is being developed in-house by L&T even new construction methods and also Vande Bharat based Bullet trains will made by RCF & BEML

    • @moonbalancedd
      @moonbalancedd 5 месяцев назад +10

      @daipayanbhowal8914 that is correct. Manufacturing is local, only technological expertise is obtained. Which is crucial because bullet train is a completely different challenge than even vande bharat trains. The smallest of things like vibrations and movement of the tracks, inclination, declination, curve, air pressure is strictly controlled. The tracks are specially constructed. India does not yet know how to do this but learning from Japan which has perfected this, it will make it's own in house bullet trains in the future.

    • @minalkumari9556
      @minalkumari9556 5 месяцев назад

      No bro, its 108000 crore and japan is giving about 80000 crore rest by states and centre ​@@wretfsfvd

    • @xcel5203
      @xcel5203 5 месяцев назад

      Japanese bullet train technology is the costliest; it has not been used anywhere else. As for cost the Japanese are in it for profits and are not doing a social service. As for technology they will never transfer the most sophisticated proprietary technology to any other country ; you're kidding yourself if you believe it .

    • @aryaman05
      @aryaman05 5 месяцев назад +2

      Most 'expert analysts' seem to miss this point, i.e.: this project is essentially a gift from Japan.

  • @Anonymous-dy2zu
    @Anonymous-dy2zu 4 месяца назад +59

    Indonesians incoming by comparing their 160km of hsr with 500km of hsr completely built by our indian companies with strong Japanese assistance, rather than chinese contractor who are wholly constructing the whole project with their equipments and workers with very less technology transfer
    Edit: I am not comparing both countries bullet train technology as Japan and China both countries mastered the HSR technology, infact china has the most hsr train network of more than 45000+ km

    • @cardano5122
      @cardano5122 4 месяца назад +4

      You dont even have 1 hsr in jr country lol , why do they even bother to compare with urs . If u got one then talk after that

    • @Anonymous-dy2zu
      @Anonymous-dy2zu 4 месяца назад

      @@cardano5122 bruh, Its your people on RUclips who always yapping about how your train is superior than Japanese technology, Mocking India by saying that our HSR is so delayed, Is China is selling propoganda with projects now 🤡

    • @asepsyaepudinfirdaus1456
      @asepsyaepudinfirdaus1456 4 месяца назад

      @@cardano5122 wkwkw nice one

    • @kuldeeprana1908
      @kuldeeprana1908 4 месяца назад +2

      ​@@cardano5122please cry harder...lol 142km bullet train track 😂🤣🤣

    • @GTR-88-u8g
      @GTR-88-u8g 3 месяца назад +2

      even when done india will be using slower japanese tech at 320km/h max and yes china have transfer the tech to indonesian ,india worry about their own wholly constructing , 13 brigese fall even delhi airport collosped

  • @mrknownothing2470
    @mrknownothing2470 5 месяцев назад +52

    For the God sake bring local reporters who can pronounce proper name of cities and provide correct information.

    • @nps7742
      @nps7742 4 месяца назад +1

      Ita a US channel why would they do that at least he is from indian heritage. They don't have broadcast here

    • @carstarsarstenstesenn
      @carstarsarstenstesenn 4 месяца назад

      easier said than done. they're not gonna hire a local for one little story when they can just have an employee do it

    • @jerrysingh9152
      @jerrysingh9152 4 месяца назад +1

      Indian reporter speaks in 2 languages at the same time, listening from USA how can I understand

  • @gopikrishna2043
    @gopikrishna2043 5 месяцев назад +61

    BJP for next 3 decades, INDIA will be best place to live.❤

    • @deeplife9654
      @deeplife9654 4 месяца назад

      Lolz.

    • @GTR-88-u8g
      @GTR-88-u8g 3 месяца назад

      A bridge collapsed in Bihar on Wednesday, making it the 13th in 2 weeks and even delhi airport collapsed

    • @chengxin2928
      @chengxin2928 Месяц назад

      Endia is already the Best place for Indians.

  • @zanjeer7827
    @zanjeer7827 5 месяцев назад +65

    so you will report some baseless accusation by opposition in the news?

    • @kamadotanjiro3118
      @kamadotanjiro3118 5 месяцев назад +5

      I mean they are the news so they should report it, people can choose to look at it if it's true or not.

    • @zanjeer7827
      @zanjeer7827 4 месяца назад

      @@kamadotanjiro3118 Everything is in the news. It's just an accusation, so the report should also say it's an accusation by the opposition. It should not be reported as a fact. And that is the game plan of lefties.

  • @TheKenzhang
    @TheKenzhang 4 месяца назад +7

    India need to step up in the high speed railsconstruction,10 years for 500 kilometer high speed rail is too slow, China has already had 45000 kilometer high speed rail With current speed they need at least 1000 years to catch up with China

    • @bismayparida2115
      @bismayparida2115 4 месяца назад +2

      There are other routes coming after this.... It is not the only HSR route

  • @RoRZoro
    @RoRZoro 4 месяца назад +18

    Why are these Indonesians coming here and are bashing Japan and India while praising China? Don't compare the 500+ KM rail with the 140 KM Indonatian HSR. Indonesia just opened a small part of their HSR and is mocking India for "slow construction". If you want to compare, then compare it with the full 600 Km section up to Surabaiya or at least up to Madiun. It will take decades for Indonesia to finish it up to Surabaiya while India will run 500+ KM in the next 2 or 3 years.

    • @ZweiZwolf
      @ZweiZwolf 4 месяца назад +4

      Indonesia finished the first segment and is operating today. India hasn't finished anything in a decade.

    • @jimmylam9846
      @jimmylam9846 4 месяца назад +4

      ..........then you could even laugh louder at Vietnamese HSR Japanese project 1500 KM completion dated 2045.

    • @atharvatar
      @atharvatar 4 месяца назад +14

      ​@@ZweiZwolf we have already completed viaduct that is longer than indonesia. Its still in construction so we can't open it do you have even the tiniest amount of sense in your head 😂

    • @ZweiZwolf
      @ZweiZwolf 4 месяца назад +2

      @@atharvatar "It's still in construction so we can't open it". Doesn't count then. Make a noise when it's actually working.

    • @atharvatar
      @atharvatar 4 месяца назад +7

      @@ZweiZwolf but this channel isnt even indian and the topic isnt about indonesians. Youre free to not watch and comment. Thank you.

  • @Usb-ls5rq
    @Usb-ls5rq 4 месяца назад +11

    2:42 as it was expected from an US news outlet you didn't forget to peddle disinformation,
    All the contract are given via process of public tender whichever company bids for the lowest and fulfills all the required criterias gets the contract.

    • @jimmylam9846
      @jimmylam9846 4 месяца назад +1

      Modi gave AFCON $500 M contract in Maldives in which the company has no experience building a sea bridge.

    • @Usb-ls5rq
      @Usb-ls5rq 4 месяца назад

      @@jimmylam9846 are you an idiot or what? nothing is granted to anyone whichever company wins the tender for a project with their plans and bid gets to work on it.

    • @Usb-ls5rq
      @Usb-ls5rq 4 месяца назад +4

      @@jimmylam9846 don't use stupid logics, the company which won the tender by their plan and bidding got the contract.

    • @kuldeeprana1908
      @kuldeeprana1908 4 месяца назад

      ​@@jimmylam9846 you really have low iq.. Afcons is not Indian company.. Why would modi give a project in maldives to afcons.. He would have given to Adani Or ambani... Afcon won the tender because of low bidding.. Do you even know how tenders are given in India?

  • @anujsethi7845
    @anujsethi7845 4 месяца назад +4

    In India work is very slow The government just loves headlines.

    • @basant0077
      @basant0077 4 месяца назад +7

      4 saal to rok kar rakha project ko udhav sarkar ne warna 2024 mein hi complete hojata ab 2026-27 mein hoga.

    • @darshan5726
      @darshan5726 4 месяца назад +3

      COVID and maharashtra govt stalled this project

  • @TheMaverickanupam
    @TheMaverickanupam 4 месяца назад +3

    Mumbai needs to invest first in intra-city and inter-city travel before interstate because the trains are jam-packed, unsafe and uncomfortable. This is a vanity project that ignores the ground reality.

  • @modern.monkE99
    @modern.monkE99 4 месяца назад +6

    ❤❤❤ India is a timeless Adventure ❤❤❤.

  • @huanghermann5207
    @huanghermann5207 4 месяца назад +2

    When this HSR will be open?

  • @MatthewShane
    @MatthewShane 4 месяца назад +1

    meanwhile indonesia is already planning an extension to its second major city surabaya, in total it'll be 900km. I think its better if india work together with china instead for future hsr projects

    • @Imranali-h7k5l
      @Imranali-h7k5l 4 месяца назад

      No body can trust Chinese technology for long term Japanese technology is reliable and much more safe

  • @jerrysingh9152
    @jerrysingh9152 4 месяца назад +3

    Indian roads are the most dangerous in the world 😮

    • @easwaransanthakumar297
      @easwaransanthakumar297 4 месяца назад

      As an patriotic Indian I support your statement.

    • @Imranali-h7k5l
      @Imranali-h7k5l 4 месяца назад

      What about your country 😂 with no roads atleast we have

    • @Imranali-h7k5l
      @Imranali-h7k5l 4 месяца назад

      ​@@easwaransanthakumar297 don't support u

  • @Advaith..
    @Advaith.. 5 месяцев назад +14

    Jai BJP!! Jai Modi!! 🚩

  • @iXpress
    @iXpress 4 месяца назад +9

    Need between Bangalore - Mysore - Chennai

    • @parikshitsharda4377
      @parikshitsharda4377 4 месяца назад +11

      Not possible with DMK in Tamil Naddu and Kongress in Karnataka, they will create hurdles in land acquisition like Maha Aghadi did in Maharashtra. Kerala has been building the silver line our what in the air for two decades now. Only BJP can implement projects.

    • @alileevil
      @alileevil 4 месяца назад

      @@parikshitsharda4377 Typical nonsense sprouted by an misinformed BJP supporter. The Vande Bharat trains, UPI scheme, GST, the Bangalore-Mysuru Expressway, the Metro rail project in Delhi and even the Mumbai-Ahmedabad high speed rail corridor, were budgeted and initiated during congress rule. These project take time to implement. Modi is taking credit for things he has not done. What exactly have the BJP Govt done in Karnataka since they took power? Did they improve the infrastructure? No. Did they improve sanitation? No. Did they cut down on corruption? No. All they did was raise electricity prices. Thank goodness for Congress who has made bus travel and electricity free. At least our tax money is used for the benefit of people and not going into the hands of Ambanis and Adanis.

    • @Mihirpatel6162
      @Mihirpatel6162 4 месяца назад +9

      ​@@alileevil so called "Well informed" Khangressi supporter !!! 😅😂

    • @alileevil
      @alileevil 4 месяца назад

      @@Mihirpatel6162 Mr Patel please do your research before believing WhatsApp posts by BJP IT cell dept. India and Japan signed a MoU to undertake a joint feasibility study of the Mumbai-Ahmedabad route in New Delhi in September 2013. This is before the Modi Govt came to power.

    • @Nmax
      @Nmax 4 месяца назад +2

      ​@@alileevilCongress Party makes big sky high promises then does nothing but play divide and rule and lines the Congressi politicians pockets
      The BJP has vision and gets things done.

  • @jkardez4794
    @jkardez4794 4 месяца назад +2

    India has got the worst road accident rate in the world. Biggest rail system but again terrible safety record with accidents taking place regularly . Politicians only brag about GDP without talking about standard of living ; consequently millions of Indians are deserting the country and going to USA,UK,EU etc. PM loves visiting foreign countries and giving "Jadu ka Jappi " to everyone but not giving same treatment to poor Indian citizens . Bullet train is only for PM's friends in the state while ordinary Indian citizens have to travel in terrible conditions . 2,00,000 crores is wasted on one sector while rest of India doesn't have basic infrastructure for rail travel .

  • @allied42
    @allied42 5 месяцев назад +3

    Our railways should also explore push and pull technology for Mumbai ahemdabad route and other such routes around india .....cos ppl who can't afford bullet tickets can atleast experience on time and faster travel by our Indian railways at affordable rates

  • @showsnooker9285
    @showsnooker9285 4 месяца назад +2

    talk,talk ,talk

  • @reganjoans
    @reganjoans 2 месяца назад

    Whats the rush in bring out all frauds, scammers and commission shop owners from guju rat into mumbai?

  • @anantchhabra8407
    @anantchhabra8407 5 месяцев назад +8

    ANOTHER REASON TO VOTE FOR BJP ❤❤

  • @zzgreyhat3886
    @zzgreyhat3886 4 месяца назад +5

    china built 40,000 km high speed rail in the same period

    • @KishanKumar-qz1kt
      @KishanKumar-qz1kt 4 месяца назад +8

      Only to know that it doesn't required

    • @parikshitsharda4377
      @parikshitsharda4377 4 месяца назад +3

      Yes, they built most routes for the sake of it. It is incurring huge losses now. Not to mention ghost cities that they built, well jut to show off. Bet not even 10,000 km of the routes are viable. Chinese have this madness to overdo everything just to show off.

    • @zzgreyhat3886
      @zzgreyhat3886 4 месяца назад +3

      @@parikshitsharda4377 china debt to gdp ratio is much lower than india

    • @ZweiZwolf
      @ZweiZwolf 4 месяца назад +2

      @@parikshitsharda4377 Chinese HSR generates 8% ROI, so it's a good, viable investment. Same with prebuilding cities to avoid Indian-style slums. 45,000 km HSR is not yet enough, and China currently plans expansion to 70,000 km HSR by 2035. What's shocking is how many countries with big urban corridors still lack HSR to connect them.

    • @MohitKumar-nj8ms
      @MohitKumar-nj8ms 4 месяца назад +7

      @@zzgreyhat3886 its actually much higher..China debt to gdp ratio is 287% while India has only 82%..stop reading from Twitter University 😂

  • @deeplife9654
    @deeplife9654 4 месяца назад

    This project will cost 💲 two times more than originally estimated due to huge corruption 😂😂😂😂, not delay.

  • @kalpeshwani8520
    @kalpeshwani8520 4 месяца назад +3

    Cut travel time?..........how?
    Even bullet train aren't on state path route..,

    • @rmgeneral8554
      @rmgeneral8554 4 месяца назад +4

      Bhai you don't have any work to do with big cities doesn't means anybody else don't have work there.

    • @parikshitsharda4377
      @parikshitsharda4377 4 месяца назад +4

      Chinese opium kha ke aye ho kya. Believe in your own capacity also. Don't trash everything. State path or straight path? Could not understand. Arre kahna kya chahte ho?

  • @xuxu-ql3ho
    @xuxu-ql3ho 4 месяца назад +2

    中国人民向印度人民致以崇高敬意

  • @jarrodyuki7081
    @jarrodyuki7081 4 месяца назад

    8 pills a day until may 31 then four pills a day until july 4!!!!!!!!!!!!!

  • @iheights
    @iheights 4 месяца назад +4

    What about existing railway system in shattered position where lakhs of people travel every day
    So called vande Bharat and other costly trains are running late every day upto 3 hours
    Why railway is not trying for punctuality ??

    • @parikshitsharda4377
      @parikshitsharda4377 4 месяца назад +7

      Bhai, itna bhi generalize mat karo. Kongress had made railways inefficient, stinking, dirty, never on time. Lagta hai acchi cheez pachti nahin tumko. I have caught several trains from delhi over the past few years, all were bang on time. Stop spreading lies. India could not develop because kongress had bred a whole community of pessimists like you over the 55 years that they ruled. Na to khud kucch accha karenge, aur koi aur kare to uski taang kheenchenge.

    • @iheights
      @iheights 4 месяца назад

      @@parikshitsharda4377 you can check the status of 22477 of last 2 month
      You will get to know my point

  • @Landshark2020
    @Landshark2020 4 месяца назад +5

    With over 1 billion people living in extreme poverty India needs to tackle that first

    • @devamjani8041
      @devamjani8041 4 месяца назад +39

      Get educated

    • @Landshark2020
      @Landshark2020 4 месяца назад +3

      @@devamjani8041 yes they need education also

    • @NirajKumar-wb5hg
      @NirajKumar-wb5hg 4 месяца назад +6

      ​@@Landshark2020why u need to concern?

    • @Landshark2020
      @Landshark2020 4 месяца назад +1

      @@NirajKumar-wb5hg I’m not. Just stating facts.

    • @zga3020
      @zga3020 4 месяца назад +4

      Outdated data

  • @jarrodyuki7081
    @jarrodyuki7081 4 месяца назад

    i have 9 accrods with roommates 6 5 accords with mom three accrods with the hoa and four chores!!!!!!!!trash duty laundry floors cirucit breaker!!!!!!!!!!!!!!!!!

  • @jarrodyuki7081
    @jarrodyuki7081 4 месяца назад +1

    1. trash duty 2. laundry 3. floors and 4. the circuit breaker!!!!!!!!!!!wd 40 lightbulbs and smoke detector!!!!!!!!!!!!!!

  • @chinmaykamalapurkar16
    @chinmaykamalapurkar16 4 месяца назад

    Lolz one more prapoganda news😂😂😂

  • @jarrodyuki7081
    @jarrodyuki7081 4 месяца назад

    1. one child policy 2. one party state 3. asian development model and 4. the keiretsu system!!!!!!!!!!!!1

  • @jarrodyuki7081
    @jarrodyuki7081 4 месяца назад +1

    1. brics vs g7!!!!!!!!!

  • @huanghermann5207
    @huanghermann5207 4 месяца назад

    Let us all watch whether it will be open by 2026 as promised. It has been delayed for decades now.

  • @jarrodyuki7081
    @jarrodyuki7081 4 месяца назад

    1. trash duty 2. laundry 3. floors and 4. the circuit breaker!!!!!!!!!!!!1

  • @wwerfjk
    @wwerfjk 4 месяца назад

    its vanity project , west of money . People don't have water to drink.

  • @Oceansta
    @Oceansta 4 месяца назад

    It's going to be a white elephant.

    • @KishanKumar-qz1kt
      @KishanKumar-qz1kt 4 месяца назад +1

      No it will not. Per capita income of Gujarat and Maharashtra is more than national average and it is increasing fast. If it extended upto delhi than almost 100 million urban population will be connected like delhi ncr 30 million. Mumbai metropolitan 25 million. Ahmadabad surat vadadora 25 million. Jaipur udaipur Ajmer 10 million around

    • @Oceansta
      @Oceansta 4 месяца назад

      @@KishanKumar-qz1kt check the ticket price of Shinkansen for 500 kms (Tokyo to Osaka). It's the same distance from Mumbai to Ahmedabad. Next, for the sake of the argument let's say the ticket will be half the cost ( even though it won't coz Japan already recovered their investment on capital a long time ago and we haven't even started). I've traveled by Shinkansen in Japan for 1 month. Even normal Japanese people don't use it there. It's extremely expensive even for Japanese standards. Only Japanese businessmen use it. Next , who will pay 5,000 for a Bullet train when flights are available for 2-3K. Nothing about this project makes any sense other than that Modi has been friends with Shinzo. It will eventually run in losses = public of India will be subsiding travel for a fraction of one percent of the population. If you are thinking that it will be used as a local train and 100 million potential ridership, you're dreaming.
      It will be a white elephant. Mark my words.

    • @prathamsoni4424
      @prathamsoni4424 4 месяца назад

      @@Oceanstaur not getting the points it will motivate gonna use by every person but people who handles business in this city their employees they will use this trains n which will reduce the traffic from local trains n flights also it will create good revenue for gov to build more

    • @Oceansta
      @Oceansta 4 месяца назад

      @@prathamsoni4424 this comment will be here even 10 years from now. Let's revisit and see who is right .

    • @prathamsoni4424
      @prathamsoni4424 4 месяца назад

      @@Oceansta challenge accepted 🐅🐅🐅

  • @celebrityrog
    @celebrityrog 4 месяца назад +1

    The more I see India the more I do not want to visit.

    • @KishanKumar-qz1kt
      @KishanKumar-qz1kt 4 месяца назад +12

      No body is inviting you either. Don't bother about india

    • @parikshitsharda4377
      @parikshitsharda4377 4 месяца назад +3

      As if we are dying to have you here, stay where you are.

    • @gauravmandal951
      @gauravmandal951 4 месяца назад +1

      Get a job first

    • @jasonchu6304
      @jasonchu6304 4 месяца назад

      Thinking about Garbage India made me 🤢

    • @jerrysingh9152
      @jerrysingh9152 4 месяца назад +2

      Nobody cares 😮

  • @xcel5203
    @xcel5203 5 месяцев назад +2

    Japanese bullet trains are the costliest trains- why wasn't a tender floated in the first case ? The travel costs too will be high ; ordinary people will find it difficult to afford it . The trains operating in other sectors going to the north and east are overcrowded, in terrible shape and in dirty condition . Why aren't these trains improved ? Ahmedabad and Mumbai are connected by plenty of buses, trains and flights ; there is absolutely no necessity of a bullet train on this sector except for local prestige . Indian railways safety record is abysmal ; instead of investing in vanity projects they should first invest in latest safety equipment.

    • @henrystevens3993
      @henrystevens3993 5 месяцев назад +19

      Which ordinary people will find difficult to travel and expensive?? Here the flight cost between AHD and Mumbai is 5k, if a train is running in 4k and reaching faster automatically people will opt for bullet train. Plus both the cities and the states are high income. So your claims are baseless. And yes Japanese trains are expensive but they are also transferring most of the technologies unlike cheaper Chinese counterparts. So it's mostly one time expense. Again your claims are baseless

    • @xcel5203
      @xcel5203 5 месяцев назад +2

      @@henrystevens3993 Henry boy , Japan doesn't transfer shinkansen technology; it's protected and the manufacturing is in Japan itself . As for the journey plane will take ½ the time the train will take . Vande Bharat is not the success that the railways said ; they are not running faster than 90 kmph . Who exactly is baseless?

    • @cannibalronny7314
      @cannibalronny7314 4 месяца назад

      What is the need for buying a car then u should travel in a bus with u r family,it is a future economic corridor joker,we are building infrastructure which leads to growth,infrastructure is created around services,learn some basic economic lessons chhapri

    • @strawhat9319
      @strawhat9319 4 месяца назад +1

      Because they provided 80000 cr soft loan.

    • @mriya4345
      @mriya4345 4 месяца назад

      ​@@xcel5203there's a transfer of technology agreement for the rolling stock

  • @jarrodyuki7081
    @jarrodyuki7081 4 месяца назад

    1. trash duty 2. laundry 3. floors and 4. the circuit breaker!!!!!!!!!!!wd 40 lightbulbs and smoke detector!!!!!!!!!!!!!!

  • @jarrodyuki7081
    @jarrodyuki7081 4 месяца назад

    1. one child policy 2. one party state 3. asian development model and 4. the keiretsu system!!!!!!!!!!!!1

  • @jarrodyuki7081
    @jarrodyuki7081 4 месяца назад +1

    1. trash duty 2. laundry 3. floors and 4. the circuit breaker!!!!!!!!!!!wd 40 lightbulbs and smoke detector!!!!!!!!!!!!!!