Basement Tanking before slab for elevator shaft base
HTML-код
- Опубликовано: 6 янв 2022
- Negative membrane was installed onto a slate earth surface before a concrete slab was poured for the base of and elevator.
With plug & negative membrane combined with rising damp solutions we were able to stop the water leaking from the stone before the builder laid concrete over the waterproofing solution.
www.risingdamp.sydney
www.concreteslablifting.com.au