Basement Tanking before slab for elevator shaft base

Поделиться
HTML-код
  • Опубликовано: 6 янв 2022
  • Negative membrane was installed onto a slate earth surface before a concrete slab was poured for the base of and elevator.
    With plug & negative membrane combined with rising damp solutions we were able to stop the water leaking from the stone before the builder laid concrete over the waterproofing solution.
    www.risingdamp.sydney
    www.concreteslablifting.com.au

Комментарии •