TIME FOR A CHANGE PART FOUR | CONCRETE WORK | PIG PEN

Поделиться
HTML-код
  • Опубликовано: 16 ноя 2024

Комментарии • 12

  • @wendingourway
    @wendingourway Год назад

    Pups are sure having a great time! The humidity has been horrible here in Nova Scotia...100% and feel-like temperatures reaching almost 40c...just a little on the warm and sultry side. Take care. Bruce and Otis

  • @geargriden19
    @geargriden19 Год назад

    Nice on the concrete work that'll help keep them from lifting the fence!!
    *Have a good'nnn*

  • @SimplyJanHomestead
    @SimplyJanHomestead Год назад

    That’s looking good Tony! Try to stay cool and hydrated.

  • @bryansloesshillshomestead4523
    @bryansloesshillshomestead4523 Год назад +1

    Should have tried the dry pour method on the slab. I've seen videos of RUclips. Just curious if it is as good as they claim. They put the mix in the forms dry and then dampen it and let it cure slowly.

  • @YogiHollowFarm
    @YogiHollowFarm Год назад

    Concrete pad looks great! Love you’re doing a concrete floor for them. Tony the concrete on the panel is great! Hoping to do ours in the fall to keep my rotten stinker where he belongs. We have the hot wire on and Ryan’s had a lot on his plate taking care of me being sick. So thankfully now I am better I can do this

  • @pichess23
    @pichess23 Год назад

    Very good ❤❤❤❤❤