Installing Data Cabinet, Switches, NVR, Crimping CAT6 and Cable Management
HTML-код
- Опубликовано: 4 окт 2024
- The process on how I install data cabinet with cable management, installing unmanaged switch, nvr and crimping cat6.
Please like and subscribed!!
Great job with the power supply cord behind the rack... Pro work.
Very clean. I would gave used shorter jumper cables but you made it look clean with the wire manager. I have the same NVR, lol
Brilliant! Color coded so you can easily know what cable goes where. Plus in case of failure easy to trace.
Buen trabajo, felicitaciones Roberto. un saludo fraterno desde Perú.
verry good
Watching all the way from Dubai po
Neat, well done!
Ang hirap pala ng ginagawa mo napaka mabusisi.. Great job po.
Nice one
I know it is an old video. But what about the cables still coiled up on the floor? Also punched between cabinet and wall. Best mounting is into studs not dry
wall anchors.
The rack is mounted to a cement wall, channel is from Philippines, but it seems they (or at least that specific building) is european style and not american- cement/cinder blocks on inside walls instead of studs and drywall, those plugs will likely have a good chance at holding the cabinet with him sitting on top, not sure with the way he drilled though...
Dami nmn sir buhol buhol na hehehe ingat po
One thing I would of done was to put some fire retardant spray foam on that big opening, you’ll probably get excessive heat from the wall opening and dust and probably bugs if any ..
Perfect
Amazing Roberto, pls list the hardware and parts used if you can.
Data cabinet, patch cord, patch panel, cable organizer, PDU, tray
👍
Donc chez vous on fixe la baie de brassage presque au sol ? c'est pratique pour dépanner ?
Its 9.999 to the power of 2 is usually IT that makes the messes like this
Can't say as I've ever built a network but A)Why not just use shorter patch cords and skip the need for cable management. Put the switch right under the patch panel and use 2-3 inch patch cord. B)Are patch cords packaged only individually? Frustrating and wasteful. I would have thought they'd be sold in packages of 1, 8, 16, 24
the patch cords are supplied by the company. i can only work on what available materials.
@@robertobasic101 That must irk somewhat. You probably want the right tools for the right job. Not acceptable tools for the right job.
I agree. Looks good in the glass but everything else looks terrible. Cable not dressed. all patch cords just shoved over the switch.
For flexibility and scalability in many ways.
Its goog teaching
well done
Crikey!
What is the brand and model number of the data cabinet you used? Did you purchase it from Amazon?
Local produce and local distributor only. 9u 45cm x 65cm.
Nice video - what size is this cabinet? Is it 9U?
Yes, it is!
What is the purpose of the device on your chin?
Аre you an electrician?
Why these spaces?
It is necessary to place the equipment tightly.
Thus, one month will be enough for a device with uninterrupted power supply.
The cable must be laid in "pigtails"...
Colored patch cords will not help when the work is done poorly. Of course, in the case when the customer knows how this work should look.
Hi 😊
hello
need more practice for clean cable management
Cable management? 😂😂😂 be serious
👍