Trains in Brisbane with track closure disruptions
HTML-код
- Опубликовано: 4 фев 2025
- In this video we see Beenleigh line trains using platform 3 at Roma Street along with generic trains around the SEQ Translink and some extra 6 car trains on the Rosewood line.
They should upgrade the rosewood line with 6 car stations
@@seantrainandstormvids maybe, idk even in peak it never seems that busy, nothing that can’t be fixed with just running more frequently, but if we keep purchasing fixed 6 cars we’ll have to eventually
I fort the rosewood line was 6 car
@@hestercole-r8t 6 car trains will run on it, when needed but no, after Ipswich it’s 3 cars for passengers