ASTM C78 - Flexural Strength

Поделиться
HTML-код
  • Опубликовано: 22 окт 2024

Комментарии • 17

  • @suhaibahmed3972
    @suhaibahmed3972 3 года назад +2

    Thank you so much

  • @gabriellastadler7721
    @gabriellastadler7721 2 года назад +1

    How long should the specimen be in the mold before removing it and curing it?

    • @cttparkansas4219
      @cttparkansas4219  2 года назад +1

      The specs loosely say up to 48 hours. As a general rule when kept properly between temperatures of 60 to 80 degrees while curing, it is generally safe to strip concrete cylinders and beams the next day, though if its kept in cold temperatures you may want to use up to that full 48 hours to make sure they aren't "green", which is a term to mean it hasn't fully hardened yet.

  • @jesusglopez8430
    @jesusglopez8430 Год назад

    Thanks for sharing.

  • @surkhabalam7684
    @surkhabalam7684 Год назад

    Nice video

  • @hassanamjad5323
    @hassanamjad5323 Год назад

    Whats the length of the beam

  • @sitinuraisyahjemat9898
    @sitinuraisyahjemat9898 11 месяцев назад

    What are the speed testing

  • @carlosalcidestupayachimarm5840
    @carlosalcidestupayachimarm5840 2 года назад

    Very helpfull!

  • @jetson3851
    @jetson3851 2 года назад

    Is ultimate load the maximum load or is it the load at constant rate?

    • @cttparkansas4219
      @cttparkansas4219  2 года назад

      Yes you can think of ultimate load as the maximum load. The loading rate has to be between 125 and 175 psi/min (or that would convert to 1,500 to 2,100 lb/min....which would further convert to 25 to 35 lb/sec depending on how your compression machine reads)

  • @dinkykohli4885
    @dinkykohli4885 3 года назад

    Sir how many support nblocks we r using

    • @cttparkansas4219
      @cttparkansas4219  2 года назад

      This type of setup has 2 support blocks (that the beam is resting on) and 2 loading blocks (applying the flex load)

  • @notachannel3104
    @notachannel3104 3 года назад

    how do we know 3%-6% of estimated maximum load?

    • @Sierrablue03
      @Sierrablue03 2 года назад

      Read the spec of the job

    • @cttparkansas4219
      @cttparkansas4219  2 года назад +2

      That depends on what we anticipate the maximum load to be. The whole idea of the 3-6% is to just put enough of the load for the loading/support blocks to be fully in contact with the beam, thus being able to check for gaps using the feeler gauge. As a loose ballpark, typical beams may have a maximum load of between 6,000 to 12,000 (much smaller as compared to cylinders). 3% of 8,000 would be 240. 6% would be 480. So as an approximation, we could say between 200-500 load (which is extremely small) can be applied, but again it depends on what the expected maximum load is.