Drilling, tiling, lots of progress at the ABANDONED apartment ep21
HTML-код
- Опубликовано: 28 июн 2024
- It's been a busy week here; the bathroom has two tiled walls, the bedroom is partly-painted and the gas engineer has started the boiler installation.
That plastering wasn't the best....lol. Not your finest hour, I have to say. Your work is normally to a high standard but I guess one can't be great at everything!Nothing a few sheets of 80-grit sandpaper won't sort out.