Who are the contractors. South Africa is in trouble, roads don't last when tar road is put and now a 5 storey building going down and Soo much sand in the rubble 😢😢😢. How was this building going to accommodate families😢😢😢
It appears that the concrete pillars might not of been 100% dry this does make sense but its still speculation we will only know the truth after a full investigation congrats to all the rescue teams they are true professionals
No, it does not make sense. There were already slabs on top of the pillars which were already cured. So the pillars were up for more than 56 days as the concrete reaches its design strength after about 28 days. Footage indicate that the bottom pillars failed first, so they were of insufficient strength.
May our Lord grant mercy to the families of this disaster, its painful.
The amount of sand visible in what is supposed to be concrete.…eish no man.
What a terrible disaster our prayers are with them all.
We praying 🙏🏼 for Everyone 🙏🏼
Who are the contractors. South Africa is in trouble, roads don't last when tar road is put and now a 5 storey building going down and Soo much sand in the rubble 😢😢😢. How was this building going to accommodate families😢😢😢
I live in George quite close to the accident, and it was devestating.
We are all making donations and helping
Absolutel silence. ...and we still have NO idea who the contractors are.. 🤷♀️
Neatrend
Awu yini nkosi imndeni engaka asithandazeni kaze senzeni baba😳😭😭😭😭😭😱😱yohh Thixo yini.
It appears that the concrete pillars might not of been 100% dry this does make sense but its still speculation we will only know the truth after a full investigation congrats to all the rescue teams they are true professionals
No, it does not make sense. There were already slabs on top of the pillars which were already cured. So the pillars were up for more than 56 days as the concrete reaches its design strength after about 28 days. Footage indicate that the bottom pillars failed first, so they were of insufficient strength.
@@jacobusjonck2172 could it of been substandard concrete mix then
@@ChrisJackson-c3i cannot really say without having the concrete mix designs, qualiity control sheets and the pillar design and specifications.
Cc fix your glasses. Ziya disturb(a)
And yet you are talking
Dogs????
Exactly what im asking myself, the men power is small and they moving slow
Prayers go out to all involved 🙏🏿
My Malawian people 😢😢😢
Praying for you during this difficult time