Fire Fighting Pipe Pressure Test| Fire Fighting System| Fire Fighting Pipe Work| By MEP TECH TIPS

Поделиться
HTML-код
  • Опубликовано: 23 окт 2024

Комментарии • 23

  • @shahemsawaf
    @shahemsawaf 9 месяцев назад

    Good Jobs

  • @Krishna-pd9pg
    @Krishna-pd9pg 3 года назад +1

    Very professional way. I have installed a small fire pipeline system in my building of 2 floors, riser pipe. I want to check the pressure test in the pipelines before false ceiling. Can I pressure test with a hand operated pump ?

  • @tambutso141
    @tambutso141 3 года назад +1

    In the philippines, For initial/internal testing you must test the system with required pressure for 24 hours duration.And if no pressure drop after 24 hours thats the time you call for the inspector to witness and observe another 2 hours. Sometimes the allowable pressure drop is +-2 psi with no visible leaks.

  • @meramaan8999
    @meramaan8999 2 года назад +1

    How much pressure drop is acceptable in 24 hours

  • @sruthijeril8026
    @sruthijeril8026 4 года назад

    Brother ..good work and thanks
    Can you make videos on folloqing topics
    1) parts fire diesel pump
    2) fire pump controller inside parts and its fun tion
    3) how to do servixing of fire pump?

    • @MEPTECHTIPS
      @MEPTECHTIPS  4 года назад

      Yes brother of course will do

  • @asmabasith1614
    @asmabasith1614 4 года назад

    Sir ji i mean it's also known as a ITC?

  • @asmabasith1614
    @asmabasith1614 4 года назад

    What is the purpose of ITC brother can you please explain me

  • @rizwanlarzi5692
    @rizwanlarzi5692 4 года назад +1

    how much pressure should we maintain in main pipe and sprinkler pipe

    • @MEPTECHTIPS
      @MEPTECHTIPS  4 года назад

      As per ur project system pressure will be maintained

    • @viranationscrg8196
      @viranationscrg8196 3 года назад

      For example a ground floor fire fight system what is the ideal pressure..?

  • @psstriker
    @psstriker 2 года назад

    Pressure testing pump price

  • @mohammedmakeen9132
    @mohammedmakeen9132 5 лет назад

    Please upload how to perform hydro test for wet and dry riser thank you

    • @MEPTECHTIPS
      @MEPTECHTIPS  5 лет назад +2

      Yes my brother I will do it is inline all the activities in shaa Allah my plan to make till T & C

  • @tambutso141
    @tambutso141 3 года назад

    The valve must be closed before removing the end plug thats the proper practice. Considering the pipe system is pressurized .What you are doing is not safe.

  • @isaiahodanga2853
    @isaiahodanga2853 8 месяцев назад

    Thanks for the video but this plug might kill someone.

  • @goodman2019
    @goodman2019 5 лет назад

    Good video bro i wish make more video about the mep site because all of lecture on youtube just about design

  • @syedhisham450
    @syedhisham450 4 года назад

    The procedure to loosen the GI End cap that way in the end... you say it will fire like a bullet - Yes we know.... but It is not required to do like that in the end brother.

    • @MEPTECHTIPS
      @MEPTECHTIPS  4 года назад

      Some people does not know about pressure, just to show them the idea. U may be experience person u have that idea but unknown will get educated from this video

  • @baeisaworld141
    @baeisaworld141 3 года назад +1

    Be careful at this point .. yet , he is using bare hand 😂😂

  • @vinayakjoshi1969
    @vinayakjoshi1969 4 года назад

    I didn't see any pressure testing.pl show the actual HPT INSTED SHOWING OTHER THINGS

  • @naveeedd
    @naveeedd 5 лет назад

    Why do you repeatedly tell the same thing again and again in the same video?