What an over reaction when TMR are involved. That section is far from the road surface with no risk under normal weather of causing danger. It could have been avoided by simply and cheaply digging more of the hill with wider gradient as any old school mining engineer would tell you. ,,, and base the design likely on computer models. How long will the lane on Cunningham gap be closed 10 years and counting
Thats what happens when you dont tie it to the wall 😂
We will be patient & hopefully you repay with frèe tolls for a year 🤷♂️
Who did this part of the highway interesting
X Leighton workers😮
The trucking industry is over the bloody moon, they don’t have to pay the exorbitant tolls to use the road
What an over reaction when TMR are involved. That section is far from the road surface with no risk under normal weather of causing danger. It could have been avoided by simply and cheaply digging more of the hill with wider gradient as any old school mining engineer would tell you. ,,, and base the design likely on computer models. How long will the lane on Cunningham gap be closed 10 years and counting
Googleearth shows the earth cracks and signs of sliding even before the road surface is sealed .
Does this mean tolls will be increased
Could small explosives be use to bring unsettled earth down to safe work area ?
It could, also could and probabaly would bring down more material.
M berrys
Crumbling infrastructure. Slow and expensive repairs.