28 minutes of nothing Just pain watching this operator🤦🏻♂️ I think they do this slowly to kill the day and go home withouth finish the job I was the owner of that factory and I would have already fired that operator
bloody painful alright......if i was doing that, id be done and dusted in 30 mins for that whole side....good size digger like that can easily do it....
@Couchtripper That's why these machines have a counterweight at the back. He's just gaining reach to push material down. It would be very different if he was trying to lift heavy material up, then I could see your point. How do you know if they tried this? Maybe they haven't tried it and the internet has many people with ideas that might help. I sure didn't say I was more cleaver, I have more respect for people than that.
All these comments from 'experts that don't realise the operator may not be able to see what he is doing. Look at the height of the hopper wall above the excavator tracks.
I'm a quarry excavator operator and I always read these comments on machinery operations and there are more experts then there are machines in the world lol and as the saying goes opinions are like arseholes everyone's got one
Instead of bucket touching strait to the hopper wall, you should install a scrapper plate to the bucket with springs between bucket and the scapper plate. This way the hopper wall will not be damaged because the springs will work as buffer .
I have often wondered why they didn't clean the hopper when it gets built up. Just from my perspective it seems they get more boulders hanging up when the hopper is not "clean". But they could use a "true" long arm excavator. Just an opinion.
I noticed how gleamingly clean the windows are on the Excavator. The operator did not appear particularly intuitive using the Machine, but he’ll improve. Everybody does. That Volvo is a lovely machine to be learning on, if he is?
i'm no machine operator, but wouldn't a flat blade work better? used to use a "rake" type tool, but with a solid blade, for moving grain around (by hand). was much easier and more efficient than a shovel or similar. worth a try maybe?
Perfect you created a shelf for the new material to get stuck on !! You need a long reach machine and a better operator to remove all the material to the edge of the crusher !!
If you ever see a video on RUclips with an excavator in it, you can be assured the comments will be filled with people calling the operator terrible at his job. Looks like he’s doing it just fine to me.
The company should invest in a camera, so the operator can see where his bucket is, to prevent going too deep. The operator was very smooth on the controls.
@@TECHNICALINFOMINING especially considering the operator could not see where the bucket was. Have you thought of turning the excavator so the tracks are parallel to the hopper. It will give a little bit more reach. Counterbalance
Pretty confident I could fly to where this site is (Pakistan?) drive from the airport to a hotel, find and rent an excavator, have it delivered on site, teach myself how to use it and proceed to clean out the hopper before this guy would finish.
I can never understand why they don’t get an excavator with a longer arm on it. I thought it would make it easier for them near the bottom and would save putting the guts at risk. I’m watching this shouting dig it dig it don’t push dig 😱
Thanks for the like and the❤️. I grew up cleaning agricultural feed n seed hoppers and they were always a challenge and I would find easier ways to clean. Yeah I know farm equipment is nothing like iron ore hoppers but I look at things differently. I would love to see an excavator sideways doing clean out n compare straight on clean out. I think that would make an awesome video. P.S. I love ❤️ watching your content!
how about lining the chute with a thick metal plate mounted on springs with vibrators attached to avoid all this careful slow maneuvering you praise this operator for silk touching tiles that gets huge boulders dropped on them every day all time spent not processing ore is profit-consuming
You would think since they have to do this all the time they would have an excavator with a taller cab and a true long reach arm with a rubbery blade to push that packed dust down the hopper.
He must get paid by the hour 😂😂, he would see better if he had his tracks parallel with the edge of the hopper, it's relatively loose dirt so he won't topple in
There may be another reason for allowing the buildup - it stops the boulders and rocks from directly hitting and causing wear on the lining of the actual hopper. So a certain amount of buildup may be tolerable but not to the extent here
@@grumpyg9350 a competent operator would of done this in less than half the time than this operator did this ! Even turning his machine in the yard was a hash job too....
To be fair to the operator he was doing this mostly by feel.. If you notice he cannot see much down at the crusher end. If he speeds up he may damage the tiles..
Just wondering instead of using the excavator if you just take the boom and mount it on a track above the hopper with not sure if correct term. But the claw the use to pick up trees. It's flat so you won't damage the plates as you slide the paydirt off the sides. Pluss added effect if you get a bolder jam you can just grab it with the claw and slide it in to the crusher
there is a crane track or something above this that holds the big question mark looking thing for moving stuck boulders, some sort of flat attachment for that would work better than this
Put a machine that vibrates it and not only will it keep it clean using "liquifaction", but it will also speed up the process of crushing stone down the "hopper" by "motivating" the smaller rocks/particles.. If you used a bass speaker to produce the vibrations then just like the Egyptians described you will be using sound to move stone...
There should be large chains hanging down the hopper sides that can be moved side to side once a day to keep that hopper clean. That crane can be used to lift them up no more than 3 links to break the hard pan loose. Also either leave the water on continually to wash the hopper clean or leave it off so as not to make mud. To many people standing around doing nothing, Start getting that machinery cleaned up, or get fired.
You need long arm to reach down to clear it. You guys need to keep. Clean up instead on ignore to build up the dirty and difficulty to run down the dump to crunch hole
that is a lot of buildup. was this partially due to 1 or more rainstorms that increased humidity and promoted this fine material to stick together (or wet ore being dumped in from outside) ?
1 thatsnota long reach excavator ,... 2 turn up the bloody revs ,... 3 OMG how so bloody painful to watch this guy operate ,... it's like it's his first week on the machine or he's scared cause he's being watched by some big wiggs???I don't know !!!!!
That's not a long stick trackhoe I doubt that operator could operate a long stick Regular stick is more than he can handle. Probably the best operator in the pit
Not much of an operator, or much of an operation. Trucks are running 3/4 loaded, look around the pit. It's a mess, sloppy site, light loads, must be a shit site to work at, nobody gives a damn.
This is a stone crusher not a dirt crusher, the loads should be screened before it goes in the crusher, more than half of the load shouldn't be going in there just the stones, waste of time.
Huh? It's an iron ore mine. All material is pay. Makes zero sense to screen anything because they want it as fine as possible. The more fines, the better.
Are these scheduled clean ups or on an as needed job?? How often do to have to replace wear plates on the chutes?? I'm not a RUclips expert, like others here, but the operator shows real experience in knowing how deep to dig without damaging his equipment or the chutes themselves. Thanks
They replace wear pads basically when they’re stuffed. Periodic inspections weekly will determine when they’re replaced. No set time frame. They way I’ll sleep a process plant going for as long as possible before a shutdown
They should pay out bonuses suggestions for improvement . Time is money but probably not for you. Sie sollten für Verbesserungsvorschläge Prämien auszahlen . Zeit ist Geld aber wohl nicht bei euch .
can you make a new video went you will clean up the wall another time on this one the work is not finish and i went know if you can take off all the stuff really
By turning it sideways he could tip it over when going for the long reach. And there's nothing he can lay his bucket on when it's tipping. Great example of what not to do.
Kinda pointless unless they need to work on the sheeting.......otherwise it is just going to build up again Having the dirt there acts as a cushion so the big boulders don't bash against the metal......i would leave the dirt there if it doesn't need to be cleaned
It might be a easier to do the job if the bucket on the excavator was flipped around to point away from the machine. Not sure how easy that is to set up without a quick connector on that machine in the field though. Thank you for the videos.
The operator is clearing by feel not sight. He can't see down over the edge, it takes a slow methodical approach to not damage the tile wall. These so called RUclips pros would go as fast as they could and smash the shit out of the tiles. Then the same RUclips pros would call him a noob and a twat for going too fast..
Wrong machine for the job they should invest in a longreach whit a tiltrotator and a bucket whitout teeths on it then they could remove that dumb hook thingy for clearing rock jams and just get s hammer for the long reach
Good operator: "Don't move dirt twice."
Bad operator: "I'm gonna lift all this dirt up then drop it down where I found it."
It's painful watching this machine operator !!!
Absolutly, it looks like this guy don't even know how the excavator even works! Sooooooo slowwwww!😴🙄
It's the same operator that drives the hook!
@@stujd1539 L0L
LetsDig 18 would have it done quick and look for more work in the time it took this guy to do it
I could have done it quicker by hand
28 minutes of nothing
Just pain watching this operator🤦🏻♂️
I think they do this slowly to kill the day and go home withouth finish the job
I was the owner of that factory and I would have already fired that operator
Someone got disappointed huh
If hes gettin paid by the hour id be taking my time
bloody painful alright......if i was doing that, id be done and dusted in 30 mins for that whole side....good size digger like that can easily do it....
@@hardtop123 yeah right you probably never even operated one that big.
@@jebsvjxbdxb1128 yeah i have actually.....along with a few other sizes
Is this Video in slowmo?
I sped it all the way up 1.5x
That is not what I would call "long reach."
he only cyn clean up the upper section..so the whole thing doesnt make sense :-)
And he isn't making a good job of that either. Waste of space. Where the hell do they find these idiots.
Don't bring it back up with an empty bucket! Make your moves count.
I had no idea there was so many expert excavator operators on RUclips.
cant be doing medicine, law and astrophysics all day. the experts need a hobby too.
then watch Mr. Works and Mr. Machine too, then you won't watch that shit anymore
just use common sense
that's about what he is doing!
🙄🙄
If the excavator tracks were 90 degrees ,so sideways he would be closer. He would be able to see better and have a bit more reach.
Exact thought I had. Most of his problem, other than being obviously new to the equipment, was that he really couldn't see what he was doing.
@Couchtripper That's why these machines have a counterweight at the back. He's just gaining reach to push material down. It would be very different if he was trying to lift heavy material up, then I could see your point. How do you know if they tried this? Maybe they haven't tried it and the internet has many people with ideas that might help. I sure didn't say I was more cleaver, I have more respect for people than that.
@Couchtripperjust by watching what’s happening right now !
Let’s dig 18 would have been the better operator
All these comments from 'experts that don't realise the operator may not be able to see what he is doing. Look at the height of the hopper wall above the excavator tracks.
Exactly!
I'm a quarry excavator operator and I always read these comments on machinery operations and there are more experts then there are machines in the world lol and as the saying goes opinions are like arseholes everyone's got one
Instead of bucket touching strait to the hopper wall, you should install a scrapper plate to the bucket with springs between bucket and the scapper plate.
This way the hopper wall will not be damaged because the springs will work as buffer .
Welcome to all you for yours opinion.
But slow operation of excavator is used to resist or decrease from damaging of hopper liner plate.
That is good idea man
Its all hardfaced , it would wreck the bucket before it wrecks the chute.
We
You guys needs to maintenance than ignored it build up soils . Do once a monthly to cleaning . Oh come on Brandon !!!!
Would some sort of vibrating wall be better solution turn it on once a day to vibrate all that clean?
I have often wondered why they didn't clean the hopper when it gets built up. Just from my perspective it seems they get more boulders hanging up when the hopper is not "clean". But they could use a "true" long arm excavator. Just an opinion.
Ok I will try
weld a strip onto teeth so he dont have to worry about snagging a plate would have gone much easier my opinion
Welcome to all you for yours opinion.
But slow operation of excavator is used to resist or decrease from damaging of hopper liner plate.
I noticed how gleamingly clean the windows are on the Excavator. The operator did not appear particularly intuitive using the Machine, but he’ll improve. Everybody does. That Volvo is a lovely machine to be learning on, if he is?
Very competent operator but I can't understand why he didn't draw the bucket towards the machine after pushing from the top. Just a thought.
Welcome to all you for yours opinion.
But slow operation of excavator is used to resist or decrease from damaging of hopper liner plate.
i'm no machine operator, but wouldn't a flat blade work better? used to use a "rake" type tool, but with a solid blade, for moving grain around (by hand). was much easier and more efficient than a shovel or similar. worth a try maybe?
got to piss with tackle you got. they are in a mine so they use toothed buckets, not much need for a grading bucket there
A grading bucket on a long reach. Probably not practical.
Perfect you created a shelf for the new material to get stuck on !! You need a long reach machine and a better operator to remove all the material to the edge of the crusher !!
How well this high-performance excavator in action, produced by the famous Volvo company, is filmed!
I think " Hopper cleaned" is saying a bit much😅
If you ever see a video on RUclips with an excavator in it, you can be assured the comments will be filled with people calling the operator terrible at his job. Looks like he’s doing it just fine to me.
The alternative is that the guy who is just doing his job is so awesomely skilled they could crack an egg with a 100-tonne excavator!
Right?? IMO or priority on not to break anything. I think he did great considering a wall in front of him doing it half blind,, did a lot by touch
Would be more efficient to use the bucket to just push the material into the shute....
That's not fast. Scrapping inches when he has feet to go.
The company should invest in a camera, so the operator can see where his bucket is, to prevent going too deep. The operator was very smooth on the controls.
If you don't know how to operate heavy equipment you should leave it to the real operator's!!!!!!!!!!!!!!!!!!!!!!!!😎😎😎😎
I’ve seen glacier’s move faster than that!
love it...................🤣🤣🤣🤣🤣🤣🤣🤣🤣🤣
Not sure what you class as fast cleaning, I nearly died of old age watching the “not so long “ excavator drag that job out! 😬
Would have likely been quicker to get a smooth bucket and mount it backwards so you can push and scoop downwards rather than pulling up and dropping
I have an excavator. That took a lot of patience from the operator not to break the tiles.
Welcome to all you for yours opinion.
But slow operation of excavator is used to resist or decrease from damaging of hopper liner plate.
@@TECHNICALINFOMINING especially considering the operator could not see where the bucket was. Have you thought of turning the excavator so the tracks are parallel to the hopper. It will give a little bit more reach. Counterbalance
Same dope that operates the hook by the looks of things. Must be the boss' son.
Need a longer arm excavator with wide flat bucket so the teeth will not damage the wall tiles
Pretty confident I could fly to where this site is (Pakistan?) drive from the airport to a hotel, find and rent an excavator, have it delivered on site, teach myself how to use it and proceed to clean out the hopper before this guy would finish.
Оператор не пойми какой работает как перый раз за пультом😂
Seems to me they go the hard way to do this job
I can never understand why they don’t get an excavator with a longer arm on it. I thought it would make it easier for them near the bottom and would save putting the guts at risk. I’m watching this shouting dig it dig it don’t push dig 😱
How come you don't turn excavator sideway in the opening so you can actually reach the opening with extreme ease? Helllloooo McFly!
Thanks for the like and the❤️. I grew up cleaning agricultural feed n seed hoppers and they were always a challenge and I would find easier ways to clean. Yeah I know farm equipment is nothing like iron ore hoppers but I look at things differently. I would love to see an excavator sideways doing clean out n compare straight on clean out. I think that would make an awesome video. P.S. I love ❤️ watching your content!
very few Operators seems to know what they are doing
how about lining the chute with a thick metal plate mounted on springs with vibrators attached
to avoid all this careful slow maneuvering you praise this operator for
silk touching tiles that gets huge boulders dropped on them every day
all time spent not processing ore is profit-consuming
何故?
オペレーターは、仕事の場所を見なぃのですか??
素晴らしい工場なのに!
責任者が、😅指導し無いの😂
Everyone else enjoying coffee break while he cleaning the hopper.. lol
All that excess material, nice
You would think since they have to do this all the time they would have an excavator with a taller cab and a true long reach arm with a rubbery blade to push that packed dust down the hopper.
He must get paid by the hour 😂😂, he would see better if he had his tracks parallel with the edge of the hopper, it's relatively loose dirt so he won't topple in
It actually says ‘FAST’ in the title😂😂😂😂
Обычно я хорошо засыпаю на этих видео. Всё так так медленно. И крюк медленный, и экскаватор медленный.
It would be a lot easier if they didn’t have the claws on the end of the bucket.
if this is fast cleaning, i wonder how slow cleaning looks like
There may be another reason for allowing the buildup - it stops the boulders and rocks from directly hitting and causing wear on the lining of the actual hopper. So a certain amount of buildup may be tolerable but not to the extent here
Relax man he's just giving his thoughts on the matter
@@YourName-jm7lz lmao you got some problems at home? people are allowed to state their thoughts and ideas.
Your girlfriend look like my mom
What about the lego hook 😎
This build up would be prevented if they didn't use the misting spray. Job security i guess
either that or use heaps more water. Wash the hopper down when build up starts.
OMG, was this a training day for an newbie excavator operator?
So painful to watch this total hash job.
i agree was like it was in slow motion
Ok
I think operator did a great job. Tear the tiles off, and you get fired or lose pay.
@@grumpyg9350 a competent operator would of done this in less than half the time than this operator did this !
Even turning his machine in the yard was a hash job too....
To be fair to the operator he was doing this mostly by feel..
If you notice he cannot see much down at the crusher end.
If he speeds up he may damage the tiles..
Just wondering instead of using the excavator if you just take the boom and mount it on a track above the hopper with not sure if correct term. But the claw the use to pick up trees. It's flat so you won't damage the plates as you slide the paydirt off the sides. Pluss added effect if you get a bolder jam you can just grab it with the claw and slide it in to the crusher
there is a crane track or something above this that holds the big question mark looking thing for moving stuck boulders, some sort of flat attachment for that would work better than this
@@superdonster77 yeah that's why i was thinking something that could also grab if by chance the boulder was to big then up out broke then back in
Put a machine that vibrates it and not only will it keep it clean using "liquifaction", but it will also speed up the process of crushing stone down the "hopper" by "motivating" the smaller rocks/particles..
If you used a bass speaker to produce the vibrations then just like the Egyptians described you will be using sound to move stone...
Must be the operators first day
There should be large chains hanging down the hopper sides that can be moved side to side once a day to keep that hopper clean.
That crane can be used to lift them up no more than 3 links to break the hard pan loose.
Also either leave the water on continually to wash the hopper clean or leave it off so as not to make mud.
To many people standing around doing nothing, Start getting that machinery cleaned up, or get fired.
You need long arm to reach down to clear it. You guys need to keep. Clean up instead on ignore to build up the dirty and difficulty to run down the dump to crunch hole
Looks like a standard excavator not an extended stick out anything
that is a lot of buildup. was this partially due to 1 or more rainstorms that increased humidity and promoted this fine material to stick together (or wet ore being dumped in from outside) ?
Wow long over due...id say...lotta durt to shift...Great video..
Welcome to all you for yours opinion.
But slow operation of excavator is used to resist or decrease from damaging of hopper liner plate.
He's treating the chamber like it's made of glass... they routinely drop boulders weighing a few HUNDRED pounds to a ton or more in that thing!
OH YEA AND Little RICKY has a small……well we all know…..😆😆😆😆😆😆😆
того оператора,который включает воду при разгрузке машин - с лопатой туда загнать! потом пусть подумает,стоит ли оно того!
The title says fast cleaning, there is nothing fast about what this operator is doing. must be first time sat in the seat.
at this rate it'll be out of production for an inordinate amount of time - 'dig-in Bro and get it moving - pronto!
Вот нет бы экскаватору боком встать и стрела длинше и есди туда сюда чуть чуть
Surely this was a job for Captain Hook?
That operator did a fine job.👍👍👍👍👏🏻👏🏻👏🏻👏🏻
U 4real my 3year old wud do a better job
Welcome to all you for yours opinion.
But slow operation of excavator is used to resist or decrease from damaging of hopper liner plate.
Gosh that was PAINFUL to watch!!! Operator has no clue
Welcome to all you for yours opinion.
But slow operation of excavator is used to resist or decrease from damaging of hopper liner plate.
1 thatsnota long reach excavator ,...
2 turn up the bloody revs ,...
3 OMG how so bloody painful to watch this guy operate ,... it's like it's his first week on the machine or he's scared cause he's being watched by some big wiggs???I don't know !!!!!
That bucket is not a good tool for that. A large flat plate secured to the arm would do a much better job.
That's not a long stick trackhoe I doubt that operator could operate a long stick Regular stick is more than he can handle. Probably the best operator in the pit
Which mines is this ? Location
Not much of an operator, or much of an operation. Trucks are running 3/4 loaded, look around the pit. It's a mess, sloppy site, light loads, must be a shit site to work at, nobody gives a damn.
если экскаватор поставить бортом к завальной яме, он сможет дальше достать ковшом
По моему, этому эксковаторщику, как не ставь, толку не будет. Впечатление такое, что он эксковатор вчера первый раз в жизни увидел.
Painful is an understatement 😂😂😂😂
This is a stone crusher not a dirt crusher, the loads should be screened before it goes in the crusher, more than half of the load shouldn't be going in there just the stones, waste of time.
Huh? It's an iron ore mine. All material is pay. Makes zero sense to screen anything because they want it as fine as possible. The more fines, the better.
Чувак просто страдает хернёй, типо время идёт и бабки капают.
Да, как будто от конкурентов чел. Прям хочется из кабины его вытащить и самому сесть! Смотреть невозможно на это дрочево!
Видос просто классика,как надо работать, чтобы показать как не надо работать! Супер!
It is not easy to dig when you can't see the edge of the bucket, god operator👍
How much do you get paid to stand there and watch?
If I'd operated at this speed I would've been kicked off the site.
Slow is smooth, smooth is fast.
Are these scheduled clean ups or on an as needed job?? How often do to have to replace wear plates on the chutes?? I'm not a RUclips expert, like others here, but the operator shows real experience in knowing how deep to dig without damaging his equipment or the chutes themselves.
Thanks
Welcome to all you for yours opinion.
But slow operation of excavator is used to resist or decrease from damaging of hopper liner plate.
Какие желоба? Оператор не опытный походу или резину тянет, по этому и медленный такой.
They replace wear pads basically when they’re stuffed. Periodic inspections weekly will determine when they’re replaced. No set time frame. They way I’ll sleep a process plant going for as long as possible before a shutdown
They should pay out bonuses suggestions for improvement . Time is money but probably not for you. Sie sollten für Verbesserungsvorschläge Prämien auszahlen . Zeit ist Geld aber wohl nicht bei euch .
can you make a new video went you will clean up the wall another time on this one the work is not finish and i went know if you can take off all the stuff really
И за такую халтуру ему ещё и платят?! Позор!🙄
If he turn the excavator side ways he could gain a few feet of reach,and yes it’s painful watching this. Good training video on what not to do.👍
By turning it sideways he could tip it over when going for the long reach. And there's nothing he can lay his bucket on when it's tipping. Great example of what not to do.
These guys would dig over their drives..
What's the siren for?
Hello?
That excavator doesn’t need a bucket, it needs a huge spatula
All I can think of watching this is the guy from will it blend going Dont Breathe this.
I feel like he is milking it, or is the new guy. lol
I think the excavator operator is doing time pass....he don't want do the job... irritating 🤔🤔
a big job!
Kinda pointless unless they need to work on the sheeting.......otherwise it is just going to build up again
Having the dirt there acts as a cushion so the big boulders don't bash against the metal......i would leave the dirt there if it doesn't need to be cleaned
It might be a easier to do the job if the bucket on the excavator was flipped around to point away from the machine. Not sure how easy that is to set up without a quick connector on that machine in the field though. Thank you for the videos.
with a welder, anything is possible
Get an operator that can drive it well done in 5 minutes
The operator is clearing by feel not sight.
He can't see down over the edge, it takes a slow methodical approach to not damage the tile wall.
These so called RUclips pros would go as fast as they could and smash the shit out of the tiles.
Then the same RUclips pros would call him a noob and a twat for going too fast..
Hi
That fool must get paid by the hour.
Wrong machine for the job they should invest in a longreach whit a tiltrotator and a bucket whitout teeths on it then they could remove that dumb hook thingy for clearing rock jams and just get s hammer for the long reach
When you get pay by the hour lol
I think that if they put a steel plant across the bottom of the shovel weld it to the teeths