Hydro excavation water main

Поделиться
HTML-код
  • Опубликовано: 24 янв 2020
  • Hydro excavation of watermain replacement, Just Three of us trying to Install a 6" tee with Valve into the existing main to connect to a new main on the right we directional bored in earlier in the week. The leaking Lead Line / Corporation was an old blowoff installed from maybe 60 - 80 years ago that was unknown and was dripping when we found it, and once got disturbed by our digging started to let loose. Also a gas main was between the Clay Storm sewer pipe and the watermain hindering us digging recklessly. It was pretty cold, probably 20 degrees out.

Комментарии • 7

  • @justanon956
    @justanon956 3 года назад

    Hell ya brother, what tip you have on that wand

  • @drainmonkeys385
    @drainmonkeys385 2 года назад +5

    Must be union guys. .. I swear I’ve never seen more guys standing around doing nothing that union work

    • @pamike4873
      @pamike4873 2 года назад +2

      They're not working very smart either. I would've had the bucket over the break in the main instead of letting it saturate the side of the hole. Granted the tank would fill a bit quicker, but the vac would be much more efficient and you'd move a heck of a lot more material.

    • @atticinsane1
      @atticinsane1  Год назад +1

      No not union, but the two guys to the left that walked away are union inspectors. It was a crew of 3 going to install the tee, valve and tie into a new main to the right you cannot see.

    • @atticinsane1
      @atticinsane1  Год назад +1

      Very Cold Out out no one wants to get wet yet that early in the day from the over spray, but ya I agree other than that, but the ground here is hard as hell, old river clay with stones in it too btw

    • @shadythereok
      @shadythereok 9 месяцев назад

      @@pamike4873
      What bucket are you referring to?

    • @shadythereok
      @shadythereok 9 месяцев назад

      Looks like the leak is at the saddle for the corp-stop