Riley Hopkins 300 8 color 6 station Manual Press

Поделиться
HTML-код
  • Опубликовано: 23 ноя 2024

Комментарии • 2

  • @idevthings
    @idevthings Месяц назад

    How long did that take to do 1k prints ?

    • @ParsonsDesigns
      @ParsonsDesigns  29 дней назад

      With just us two guys we do about 100 shirt an hour for one color prints like this. Including stacking and organizing this one took us about 13 hours. The most efficient way to do this is with three people, one person setting shirts, one Printing, and one stacking.