Sheringham Level Crossing: Rebuilding a Railway (Part Two - HD)

Поделиться
HTML-код
  • Опубликовано: 8 фев 2025
  • Footage from Saturday 23rd January, during the reconstruction of the Sheringham Level Crossing link.
    Saturday's work involved the fitting of flat bottom rail, a first for the NNR. Rails on the existing headshunt crossover were changed and ballasting of the track took place.
    For more information on the Sheringham Crossing, visit:
    www.nnrailway.c...
    My photos of the work can be found at:
    owensrailwaypho...
    Apologies for the poor sound quality in many places.

Комментарии • 2