Sheringham Level Crossing- A Very Wet Saturday.wmv

Поделиться
HTML-код
  • Опубликовано: 8 фев 2025
  • On a very wet 16th January a strong team of hardy North Norfolk Railway staff and volunteers gathered at Sheringham. Their task was to re-align the track and point work of the old head shunt with that of Network Rail opposite.

Комментарии • 2