Trains at Burpengary, station reopening day

Поделиться
HTML-код
  • Опубликовано: 12 ноя 2024

Комментарии • 48

  • @Enthusiastic-Trainspotter-BNE
    @Enthusiastic-Trainspotter-BNE Месяц назад

    Nice to see my local station of my whole life being featured on your channel, many thanks mate.

    • @thestargateking
      @thestargateking  Месяц назад +1

      @@Enthusiastic-Trainspotter-BNE always nice to see stations be rebuilt, looking forward to seeing the finished product at stations like Morningside and Bundamba

    • @Enthusiastic-Trainspotter-BNE
      @Enthusiastic-Trainspotter-BNE Месяц назад

      it is@@thestargatekingbut there still are others that should be upgraded

    • @thestargateking
      @thestargateking  Месяц назад

      @@Enthusiastic-Trainspotter-BNE yeah there’s a few that are being worked on still right now with more coming like Albion

    • @Enthusiastic-Trainspotter-BNE
      @Enthusiastic-Trainspotter-BNE Месяц назад

      that might be the case, but that was basically ten years ago or so from what i already have seen on the internet if i look it up@@thestargatekingand i do think that some of the stations up on the Sunshine Coast line that could really do with upgrades as well, especially those with just a singular platform - even the stations between Lota & Cleveland should have a second platform

    • @thestargateking
      @thestargateking  Месяц назад

      @@Enthusiastic-Trainspotter-BNE what do you mean 10 years ago? If you mean other stations being worked on there’s several still in progress right now and several more planned including Albion, wooloowin and every station from Trinder park to Beenleigh

  • @davemail66
    @davemail66 Месяц назад +1

    I can't believe that in 2024, QR are still running EMU's (with no toilets) on services to Nambour / Sunshine Coast

    • @RowBr0
      @RowBr0 Месяц назад

      Don't worry. Once Nambour is paired up with CRR, they will only be able to run NGR (and eventually QTMP) trains.

    • @thestargateking
      @thestargateking  Месяц назад +1

      @@davemail66 in the event a non toilet unit ends up towards Nambour they do a comfort stop at caboolture, makes the train late but I imagine with the 160 fleet being refurbished you can end up short every now and then

    • @Enthusiastic-Trainspotter-BNE
      @Enthusiastic-Trainspotter-BNE Месяц назад

      well@@davemail66they even have operated 220s up there

    • @Enthusiastic-Trainspotter-BNE
      @Enthusiastic-Trainspotter-BNE Месяц назад

      that there i definitely have experienced before@@thestargatekingbeen on a Nambour service without toilets being held up at Caboolture for at least five minutes or so, same with a southbound one

  • @joohanlee2459
    @joohanlee2459 Месяц назад

    When was this filmed?

    • @thestargateking
      @thestargateking  Месяц назад

      the day the station reopened, 9th of september

  • @james6969
    @james6969 20 дней назад

    late comment ik but where u like who tf is that tilt train honking for

    • @thestargateking
      @thestargateking  20 дней назад

      @@james6969 could be the level crossing or the kids on the bike being stupid

    • @james6969
      @james6969 20 дней назад

      @@thestargateking well guess what it's none of that I was arm pumping the tilt train

  • @electro_sykes
    @electro_sykes Месяц назад

    they didnt even remove the damn level crossing? missed opportunity

    • @thestargateking
      @thestargateking  Месяц назад +1

      @@electro_sykes not every level crossing is a hazard that requires removal, if they were to remove it they would likely do road over which would be a seperate project (similar to the current project at Carseldine and soon coopers plains.
      You’d only bother doing something like Skyrail when you have several back to back to back level crossings which isn’t a common thing on the network.

    • @electro_sykes
      @electro_sykes Месяц назад

      @@thestargateking I would of personally done deep a cutting for banyo and replaced Banyo and Binda stations with a new cut and cover Banyo Station in between. Banyo level crossing would be hard to remove otherwise and its pretty dangerous.

    • @thestargateking
      @thestargateking  Месяц назад

      @@electro_sykes it’s very expensive to do that to remove a single level crossing and Banyo stabling yard makes moving the track impossible

    • @electro_sykes
      @electro_sykes Месяц назад

      @@thestargateking or elevated could be better actually. The stabling yard would have to go but there are some nearby warehouses that could be demolished for that. that said, although it is quite dangerous, banyo level crossing acts as more of a local one, since many use northgate road overpass to get between southern cross way and sandgate road.

    • @thestargateking
      @thestargateking  Месяц назад

      @@electro_sykes yeah they arent going to remove banyo yard, it would be cheaper to do a road bridge over the train line than relocate a depot