Это видео недоступно.
Сожалеем об этом.

We Used FLEX SEAL On Our New Ram Promaster Van Build Sub Floor Part 1 of 2

Поделиться
HTML-код
  • Опубликовано: 1 авг 2024
  • Here we show in Part 1 how we used Flexseal to create a moisture barrier before installing the sub-floor. I Part 2 we will show the 1x1 stud install and the Insulation board to complete the sub-floor
    Flex Seal we used: amzn.to/3cCqPY0
    Overland Solar: bit.ly/3rgThmk
    The BEST CAMPING CHAIR ON EARTH: bit.ly/2MpEdUS
    A Great Podcasting Mic: amzn.to/3o3M4Ec
    Camera We Use: amzn.to/3obpgDG
    Camera Gimbal: amzn.to/3l60rGy

Комментарии • 4

  • @terriestewart3102
    @terriestewart3102 Год назад

    Ditto...what they said 😍

  • @sherylyeadon3155
    @sherylyeadon3155 3 года назад +4

    I am waiting to watch Part 2 of your floor sub build. This is the info that I need to learn. 😊

    • @tarhesabz
      @tarhesabz 2 года назад +1

      Me too 🙏🏻☺️

  • @michaelnatcher8047
    @michaelnatcher8047 Год назад +1

    How well has the flex seal worked as a barrier?? Thinking I'm gonna do the same