Jack from Jack's Woodworking Designs did it! Edgebanding the front edge before installation took 8-10 days. It was almost 1 mile worth of edge banding!
Classical Grasshopper parametric exercise done with surfaces and contour lines. I've done many of these. However the ASSEMBLY and the construction is very revealing. This speaks much more than just an exercise of profiling curves. Good illustration.
i dont see any plywood edge lines, did you apply edge veneers after the cuts? and just a guess based on my prices $100,000 in plywood alone? truly amazing work and impressive speed for cutting 600IPM is about the maximum stable speed across axis' on my machine. i can get upto 1000IPM on the x axis but on the Y axis if i go faster than 600IPM i get ball screw whipping.
Hello! You are correct, PVC edge banding was applied with contact cement. The contact cement comes right off the pre-finished material with a little rubbing using some thinner without the pre-finished coating getting ruined. Plywood material was about $40,000!
What did you guys use to come up with the primitive shape for before slicing? I want to find a primitive simulation tool that’s easier to create organic shapes rather then doing mesh modeling in f360.
Hats off to the guy who had to edge band all of those.
Jack from Jack's Woodworking Designs did it! Edgebanding the front edge before installation took 8-10 days. It was almost 1 mile worth of edge banding!
Classical Grasshopper parametric exercise done with surfaces and contour lines. I've done many of these. However the ASSEMBLY and the construction is very revealing. This speaks much more than just an exercise of profiling curves.
Good illustration.
I can appreciate the vision and planning this took.
That's nice.
Phenomenal outcome! Edge banding the pieces was a great idea too.
My man Jack!!! Amazing machine !!
This is awesome
This is amazing 🔥
Wow!
Way Cool
What software did you use to design this?
What software did you use?
i dont see any plywood edge lines, did you apply edge veneers after the cuts? and just a guess based on my prices $100,000 in plywood alone? truly amazing work and impressive speed for cutting 600IPM is about the maximum stable speed across axis' on my machine. i can get upto 1000IPM on the x axis but on the Y axis if i go faster than 600IPM i get ball screw whipping.
Hello! You are correct, PVC edge banding was applied with contact cement. The contact cement comes right off the pre-finished material with a little rubbing using some thinner without the pre-finished coating getting ruined. Plywood material was about $40,000!
Wow that is super cool! How many hours/days did this take to cut out?
The cutting alone took 7 days (8 hour days) and the installation itself took 5 days.
What did you guys use to come up with the primitive shape for before slicing? I want to find a primitive simulation tool that’s easier to create organic shapes rather then doing mesh modeling in f360.
The design for this prject was done in Fusion 360: Grasshopper, then programmed into Vcarve Pro.
This is awesome 👏! Could please tell
Me the name of the first song ? Trying to shazam it but nothing shows 😊
It's actually a song from audio jungle. Here is the link to it: audiojungle.net/item/trip-hop/18842739
Do you sell the vector?
Hey, unfortunately we don't sell the vector.
💪😎👍
استهلاك مفرط لالواح الخشب
How much the whole service cost ?
We don't have that information, but we could tell you that the plywood material cost was $40,000!
@@LagunaTools Thanks
While I like the finished result, I can't help but think that it is an incredibly inefficient use of materials.