The Railways conducted a test run of the 3.5-km-long freight train, Super Vasuki, with 295 loaded wagons carrying over 27,000 tonnes of coal between Korba in Chhattisgarh and Rajnandgao in Nagpur on August 15, as part of the 'Azadi Ka Amrit Mahotsav' celebrations. The train run by the South East Central Railway left Korba at 13:50 and took 11.20 hours to cover the distance of 267 km. This is the longest and heaviest freight train ever run by the Railways, the national transporter said, adding the train takes about four minutes to cross a station. The amount of coal carried by Super Vasuki is enough to fire 3000 MW of power plant for one full day, officials said. This is three times the capacity of existing railway rakes (90 cars with 100 tonnes in each) which carries about 9,000 tonnes of coal in one journey. The train was formed by amalgamating five rakes of goods trains as one unit. The Railways plans to use this arrangement (longer freight trains) more frequently, especially to transport coal in peak demand season to prevent fuel shortages of power stations, the officials said. Earlier this year, coal shortages had pushed the country into a severe power crisis.
That mechanic : iam leave 10 days because iam so suffering for body pains. That railway master : well done my boy keep going and take a rest and come after 10 days for more energy
Amazing video 6 WAG 9 locos equals 360000 hp . The power of Indian Railways . Cheers and thank you from Australia .
Thats tremendous power!!!
6 wag9= 36000horsepower. Not 360000
@@rakshatkumar1604 yes sorry I was a bit eager . Thank you .
@@judefernandez827
1 Wag12 = 12000hp 🎉
Union pacific requires 4 engines for 80 wagons but Indian railway requires 5 engines for 350 wagons. Jai Indian Railways
295 Wagons
We have powerful engine bro... If I am not mistaken then last year we developed most power full wagon engine with bobo+bobo ++ bobo+bobo configuration
6 engines
Mujhe yeh batao - Bhains bada ki dimag?
@@adarshmishra4332we don't develope any engine..all are general electric engine which is US company.
The Railways conducted a test run of the 3.5-km-long freight train, Super Vasuki, with 295 loaded wagons carrying over 27,000 tonnes of coal between Korba in Chhattisgarh and Rajnandgao in Nagpur on August 15, as part of the 'Azadi Ka Amrit Mahotsav' celebrations.
The train run by the South East Central Railway left Korba at 13:50 and took 11.20 hours to cover the distance of 267 km.
This is the longest and heaviest freight train ever run by the Railways, the national transporter said, adding the train takes about four minutes to cross a station.
The amount of coal carried by Super Vasuki is enough to fire 3000 MW of power plant for one full day, officials said. This is three times the capacity of existing railway rakes (90 cars with 100 tonnes in each) which carries about 9,000 tonnes of coal in one journey.
The train was formed by amalgamating five rakes of goods trains as one unit.
The Railways plans to use this arrangement (longer freight trains) more frequently, especially to transport coal in peak demand season to prevent fuel shortages of power stations, the officials said.
Earlier this year, coal shortages had pushed the country into a severe power crisis.
Rajnandgaon is in Chhattisgarh only.It is a city.
Modi kaa zehar mahotsav
It's not a test...
Its on work at heavy mobilization of coal
Excuse me sir, rajnandgaon is a city in Chattisgarh not in nagpur
rajnandgaon is a city in Chhattisgarh approx 200 km far from raipur and a home of ex CM Chhattisgarh Dr Raman Singh
Imagine waiting at railway crossing to get to work!!
😬😊
You might as well bring along a mattress for resting till the monster phyton passes😉
And imagine you're already late💀
@@shankarpoti1985 potty💩
Imagin if this train crossing at 20 km/h
Imagine we are getting late to office and suddenly this train came on crossing😂😂😂😂😂😂
🤣🤣🤣🤣🤣🤣
You will have to apply for half a day leave!
Require 5 minutes only as video
Very well done Indian Railways 👍🏽 "Way to go!"
দারুন দারুন হয়েছে ভিডিও টা 👌👌🚂🚂
రైల్వే గేటు దగ్గర ఎదురు చేసే వారి పరిస్తితి పాపం 😀😀😭😭
That's right 😔😟🙁😥😞😿
Passengers on the other train thought "sala ye train kahe khatam nehi hota be"
There were 295 coaches(not included engines).
Never Ending Train by Indian Railways🇮🇳
Eager to join railways 😍
will join soon
Oh !!!! Over 290 wagons ultra longest freight train !!!!
That mechanic : iam leave 10 days because iam so suffering for body pains.
That railway master : well done my boy keep going and take a rest and come after 10 days for more energy
Indian.gujrat.🇮🇳🇮🇳🇮🇳🇮🇳🇮🇳🇮🇳🇮🇳🇮🇳
That another train be like mere sath bhi mere baad bhi 😂
When this came on crossing all take there beds to sleep here😂😂😂😂
🤣🤣🤣🤣🤣🤣
Pehla engine toh kabka destination pe puch gya😂😂
very looooooong train
Beautiful and well thought name,
Super Vasuki. Right from India's ancient history.
Wow its just amazing🌟❤️
5:14 finally inner peace 😂😂😂
How many engines were used
I counted ~60 in one engine, and someone counted 295 bogeys , so should be 5
Superrr bro. Great sharing. Pin my comment as a Train lover
Super catch
The first, third and the fifth freight rakes are the BOXNS wagons while the second and the fourth freight rakes are BOXNHL wagons in coal livery.
295 wagon....😃😃
Why we are not suing WAG 12 for 350 Wagons?
Itni lambi train 😴
Me ginne ki kosis karrahata lekin gin nehipaya 300 ke bad 🤣🤣🤣🤣
I think locomotive at front has already crossed next station.😅
Nice
This time the wagons are full unlike 1st one I saw
Train LIC:-destination ke saath bhi destination ke bad bhi
Legend says that train is still passing through station 😂😂
Ginte ginte kab nindh aa gayi malum hi nahi pada 😅
Black colour ka maal gaadi aur neend de Raha tha
W Indian Railways casually hauling a train of coal that is worth more than Pakistan's entire economy🤣🤣
Where?
Such a amazing long n long wagon with number of 291🤔😱
295 wagon
awesome
How does the last Loco pilot can see the first engine ?? Or first engine can signal to last engine !?
Walkie talkie ?
Jai hind 🇮🇳🇮🇳
Half of the Wagons are half filled. !!! for Making a record its Okay.
... and so?
295 wagons 3.5 kms distance
Engine Bogilu ani 302 boxes vunay frnds 😳🤯🙆♂️
Kya ye ek train hai
😍😍😍👌👌👌
Hii
290 dibbo vali train 🤗🙄
Yeh kuch bhi nai 😂
Sabse lambi 7.3 km hai 😂
👍
Jai hind railways🎉🎉
100 sunar ki 1 luhar ki
Super
Supper 👌👌
This goods train was endless
290 goods coaches are there..
290
Nice to watch
oh my god 291 coaches
i have counted. wtf
👍👍👍
O bai😵🤯😴😴
298 goods 5 train
300 box supr
295
@@yogeshmaravi2654 including engine 295+5=300
Total 318
That was slow
2x pe dekh
😦😦
5 min take to cross 👍
Perfect for people on railway crossing