    Let's get started.
    First set the tripod and winch machine in position and start the winch machine
    Put them the canter of the pile point and bore them with the beller
    Then canter the beller in the middle of the pile point. After that boring with the beller
    Use clean water in the bore hole while boring the beller. After that clean the mud siol from the bore hole completely.
    Use clean water always to beller boring
    After the beller boring install the casing in proper position here we have install the casing by applying force from upper side and by making the bottom soil (below the casing) after installing the casing remove soil from the casing .
    Now let's install the chisel inside the casing.
    There is an adapter on the top surface of the chisel,
    There is a threads inside the adapter, with which the threads of the drill road are rotated and joined and connected to each other.
    Now the 1st drill road is started boring by connecting with chisel.
    With this process, the drill road is boring together with another drill road.
    Boring is done according to the originator of the boring depth.
    Once the boring is complete, the dill road is removed one by one.
    At the end, the chisel is also removed.
    Now the bottom cage is inserted into the bore.
    And then the middle cage or top cage is inserted.
    After that welding of vertical rod is done by giving lapping as per requirement.
    The outer ring is then tied to the banding wire in the lap area. And then welding is also done.
    The tremie pipe is then lowered from the inside of the cage to the bottom of the boring.
    The bore is then washed with water by running a vertical pump with a flinch of the tremie head.
    Before washing the density of water,1.05 and after that wash 1.1
    Hydrometer is used to measure water density
    The casting is started by applying a hopper after being bore washed.
    The tremie pipe is removed when casting is done.
    The casing is removed at the end after tremie bottom.
    Watch Related Video Of my RUclips channel # pile foundation#
    Dmc pile,Direct mud circulation, Bored cast in_situ pile complete process,Pile foundation,
    • Dmc pile | Direct Mud ...
    Rcc pile casting by hand mixer machin used Chutcart
    • concreting of pile fou...
    Thanks for coming on this channel so if you want to get Dmc piling Detailed video in Hindi / English don't forget to Subscribe
    Comment,Like and Share the My RUclips channel Pile Foundation
    Follow me on
    Facebook
    / pile-foundation-277560...
    Instgram
    ........................coming soon.......................
    For Sponsorship & Business Enquire
    Mandalsanjeet62@gmail.com

Комментарии • 12

  • @Tracks777
    @Tracks777 4 года назад +1

    lovely stuff

    • @Logisticsroadlines
      @Logisticsroadlines  4 года назад

      thanks dear
      Thanks for coming on this channel so if you want to get dmc piling video in Hindi / English don't forget to Subscribe Comment,Like and Share the channel Pile Foundation.

  • @sushan26
    @sushan26 3 года назад +1

    Thank you sir

  • @aarohimondal17
    @aarohimondal17 4 года назад

    Very informative video

  • @mdshadabanwar3649
    @mdshadabanwar3649 3 года назад +2

    Very Informative video. You did a great job. Keep it up. And i hope you will upload more site video for the help of fresher. Thanku
    If you improve your edit of lines it will become more helpful because the sentences are so much blur and very difficult to read.

    • @Logisticsroadlines
      @Logisticsroadlines  3 года назад

      Thanks for suggestion..
      There will be no problem with the next video..

  • @jajjohn6771
    @jajjohn6771 4 года назад +1

    Sir,Video is very good.....
    Is this piling done in a single day and how many hrs does it take to complete the process sir

    • @Logisticsroadlines
      @Logisticsroadlines  4 года назад

      Hello dear
      Yes this pile is done one day (calculated 8 Hrs ) But this question is totally depending on ground soil report and dia of pile

  • @iexplore9870
    @iexplore9870 Год назад

    font ta color change karo bhai, kuch parha nehi jata

  • @jaidulsekh3883
    @jaidulsekh3883 4 года назад +1

    Pile contractor ager piler khobor nai