PILE FOUNDATION OF BRIDGE IN DETAIL || PILING || MAIT MACHINE || HYDRAULIC DRILLING RIG|| PILE CAGE

Поделиться
HTML-код
  • Опубликовано: 27 янв 2025

Комментарии • 22

  • @ranjeetKumar-tg2sr
    @ranjeetKumar-tg2sr 2 года назад

    Thanks sir aap kafi details me btate hai

  • @kennyomega8937
    @kennyomega8937 2 года назад

    Useful video. Thank

  • @shankarbirajdar1356
    @shankarbirajdar1356 Год назад

    @13.26min what is name of this procedure (removing cement exposing rebar) ?

  • @TheUnknownvisitor
    @TheUnknownvisitor 2 года назад

    Vertical out hai,

  • @justaewaine
    @justaewaine 2 года назад

    Bhai mery first of all aap kay logo ki safety bilkul ni dosra aap nay trimie pipe ko boar main dalny kay bad sub kuch hata lia i mean clump wagera .
    Tesra kay aap nay na he ramp bnaya jis say truck waly ko mushkil say bore pay truck lagana para.
    4th kay aap ny koi descending ka function ni rakha agr ni to pani ko bahir phenkny kay liay chota sa pit bna lety hain jis say kay thora yeh hota hy kay pani cassing ki sides main ni ghusta jis say koi pareshani nai peda hoti.
    Or han spacer lazmi use kia karo

  • @satyajitdas9980
    @satyajitdas9980 6 месяцев назад

    First pouring time charging plate dala nahi, ganda Pani pile k andar gushgaya, a to bahut bara galti hogaya matlab pile bakar hogaya...

  • @Krishnavlogs9909
    @Krishnavlogs9909 2 года назад

    concreteing karte hue charging plate nhi lagayi

    • @Krishnavlogs9909
      @Krishnavlogs9909 2 года назад

      agar concrete hard hota to treime pipe chowk karsakta hai

  • @msvlogs9923
    @msvlogs9923 3 года назад

    How many pilling for one pillar

    • @ranjeetKumar-tg2sr
      @ranjeetKumar-tg2sr 2 года назад

      Depending upon soil quality and load
      Normally 4 , 6, 8, 10 group use

  • @akashshelke1475
    @akashshelke1475 2 года назад

    Can we get this drawing copy pdf in discription

  • @rohitsinha5991
    @rohitsinha5991 3 года назад

    Sir thoda ache se samjhao ki cutt of level pile me kya hota hai

    • @civilinformationatsite
      @civilinformationatsite  3 года назад

      As per IS 2911-1-2
      It is the level where a pile is cut-off to support the pile caps or beams or any other structural components at that level.

    • @LAXMAN12325
      @LAXMAN12325 3 года назад

      @@civilinformationatsite It is the cut-off for mixed soil, plastic with concrete that comes up above the pile cut-off level,
      But we need pure concrete to be there so that we cut out that mixed concrete where soil particles, plastics & other unacceptable particles are present.
      Ex:- if your depth of pile is 10m(pile cut-off level @10m) then You've to pour concrete up to 11m to 12 m
      That means- 1m to 2m more than that(above cut-off level).
      "You might have one doubt that how unacceptable concrete mixture comes up above the pile cut-off level"
      It is because we placed our Timmy pipe to pour concrete into the pile hole but we'll not place our Timmy pipe exactly to the 10m means not into the touch of hard strata so that when we pour concrete through Timmy pipe then after filling the bottom part, concrete starts coming up around the Timmy pipe.

    • @vverma1987
      @vverma1987 2 года назад

      @@civilinformationatsite please send your no

  • @onlyayushonly
    @onlyayushonly 2 года назад

    Betonite consumption kitna hota hai for 1200mm dia pile

  • @deepakkumarpandey6696
    @deepakkumarpandey6696 3 года назад

    piling