AC16 221A - SDSR Driver Training run to Clifton - 11/03/2023

Поделиться
HTML-код
  • Опубликовано: 7 ноя 2024

Комментарии • 12

  • @JamesHunterPhotos
    @JamesHunterPhotos Год назад +1

    How good!

    • @paul1089
      @paul1089  Год назад

      So good to see something other than a C17 for a change.

  • @TrainsPicturesProductions
    @TrainsPicturesProductions Год назад

    AC16 221A did very well, I'm still waiting for 974 to return

  • @Engineer5344
    @Engineer5344 Год назад

    awesome video paul, great to see 221a stretching her legs again. 😁

    • @paul1089
      @paul1089  Год назад +1

      Honestly, I never thought I'd see it out this way, but here she is. They'll be plenty more videos of her before she's returned to QR.

    • @Engineer5344
      @Engineer5344 Год назад

      @@paul1089 fantastic, can't wait to see them.

  • @trainloverstudios9673
    @trainloverstudios9673 Год назад

    What's happening to C17 971 at the start of the video

    • @paul1089
      @paul1089  Год назад

      The maintenance personnel are waiting on parts to arrive before a trial fitting can be made.

    • @andrewmcneish5309
      @andrewmcneish5309 Год назад

      How will it take

    • @paul1089
      @paul1089  Год назад

      @@andrewmcneish5309 I think they are aiming to have the loco operational by June or July.

    • @scottcannell5584
      @scottcannell5584 Год назад

      Is c16 221a on loan or is it there permanently at Warwick

    • @paul1089
      @paul1089  Год назад +1

      @Scott Cannell It was supposed to be on loan for a couple of months, but it's been returned back to the Ipswich Workshops following a derailment over some points. C17 974 is at Southern Downs Steam Railway at present and has just finished a 3 day long weekend tour to Goondiwindi.