LNG Jetty - Costs Planning Scheduling

Поделиться
HTML-код
  • Опубликовано: 3 окт 2024
  • Hi everyone, welcome to ‘Project 21’,
    in this video we present the direct costs breakdown structure, the construction schedules and, main breakwater construction planning activities for the purposes of estimating a lump sum contract and building the LNG Jetty that is part of an LNG Plant.
    We are talking about the Marine Facilities of an LNG Plant that consists of 1.3-kilometer trestle bridge, a loading dock, a navigation channel for the entry and exit of ships, and an 800-meter-long breakwater that allows for the safe mooring of ships. The ships that enter the plant have a capacity of 135,000 to 173,000 m3. To load the ships, they are connected through 3 loading arms and an additional one that recovers steam at the end of the maritime terminal.
    if you are new to this topic, now you got a pretty much idea of this topic which is part of an LNG Plant WBS
    So, i hope you all find useful this presentation!
    If you like this content, don’t forget to SUBSCRIBE to the channel and leave a comment;
    Thank you for watching and i will see you in the next one.

Комментарии •