Milford Central Park 2023/2024
HTML-код
- Опубликовано: 10 ноя 2024
- This is a depiction of the 2023-2024 Central Park Connection Project, between Main Street and Pettibone Creek. (Doesn't show west of Pettibone Creek where the new sports courts are located.) The new plan includes a reshaped drive entrance for better, safer access and a more manicured front yard; an accessible perimeter walkway; a boardwalk/riverwalk that includes a cantilevered viewing platform over the river with all-ages swings; two relocated landings for kayaks and canoes; a new parking lot; and a new picnic pavilion styled after the LaFontaine Family Amphitheater. The park will be planted with all new riparian plantings along the river and gardens and trees along the park. Sponsored by the Milford Downtown Development Authority, Milford Township and the Village of Milford. ARTIST'S CONCEPTUAL RENDERING. LANDSCAPE PLAN will denote final plantings.