1:26 "Gulf countries ALL OVER THE WORLD" wow sounds amazing. Except that all Gulf countries only exist in the Middle east. If anyone can find me a Gulf country in N/S America, Africa, East Asia - I will salute them.
Each service for High rise Buildings MEP Basics please share Drainage, HVAC, Staircase, Pump room, Basement Ventilation, Heat Exchangers, Calculation for Sprinkler Pump selection, Breaching Inlet, Hot Water Sarculation Pump, Etc., Expected more Ji. I Love your friendly advise.
you are absolute;y wrong engineer,. high rise buildings are using pneumatic pump to maintain the hot and cold water from basments directly to the floor, ythere is no need service floor my dear engineer ..
U are right sir, Service slab not at all required. Even 40 stories building we doing gravity distribution system. Some of the projects we have done. Combination of both gravity and hydropneumatic pneumatic system.
Nice explanation shibin. Because u had a huge experience in Dubai metro, high rise building etc. well done goahead.
Only problem is the language by the way, but information is worthy. 🤣 Your confidence is phenomenal afterall.
Better to explain in a language you know.
Shibin Anna !! Very well explained ! Thank you so much for this valuable content.
Great explained sir thank you so much sir please mechanical maintenance engineer job dutyes explain karye one time❤I am from jharkhand dhanbad
1:26 "Gulf countries ALL OVER THE WORLD" wow sounds amazing. Except that all Gulf countries only exist in the Middle east.
If anyone can find me a Gulf country in N/S America, Africa, East Asia - I will salute them.
Nice explanation Sir.
Thanks, my doubts cleared 🎉
Thank u for information related to plumbing.
Pls use some slides and pictures for better understanding, thanks for the information
Please share details about drainage riser line of 25th floor commercial building and how to control that flow of drainage pipe in basement...????
Each service for High rise Buildings MEP Basics please share Drainage, HVAC, Staircase, Pump room, Basement Ventilation, Heat Exchangers, Calculation for Sprinkler Pump selection, Breaching Inlet, Hot Water Sarculation Pump, Etc., Expected more Ji. I Love your friendly advise.
Nice explanation sir
Very nicely explained sir !!! keep up the good works
Isko sar Hindi mein translate kijiye
Thanks sir besafe sir❤❤❤
Most of bulding booster pump serves to higher floor. Pls make correction and make another vedio
Very nice sir...waiting for next part.
Waiting for your next video....
Sir can u show the example of schematic pf high rise building
Eni Malayalathil parunju theruvo
very nice sir
Very exactly said
Well explained
i learn from you
What are doing... here...plz...go... labour work..😊
Thankyou sir
im waiting your next video for drainage line.
11:30
Khand di nista baba,haha
Tx sir❤❤❤❤
Sir sum pump kese lagata he pipeing kese hota he nrb gete valve kese lagata he upload karia
Thank you
thank u sir,
SIR ARE U TAKING ANY ONLINE CLASSES
Water year problem kheya hota hey
Sir we are waiting your next video about drainage line
PRV means pressure reducing valve know
👌👌
Kindly talk in malayalam
you are absolute;y wrong engineer,. high rise buildings are using pneumatic pump to maintain the hot and cold water from basments directly to the floor, ythere is no need service floor my dear engineer ..
U are right sir,
Service slab not at all required.
Even 40 stories building we doing gravity distribution system.
Some of the projects we have done. Combination of both gravity and hydropneumatic pneumatic system.
Very good explanation👍
How can I contact you, Please share your contact details
I need some queries
Thank you
Thank you