DRY LEAN CONCRETE is cement concrete with low slump as well as low cement which is being laid as a first layer for rigid pavement over sub-base (GSB) , rolled & compacted by mechanical means.We will discuss with all sections one by one as per following order:
GENERAL
REFERENCE
EQUIPMENT WITH ESSENTIAL FEATURES
MANPOWER REQUIREMENTS
MATERIALS
TRIAL STRETCH
QUALITY CONTROL TESTING & ACCEPTANCE
SAFETY REQUIREMENTS /MEASURES
1.GENERAL
This work should be carried out accordance with the wants of Contract Specifications and in conformity with the lines, grades , drawings or as directed by the Engineer. The work will include furnishing of all plant and equipment, materials , labour and performing all operations, in reference to the work as approved by the Engineer.
The design parameters of dry lean concrete , if any will be as stipulated in the contract drawings.
1) Difference between Rigid and Flexible pavement. सीमेंट और डांबर रोड में क्या फर्क है Link - • Difference between Rig...
2) किलोमीटर स्टोन में अलग-अलग रंगों का क्या मतलब होता है? Meaning of Different colours in km stones
link - • किलोमीटर स्टोन में अलग...
3) How to Mark Center Line By Total Station in Road टोटलस्टेशन TS द्वारा सेंटर लाइन को कैसे मार्क करें
link - • How to Mark Center Lin... Хобби
Good
DLC ke Bare me bahut hi important jankari di sir aapne
Good joob sir ji
Nice video
Nice topic sir ji
Thanku 🙏
awsome
thanku
Good work engineer sahab
Good job
Excellent knowledge ❤
Thank you sir
Thank you so much sir
Bhai video continue bnate rhe h ...aap ka bahut bahut dhanyawad ❤
Thank you good info brother
every engineer can do dlc laying after watched this video
Nice
Thank you bhai . Bahut hi Achhe se Explain kiye h .
Quality getting better day by day 👏
👍👍👍👍👍 You have told a lot of useful information sir thank you
Very nice video
Very nice sir
Beat
bahut badiya sir ji
Very very nice
🎉
Pqc ka bhi video banaye
Sir MDD - Omc or bed test ki video ka link bataw sir
Sir itani information kha se lekar ate he
why the cameraman is shaking so much
how to laying PQC layer through Paver near the Drain when the width of PQC bed is 7 meter
Do 5 MTR width with paver and 2 MTR width manually..
2nd option First do PQC 3.5 - 3.5 MTR in 2 times if the paver width is maximum 5 MTR or if 7 MTR width paver available then you can do in single lane and then make a drain
Good