Hello Bro. I have saw you commenting on various rail project video many times. Can we become friends so that we can exchange your thoughts, opinions and knowledge on this same stuff?
If the straddle carrier design can be changed a bit then the Girder can be transported directly to the Girder transporter thus removing the need of Bridge gantry.
no. you can't drive through the existing viaduct. and having a overhang is just not possible (reasonably) with this weight. I just wonder, once the viaduct is quite long, if the girder carrier will become the bottleneck. does it drive back and forth enough fast, that the casting yard or the girder "placer" doesn't have to wait.
If only we can lay/upgrade existing railway network in the country to half the haul bearing capacity of these HSR tracks, then that would immensely help faster Passenger travel speed. Especially for Semi-High speed trains like Vande Bharat Express.
when will the works start in mumbai? Isn't there going to be a huge undersea tunnel? At that rate the route will be finished years before mumbai. Launching service on section could be an option though
Dude, I'm also an Indori, and I also wanted that to happen, but this is not feasible anymore, just forgot this. Don't expect government to ever do this. This is impossible now (for at least next 50 years).
@@dakshhcr2574 aara bro abhi ki kon bat kar raha hai future ma hoga kyuki pehle INDIAN RAILWAY chota sa strech ma chalo hona ka bad Aaj har jagah phuch gayi hai aabhi to possible nahi but future ma to ho sakta hai I AM ALSO INDORI🍻👍♥️
Girder casting yards are strategically located. Yards are not made at any random location nhsrcl team found. Aur yadi dono taraf girders launch karenge, toh usme launching waali machine ko baar baar aage pichhe karna padega. That's why, girders are launched in one direction only. Dusri taraf ka kaam pichhe se aane waale launching machine ke ho jayega.
Feeling proud to be an Indian. Jai Hind🇮🇳.
first project is always the toughest .
Hello Bro. I have saw you commenting on various rail project video many times. Can we become friends so that we can exchange your thoughts, opinions and knowledge on this same stuff?
If the straddle carrier design can be changed a bit then the Girder can be transported directly to the Girder transporter thus removing the need of Bridge gantry.
no. you can't drive through the existing viaduct. and having a overhang is just not possible (reasonably) with this weight.
I just wonder, once the viaduct is quite long, if the girder carrier will become the bottleneck. does it drive back and forth enough fast, that the casting yard or the girder "placer" doesn't have to wait.
@Someone they have different cast yard for every section.
Jai Hind... Superb construction work.
We don't get bigger by age our toys becomes bigger
Exactly the same thing that came to my mind
Fantastic now bullet train work will be speeded up
Excellent work👍👍
amazing
kudos, great wok NHSRCL.
This is really huge construction site.........this requires lots resources human as well as technology 👏👏👏
2 girder par day is very good speed for Bullet train.
Here in bengal metro 2 girder per month*😢
Momta DC doing corruption
It's not 2 girder per day,
Video shows only one site.
Launchers are at various sites.
It might be many.
They are laying approx 12-13 km every month now. It is very good speed.
@@myjourney6510 ?
Bullet or bengal?
@@Vishal7Prasad bullet train
If only we can lay/upgrade existing railway network in the country to half the haul bearing capacity of these HSR tracks, then that would immensely help faster Passenger travel speed. Especially for Semi-High speed trains like Vande Bharat Express.
already work in progress mainly on HDN routes and elsewhere
@@jaguarunleashed4935 HDN routes? What does this mean?
@@varun2250 high density networks .golden quadrilateral networks with high traffic volume.
@@jaguarunleashed4935 Dhanyawadalu
nice
When will the work of other bullet train corridors will start ??
2026 😍
pending approval , then clearances etc, then funding , then land acquisition then construction
when will the works start in mumbai?
Isn't there going to be a huge undersea tunnel? At that rate the route will be finished years before mumbai.
Launching service on section could be an option though
the undersea tunnel is likely to complete by 2027 2028, rest of the section should be completed by 2026 or 2027
pls informed NHSRCl institute Vadodara work completed aur not update? ??????????????????
??????????????????????????
shaandar
♥️INDORE AHEMDABAD AND INDORE DELHI BULLET TRAIN CORRIDORS♥️
Every Indori's Dream !!! 🤩🤩🤩
bhai abhi aaram se baitho . pehle first line complete hone doh
@@jaguarunleashed4935 Dream purre hone mai time toh lagta hai!
Dude, I'm also an Indori, and I also wanted that to happen, but this is not feasible anymore, just forgot this. Don't expect government to ever do this.
This is impossible now (for at least next 50 years).
@@dakshhcr2574 aara bro abhi ki kon bat kar raha hai future ma hoga kyuki pehle INDIAN RAILWAY chota sa strech ma chalo hona ka bad Aaj har jagah phuch gayi hai aabhi to possible nahi but future ma to ho sakta hai
I AM ALSO INDORI🍻👍♥️
Why girder is launched from only one end. If launched from both ends it will be much faster
there are multiple sections where you have casting yards and launchers, video only shows from one location.
Girder casting yards are strategically located. Yards are not made at any random location nhsrcl team found.
Aur yadi dono taraf girders launch karenge, toh usme launching waali machine ko baar baar aage pichhe karna padega.
That's why, girders are launched in one direction only.
Dusri taraf ka kaam pichhe se aane waale launching machine ke ho jayega.
It's there...but this is only shown for education purpose
How many girders are being launched in a day ?
Hardly 3 😔
@@bot_nemetronicus Can I know the source of that information?
How do you know that 3 girders are launched each day?
10 launchers are working simultaneously, the target being 10+ kms per month
👏👏👏👏
🎉
A single grider weighs 970 MT which is almost equal to 1 Million Kg... Is this true... Sounds very unreal man... Considering it's only 40m long 😮
❤❤❤🇮🇳🇮🇳🇮🇳
MT means Metric tonnes btw.
And 1 tonne = 1000 km
... and despite this, some liberals say that "government is doing nothing", "work is very slow", without hesitation.
The media is controlled by anti development group and communist..what do you expect