This method of providing monthly or bi monthly video updates should honestly be adopted by all government projects. It just brings transparency and accountability to next level.
@@DhavalGamit1997Ab toh on ground progress achhi khasi ho gayi. Yadi koi bhi ab aake isko band karaega toh uski reputation ekdum 0 ho jayegi aur vote milne ke chance bhi kam ho jaege. Shayad ab koi iss project ko rokne ki koshish nahi karega.
200+ km Viaduct Complete ho gaya hain Every month abhi approx 10km Viaduct Complete ho raha hain ... Or Gujarat Section me All most 354 me se 300 km + Section me Piar complete ho gaye he ... Abhi River ke arround or Ahmedabad or Vadodara City areas me hi Piar work baki he ... Woh bhi Complition ki taraf hain
very excited to see this progress. But kya faida aise videos ka 1 count to do end mai kitne piers ready ho gye, kitne piercap ban gye, kitne km viaduct complete ho gya, kitne km deck slab ready ho gya. Tabhi to asli progress pta chalegi
@@utkarshsaxena7633I think there is a channel called Powertrain who provides updates on various infra projects in India, though maybe this organised information must have been gotten by the commenter from another channel
The progress update doesnt specify how much percentage of work has been completed. How many pillars have been erected, how many viaducts have been installed. The unfinished part is always cut in the video.
There are so many people in India who don't want development, I don't know why, that's why our country is not developing, because our minds are not developed yet, we all want to live a poor life, such a big project is going and even after that some people want to disrespect our country and country projects. Such a idiot people. Narendra Modi will again win in 2029 wait.
@@kabir1934 Bhai tu dekh liyo khud. Btw Paisa allot ek baar mei nhi hota Also, Congress Govt Freebies in Karnataka made a fiscal surplus state into fiscally deficit lol Maharashtra will join soon
Good job! Even though it is delayed compared to the initial project, looks like it has a good progression. I did not know that China was helping with their machine and technology to build these viaducts, I think it is a good choice to advance quickly.
that machine devloped by indian Contruction company L & T and yes its not a chinese technology for your information its a german technolgy invented by a german in 1960s and its slowly got upgraded by time ! so for now only five countries have this tech ! germany , spain,korea,china, india
@@adm.721 Agricultural land is not what determines production It's the adoption of mechanisation that increases the productivity of land BTW, plane travel is costly and contributes to climate change You are not very bright
@@hrp4566 hyderabad, bangalore, chennai should get a new line. Push your state govts to go for HSR corridors. If you begin now, construction might begin in the next 10 years.
What about progress report of Octtober? I believe if you give balance work report,it will be more useful. Pl. Don't re-run the sept. Month's video as october's progress report.
I think the track laying process is much quicker than the construction that is happening now. They probably don't want to start with the tracks and then have to wait again ... The bottleneck of finishing on time will be the underwater tunnel anyway ...
Track laying ek din mein 300 se 400 metres per day possible hai with available three track laying machine , agar slow hoga toh aur manga liya jayegaa 😊😊
Guys can we start a magazine for the diploma and degree holders projecting the monthly (by post offices money), quarterly (by banks money) and annual progress reports (by corporate taxes money) of bullet trains project and beml,rvnl plus bullet train manufacturing records and photos. Plus circulating them to junction stations,railway divisons and railway zones and vande bharat sleeper trains. And attracting the Xth and XIIth class level students via newspapers. So that more and more educated class can be employed in the construction and manufacturing projects.
Sound barrier lagaya hai.... station ke pass city banega ,,wo house wale waha sift ho jayenge ,,11 station 11 new city banayenge ,,, tum duniyadari nahi padhe kya ??
I want something like that in my country as well. Dear Achal Khare, would you come work with us in Kyrgyzstan to build a high-speed railway from Almaty to the Fergana Valley?
@@Jayant_Singh_Prashar Without the support of the Indian army, we continue to be stuck in one place; there are forces that have been hindering us for more than a year.
Surat - navsari section ko sqbde pehle poora karna chahiye ,,trainset seva shuru karna chahiye fir dono direction mein ek ek station add karna chahiye ,,, surat navsari section ko yudhdha star pe pehle poora karna chahiye ,,
I agree. But I am not asking why progress is less than that of Gujrat.l only expect that work should be expedited and it's ongoing status should be shown. In fact if need be progress in Maharashtra should be enhanced at the cost of Gujrat progress. It will serve no purpose if Gujrat work is completed three years before Maharashtra work. Finding reason for delay is very easy.Crux is to do intelligent planning and re-planning to achieve the goal in time. MODIJI HAI TO MUMKEEN HAI.
@@mustafasoni1879 India ke pass technology nhi hai iska sara Japan pe nirbhar hai abhi unke ispe depend karega kya technology de rahe hai nhsrcl sirf abhi sikh hi rahi hai , agar 2.5 years delay nhi hota to project completion pe hota even land acquisition nhi hua thaa , aur abhi speed se hi ho raha hai bhai latest videos dekh le
@@mustafasoni1879 Maharashtra me rough terrain ke hisab se to thik hi chal raha hai Gujarat jaise plain land nhi hai yaha western Ghats me isliye nhsrcl ne thane to pune wala line tha cancel kar diya kyuki project cost bohot badh jata
Can anyone give the status of 7 mountain tunnel and 4 river bridges in Maharashta and its time bound process plan. This is more of quantitative work than technological.what is status of@4000 piers?. No such reports are given Ln monthly report. What is use of playing progress film in which more than 50 % is same as last month's film.
Dear sir Singal lane track hai Ya double lane tracks Uper se samajh me nahi aa raha hai Edfc wdfc ko dekh kar bahut garv ho raha hai, aur ab bullet train ka besabari intjaar hai ।। देश का मेल भारतीय रेल 🙏🇮🇳🇮🇳🇮🇳🇮🇳❤️❤️
We're quite a bit slower, but it's happening! There's some really good construction updates for the California High-speed Rail project with a drone flyover on the Jason Dronin Around youtube channel.
🚅🚅Although Japanese engineering is number one,, but exterior design of a bullet train I like GERMAN ICE4 and Italian Italo designs of the trains than Japanese bullet train
Modi government dwara desh ka pehela aisa project h jo samay se pehle pura ho rha h .. RRTS ... isme bhi kejriwal tang ladya tha delhi government ke hisse ka paisa nhi de rha tha lekin fir bhi project delay nhi hua . Yha tk ki bich me corona bhi aa gya tha ..
i dont understand one thing , are there going be be only 2 tracks, when we see any china hsr video , we see 10-15 tracks , where there are many trains , some travel at 400 km/hr and some at 230 km/hr depending on the price, should we have done the sam thing?
Bhai mainly 2 ya max to max 3 he tracks hote hai , jo tune dekhe hai woh railway station yah railway depot k pass wala video dekha hoga . 8-10 tracks possible hai but jada practical nahi hoga as utni traffic nahi hoti hai tracks par .
Ja ha jarurat thi va modi gujrat ke hai bullet train nahi delhi me bullet train ki jyada jarurat thi delhi mumbai se jyada dur hai lekin to bhi gujrat me jaha jyada jarurat nahi thi va bullet train ladi nahi to mai aram ae delhi se mumbai japata lekin modi ji gujrat ke hai to phele gujrat me modi hai to mumkin hai gujrat delhi nahi 😅
Kam se kam 1 saal tak nahi baithunga in trains me. Pata nahi kis tarah ka kaam hua hoga, kitne paise khaye honge. 1 saal tak sab safe raha tab hi try karunga.
There are so many people in India who don't want development, I don't know why, that's why our country is not developing, because our minds are not developed yet, we all want to live a poor life, such a big project is going and even after that some people want to disrespect our country and country projects. Such a idiot people. Narendra Modi will again win in 2029 wait.
There are so many people in India who don't want development, I don't know why, that's why our country is not developing, because our minds are not developed yet, we all want to live a poor life, such a big project is going and even after that some people want to disrespect our country and country projects. Such a idiot people. Narendra Modi will again win in 2029 wait.
There are so many people in India who don't want development, I don't know why, that's why our country is not developing, because our minds are not developed yet, we all want to live a poor life, such a big project is going and even after that some people want to disrespect our country and country projects. Such a idiot people. Narendra Modi will again win in 2029 wait.
There are so many people in India who don't want development, I don't know why, that's why our country is not developing, because our minds are not developed yet, we all want to live a poor life, such a big project is going and even after that some people want to disrespect our country and country projects. Such a idiot people. Narendra Modi will again win in 2029 wait.
There are so many people in India who don't want development, I don't know why, that's why our country is not developing, because our minds are not developed yet, we all want to live a poor life, such a big project is going and even after that some people want to disrespect our country and country projects. Such a idiot people. Narendra Modi will again win in 2029 wait.
I am empressed... But Pura project 2030 se pahle complete nahi hoga. Bullet train ke passenger load ke liye express and superfast trains ko band kiya jayegaa Likh ke rakh lijiyega
There are so many people in India who don't want development, I don't know why, that's why our country is not developing, because our minds are not developed yet, we all want to live a poor life, such a big project is going and even after that some people want to disrespect our country and country projects. Such a idiot people. Narendra Modi will again win in 2029 wait.
There are so many people in India who don't want development, I don't know why, that's why our country is not developing, because our minds are not developed yet, we all want to live a poor life, such a big project is going and even after that some people want to disrespect our country and country projects. Such a idiot people. Narendra Modi will again win in 2029 wait.
There are so many people in India who don't want development, I don't know why, that's why our country is not developing, because our minds are not developed yet, we all want to live a poor life, such a big project is going and even after that some people want to disrespect our country and country projects. Such a idiot people. Narendra Modi will again win in 2029 wait.
This method of providing monthly or bi monthly video updates should honestly be adopted by all government projects. It just brings transparency and accountability to next level.
Bhai kai project aise hote he jo 6-6 mahino bad bhi jaise ke waise hi rahte he isliye govt. Monthly update nhi deti😂😂
@@Nileeshgaawre sahi me bhai. Delhi me railway ka new railway bridge bachpan se bante hu dekh rha hu😭
@@ShashwatShuklakolkata ka metro toh mere papa ke bachpan zamane se ban ra ab tak nahi hua 😢
I also want to work in these project how can I work in these project?
@@TechsumitX 😭. It's just so sad. Public ka paise ko waste kr rhe ye log.
Impressive work in Maharashtra in such short amt of time with rain
super work in Gujarat
In Maharashtra too
I also want to work in these project how can I work in these project?
Bullet train pure bharat me phele 🇮🇳🇮🇳
I am so excited 🙏🇮🇳
Jai jai siya ram 🙏🇮🇳
Impressive progress at BKC in such short time
Kam to ab hoga next 9 month mein... Rain gaya devlopment kam chalu ....
MVA ko vote m@t do plz.. 😢
@@DhavalGamit1997Ab toh on ground progress achhi khasi ho gayi.
Yadi koi bhi ab aake isko band karaega toh uski reputation ekdum 0 ho jayegi aur vote milne ke chance bhi kam ho jaege.
Shayad ab koi iss project ko rokne ki koshish nahi karega.
6-7 years more for Maharashtra.
@@DhavalGamit1997nehi ab nehi bandh karwa sakta, kyuki tender alot ho chuka hain, paisa bhi contractor ko diya ja chuka hain
Thank you from UK 🙏 amazing progress video I wiil travel on the Bullet train when completed.
Modi hai to............????❤
इस रिक्त स्थान को पूरा करे अपने शब्दो में
Proud to be an Indian 🇮🇳
Mumkin hai
Mumkin hai❤
Mumkin hai
200+ km Viaduct Complete ho gaya hain
Every month abhi approx 10km Viaduct Complete ho raha hain ... Or Gujarat Section me All most 354 me se 300 km + Section me Piar complete ho gaye he ... Abhi River ke arround or Ahmedabad or Vadodara City areas me hi Piar work baki he ... Woh bhi Complition ki taraf hain
What about maharastra brother? Any update
I also want to work in these project how can I work in these project?
so fast!!india superpower!
@@alpha4502 jab gujarat ka kam pura hote jayega wahi equipments maharashtra shift Kiya jayega , ab hame wait karna hoga kab koi FSLG machine ka kam gujarat mein khatam hoga par sayad lagta nahi 2025 mein girder launching start hoga maharashtra mein . I hope 2026 mein kam chalu ho jaye maharashtra mein .
i from ahemdabad and bullet train corridor is near to completion here
Good progress on the river bridges and the railway stations 👌 ... Looking forward to the completed beautiful stations 🤩
very excited to see this progress. But kya faida aise videos ka 1 count to do end mai kitne piers ready ho gye, kitne piercap ban gye, kitne km viaduct complete ho gya, kitne km deck slab ready ho gya. Tabhi to asli progress pta chalegi
exactly
Progress - 46 percent @@atharvatar
218 km of viaduct complete(100% true) .....320 km of piers ready(rough figure)...46% work complete overall
@@its_not_the_Ishu thanks, where you got this info from?
@@utkarshsaxena7633I think there is a channel called Powertrain who provides updates on various infra projects in India, though maybe this organised information must have been gotten by the commenter from another channel
*Being Bullet Train 🚅 Corredor engineer it's a proud 🥲 moment for us*
The progress update doesnt specify how much percentage of work has been completed. How many pillars have been erected, how many viaducts have been installed. The unfinished part is always cut in the video.
Underrated comment
u can just see last year month video and compare with this september video u will roughly know the difference of work between a month
There are so many people in India who don't want development, I don't know why, that's why our country is not developing, because our minds are not developed yet, we all want to live a poor life, such a big project is going and even after that some people want to disrespect our country and country
projects. Such a idiot people.
Narendra Modi will again win in 2029 wait.
Abhi Maharashtra Election ke baad Congress aur Uddhav aayega toh saara Bullet Train ka kaam rok dega😂😂😂😂
Nhi rok skte chah ke bhi sare chije clear h aur paise bhi de chuke h sare.
nehi ab nehi bandh karwa sakta, kyuki tender alot ho chuka hain, paisa bhi contractor ko diya ja chuka hain
Unki sarkar bhi to anni chahiye 😂 uske liye tabh rokenge
Agar government badlti h to project pr farak to padega ..
@@kabir1934 Bhai tu dekh liyo khud.
Btw Paisa allot ek baar mei nhi hota
Also, Congress Govt Freebies in Karnataka made a fiscal surplus state into fiscally deficit lol
Maharashtra will join soon
Cannot wait for this to become operational and construction of more routes to be started.
Love from WB ❤️😍 Jai Hind 🇮🇳🇮🇳 humare yaha bhi banao yaar, kab tak wait karein 😅😅
Good work done
😊 keep it up
Very slow motion construction 😅 facts
Good job! Even though it is delayed compared to the initial project, looks like it has a good progression. I did not know that China was helping with their machine and technology to build these viaducts, I think it is a good choice to advance quickly.
Are you from China ?
that machine devloped by indian Contruction company L & T and yes its not a chinese technology for your information its a german technolgy invented by a german in 1960s and its slowly got upgraded by time ! so for now only five countries have this tech ! germany , spain,korea,china, india
Impressive works, such updates must be provided by all the undertaking projects in India
magnificent. Eagerly waiting...
Love ❤️ from south Gujarat 😊
Where is the October update
From Ahmedabad to Delhi , From Mumbai to Pune to Hyderabad , From Mumbai to Goa to Mangalore ❤
Hum hain rahi pyar ke, hum hain rahi pyar ke
Aur usme kheti ki kitni jamin jayegi bhai usse achcha hai plane ka bhada sasta kar do
@@adm.721
Agricultural land is not what determines production
It's the adoption of mechanisation that increases the productivity of land
BTW, plane travel is costly and contributes to climate change
You are not very bright
@@adm.721 plane baap ka hai kya ? Price sasta kar do 😂 ? Khud hi plane lele phir 😂 bullet train eco friendly hai oil se nhi chalti
@@varoonnone7159 भाई agriculture land hi nahi rahegi to agriculture ugayenge kaha?
Yeah u made my day @nhsrcl
Please extend this line till Delhi / Chandhigarh. Thank you.
Extend till Hyderabad - amaravati -chennai- Banglore
@@hrp4566 hyderabad, bangalore, chennai should get a new line. Push your state govts to go for HSR corridors. If you begin now, construction might begin in the next 10 years.
@@hrp4566Please give some time to expand not only in this city but in entire Bharat😊
nhsrcl ne sunli
kal hi bola tha ki update ke liye taras rhe h aur aaj update bhi de dia
Modi he to mumkin he🎉
Bro are you really a muslim or a hindu using fake name.
What about progress report of Octtober?
I believe if you give balance work report,it will be more useful.
Pl. Don't re-run the sept. Month's video as october's progress report.
Sad to see not even a single inch of track has been laid yet. Viaducts are fine and all, but when will the first section be open?
I think the track laying process is much quicker than the construction that is happening now. They probably don't want to start with the tracks and then have to wait again ...
The bottleneck of finishing on time will be the underwater tunnel anyway ...
Track laying ek din mein 300 se 400 metres per day possible hai with available three track laying machine , agar slow hoga toh aur manga liya jayegaa 😊😊
Thankyou for the update.
Hurry up guys, this is taking a LOTT of time
It seems there is no progress in October month.
The baffles on both sides are actually made of cement, not sound-absorbing material, which causes a lot of noise in the car.
Waiting for this video 😮
Guys can we start a magazine for the diploma and degree holders projecting the monthly (by post offices money), quarterly (by banks money) and annual progress reports (by corporate taxes money) of bullet trains project and beml,rvnl plus bullet train manufacturing records and photos. Plus circulating them to junction stations,railway divisons and railway zones and vande bharat sleeper trains. And attracting the Xth and XIIth class level students via newspapers. So that more and more educated class can be employed in the construction and manufacturing projects.
Building bullet train is insane
Most awaited video 😅
This project would have completed but just because of previous Maharashtra non bjp govt the project got delayed.
Not useful....for maharashtra.
@4.18 what are those houses/ buildings? Are those project settlements or rural settlements so near the line ?
Sound barrier lagaya hai.... station ke pass city banega ,,wo house wale waha sift ho jayenge ,,11 station 11 new city banayenge ,,, tum duniyadari nahi padhe kya ??
rural settlements easily visible.
very good work 👍
When will the next lines be announced
Preliminary work chal rha h already Varanasi Patna Howrah route pe
@@Adi-oc2hd bro what about mysore chennai when wiill they update for that?
Great job
Where is the next update
I want something like that in my country as well.
Dear Achal Khare, would you come work with us in Kyrgyzstan to build a high-speed railway from Almaty to the Fergana Valley?
Indians company are ready , but what about budget . Your government have that much money to build a bullet train project ?
@@Jayant_Singh_Prashar Without the support of the Indian army, we continue to be stuck in one place; there are forces that have been hindering us for more than a year.
Without the support of the Indian army, we continue to be stuck in one place; there are forces that have been hindering us for more than a year.
@@Jayant_Singh_Prashar Если вы русский который предваряется индусом, мы хоти вас разочаровать, у нас для вас нет денег
Uzbek build bullet train but what you kazkis doing@@oshodadep3157
This shows how much work in Maharashtra was intentionally delayed.
JAI HIND,,,
Surat - navsari section ko sqbde pehle poora karna chahiye ,,trainset seva shuru karna chahiye fir dono direction mein ek ek station add karna chahiye ,,, surat navsari section ko yudhdha star pe pehle poora karna chahiye ,,
Surat to bilimora is the priority route
Immediately requires Vande Sleeper train service from Trivandrum central to Mangalore and Trivandrum central to Mysore.
Say to your Karnataka government
@@Jayant_Singh_Prashar Trivandrum is in karnataka?
@@adithyaarun8465metro between two states wtf!
I think he meant Vande metro train
@@Neoluddism im not that one who said that buddy
This is not an update. Every youtuber is posting same 2 month old video.
Kab tak ready ho jayega ?
Virar ka stop kaha gaya??
Bahut hee rapidly work ho raha hai
Why critical phase of project(Maharastra) is never shown in monthly progress status.
Present status report is an eyewash.
Abhi to 1.5 saal hua hai project start hokar Maharashtra me uske pehle to previous govt ne band kara tha
I agree. But I am not asking why progress is less than that of Gujrat.l only expect that work should be expedited and it's ongoing status should be shown. In fact if need be progress in Maharashtra should be enhanced at the cost of Gujrat progress. It will serve no purpose if Gujrat work is completed three years before Maharashtra work. Finding reason for delay is very easy.Crux is to do intelligent planning and re-planning to achieve the goal in time. MODIJI HAI TO MUMKEEN HAI.
@@mustafasoni1879 India ke pass technology nhi hai iska sara Japan pe nirbhar hai abhi unke ispe depend karega kya technology de rahe hai nhsrcl sirf abhi sikh hi rahi hai , agar 2.5 years delay nhi hota to project completion pe hota even land acquisition nhi hua thaa , aur abhi speed se hi ho raha hai bhai latest videos dekh le
@@mustafasoni1879 Maharashtra me rough terrain ke hisab se to thik hi chal raha hai Gujarat jaise plain land nhi hai yaha western Ghats me isliye nhsrcl ne thane to pune wala line tha cancel kar diya kyuki project cost bohot badh jata
Can anyone give the status of 7 mountain tunnel and 4 river bridges in Maharashta and its time bound process plan. This is more of quantitative work than technological.what is status of@4000 piers?. No such reports are given Ln monthly report. What is use of playing progress film in which more than 50 % is same as last month's film.
Innaugration date toh bata do.
Bold NHSRCL BOLD
Good work
Dear sir
Singal lane track hai
Ya double lane tracks
Uper se samajh me nahi aa raha hai
Edfc wdfc ko dekh kar bahut garv ho raha hai, aur ab bullet train ka besabari intjaar hai ।।
देश का मेल भारतीय रेल 🙏🇮🇳🇮🇳🇮🇳🇮🇳❤️❤️
Double
@@jaguarunleashed4935 bhai ye elevated h to future me expand krne me problem hogi na ?
@@OmPathak-bi8jlnahi bhai dikkat nahi hogi. Bilkul apni metro trains jaisa system hota hai bullet trains ka bhi.
Why NHSRCL website is not working?
W project
कब तक पुरा होगा इसका काम?
❤❤
Very complex project , great work
I also want to work in these project how can I work in these project?
Go to thay work station and ask for work😂@@adm.721
On all these progress, looks like it will open on 2028-2030
2028 end ka completion bol rhe hain according to google news articles
elections are in 2029! so 2028-2029 before election they will complete and launch it
2029 election se pehle launch hoga 😮
If you have some fund... Invest in Diva - Dombivali !!
No updates monthly reports means No progress 🧐🤔
is the line double or loop lines?
Double
👌👌👌
Stop this project - Pappu Gandhi
Kitne din main tutega wo batao😂😂
Imagine if this project was given to china ! 🤔
Why can't we have this in the US 🥲
We're quite a bit slower, but it's happening! There's some really good construction updates for the California High-speed Rail project with a drone flyover on the Jason Dronin Around youtube channel.
Bahut kaam baki hai😢
🚅🚅Although Japanese engineering is number one,, but exterior design of a bullet train I like GERMAN ICE4 and Italian Italo designs of the trains than Japanese bullet train
I see, those designs are definetly good looking. HOw about the shunkansen 500 series those kinda look similar
Bullet train in Indonesia is also best than Japan and Europe
Shinkansen is beautiful, the european designs are old.
Patri bana rahe h train to south korea ya japan se karid k layenge . Desh ko koi ummid nhi inse
For your kind information ...All rail are made by SAIL(steel authority of India) in India ....
Modi government dwara desh ka pehela aisa project h jo samay se pehle pura ho rha h .. RRTS ... isme bhi kejriwal tang ladya tha delhi government ke hisse ka paisa nhi de rha tha lekin fir bhi project delay nhi hua . Yha tk ki bich me corona bhi aa gya tha ..
i dont understand one thing , are there going be be only 2 tracks, when we see any china hsr video , we see 10-15 tracks , where there are many trains , some travel at 400 km/hr and some at 230 km/hr depending on the price, should we have done the sam thing?
Do you mean 10-15 throughout the alignment or only near the stations
Bhai mainly 2 ya max to max 3 he tracks hote hai , jo tune dekhe hai woh railway station yah railway depot k pass wala video dekha hoga . 8-10 tracks possible hai but jada practical nahi hoga as utni traffic nahi hoti hai tracks par .
However it will become realty 2050
Ja ha jarurat thi va modi gujrat ke hai bullet train nahi delhi me bullet train ki jyada jarurat thi delhi mumbai se jyada dur hai lekin to bhi gujrat me jaha jyada jarurat nahi thi va bullet train ladi nahi to mai aram ae delhi se mumbai japata lekin modi ji gujrat ke hai to phele gujrat me modi hai to mumkin hai gujrat delhi nahi 😅
Kam se kam 1 saal tak nahi baithunga in trains me.
Pata nahi kis tarah ka kaam hua hoga, kitne paise khaye honge. 1 saal tak sab safe raha tab hi try karunga.
There are so many people in India who don't want development, I don't know why, that's why our country is not developing, because our minds are not developed yet, we all want to live a poor life, such a big project is going and even after that some people want to disrespect our country and country
projects. Such a idiot people.
Narendra Modi will again win in 2029 wait.
😂😂😂 dude
Agar 1 hi saal tak chal paye aisa bana hoga to
first view
No track work😮😮
There are so many people in India who don't want development, I don't know why, that's why our country is not developing, because our minds are not developed yet, we all want to live a poor life, such a big project is going and even after that some people want to disrespect our country and country
projects. Such a idiot people.
Narendra Modi will again win in 2029 wait.
W
Haan saare development Mumbai, Gujarat me hi karo.. Phir Bolte Bihari Majdoor Yaha kyu aate hain 😌
2050..in making 😂
There are so many people in India who don't want development, I don't know why, that's why our country is not developing, because our minds are not developed yet, we all want to live a poor life, such a big project is going and even after that some people want to disrespect our country and country
projects. Such a idiot people.
Narendra Modi will again win in 2029 wait.
Kuch to nya kro bharat srkaar kisi desh ki itne saal purani train ko lekar abhi tak sirf ptri hi bicha rhe ho waah
There are so many people in India who don't want development, I don't know why, that's why our country is not developing, because our minds are not developed yet, we all want to live a poor life, such a big project is going and even after that some people want to disrespect our country and country
projects. Such a idiot people.
Narendra Modi will again win in 2029 wait.
Virar
Nice analysis 👍
Elon Musk will reach mars before completion of this project🤣🤣🤣
Musk's investors invested more money on rocket project though 😏.
There are so many people in India who don't want development, I don't know why, that's why our country is not developing, because our minds are not developed yet, we all want to live a poor life, such a big project is going and even after that some people want to disrespect our country and country
projects. Such a idiot people.
Narendra Modi will again win in 2029 wait.
y only four stop in maharastra . its useless . y not pune nashik train . pawns curse u all
Is this a single line track? Most of the sections looks like having only a single track. Can anyone clarify please?
No ,two tracks
2027? or 2028 fir full line connectivity !!
Very slow work
Old format was better
I am empressed...
But Pura project 2030 se pahle complete nahi hoga.
Bullet train ke passenger load ke liye express and superfast trains ko band kiya jayegaa
Likh ke rakh lijiyega
Tandh rather 2028 tak aaram se ho jayega
2029 election se pehle launch hoga 😂
Ye jo kam hua h 2 salo me hi hua h
Baki 6 saal se kuch nhi tha
anyways agar BJP haar gayi toh phir se 2-3 saal ka delay ho jayega!!
Atleast it will take 2028 to be operational
This project is expected to take another 50 years to complete
Maybe 100 years also😅
Congress govt nhi hai 😂 pappu already Maharashtra me akar tum logo ne 2.5 waste kar diya tha 😂
There are so many people in India who don't want development, I don't know why, that's why our country is not developing, because our minds are not developed yet, we all want to live a poor life, such a big project is going and even after that some people want to disrespect our country and country
projects. Such a idiot people.
Narendra Modi will again win in 2029 wait.
There are so many people in India who don't want development, I don't know why, that's why our country is not developing, because our minds are not developed yet, we all want to live a poor life, such a big project is going and even after that some people want to disrespect our country and country
projects. Such a idiot people.
Narendra Modi will again win in 2029 wait.
China high speed rail network 2007 - 2021, 40000km
India supper high-speed t0tal rail network 70000 km ,😂😂😂😂
China = dictatorship no one oppose
India = democracy 🤡 aur ha dictator ship ke naam pe tere abbu hi ro raha thaa😂
There are so many people in India who don't want development, I don't know why, that's why our country is not developing, because our minds are not developed yet, we all want to live a poor life, such a big project is going and even after that some people want to disrespect our country and country
projects. Such a idiot people.
Narendra Modi will again win in 2029 wait.