Checking level of slab and beam bottom using AUTO LEVEL | Slab Checking

Поделиться
HTML-код
  • Опубликовано: 22 дек 2024

Комментарии • 82

  • @SagarDijen
    @SagarDijen 3 месяца назад

    This video is awesome
    Because, Basic concept's has included
    👍👍👍👍👍
    Please make more videos like this....

  • @hakemkhan3165
    @hakemkhan3165 4 года назад +1

    Wow..really informative with theoretical explanation

  • @sarthakmohapatra3738
    @sarthakmohapatra3738 4 года назад +1

    Exceptional video sir. U r a life saver. Thnx

  • @Avinashjadhav-qx2fr
    @Avinashjadhav-qx2fr Год назад

    Best teaching technique sir... thank u so much😊

  • @empoweracademy1322
    @empoweracademy1322 3 года назад +1

    Very nicely explained.....Keep up the good work.

  • @raffiehydermirza1803
    @raffiehydermirza1803 4 года назад

    The best video of levelling. Thanks a lot bhai. Make more videos and help us

    • @EverythingCivil
      @EverythingCivil  4 года назад +1

      Thanks..pls share.
      Yes will make on any topic u can recommend.

    • @raffiehydermirza1803
      @raffiehydermirza1803 4 года назад

      @@EverythingCivil make videos on leveling bhai like how to take excavation of footings through autolevel and how to transfer the levels etc; with drawings

  • @modassariqbal306
    @modassariqbal306 4 года назад +2

    Awesome videos sir 👌

  • @lostworld1462
    @lostworld1462 4 года назад +2

    Really informative

  • @soumyaranjanpradhan6264
    @soumyaranjanpradhan6264 4 года назад +1

    Very informative video... carry on brother

    • @EverythingCivil
      @EverythingCivil  4 года назад

      Keep supporting 🙏

    • @soumyaranjanpradhan6264
      @soumyaranjanpradhan6264 4 года назад

      Bro make a video about material reconcilation...and what is the allowable wastage limmit given by the company

    • @EverythingCivil
      @EverythingCivil  4 года назад +1

      Okay bro will make a video on it.

  • @smileplease3600
    @smileplease3600 4 года назад +2

    Bro ek baar sankan area k baare bi bta dte....kynki sakan area k bich m kyi baar ek beam ata h to uska size nhi dia hota h....to uski side nikalne m thora confesse ho jate h....

  • @pradippawar1709
    @pradippawar1709 4 года назад

    Very nice explained
    Sir plz explain the first level is to be taken while excavation by TBM

  • @gaganpatidar9907
    @gaganpatidar9907 4 года назад +1

    very informative sir, can u share the size of shear walls, beams and columns with number of reinforcement. So we can idea about sizes of members for 20 storied building.

  • @t.sstatus0198
    @t.sstatus0198 Год назад

    Sir auto level upper stidia se lower stidia ka distance kitna hoga?

  • @badalgallery
    @badalgallery 4 года назад +2

    What should be casting level of coloum..It's ok if column casting level is above the bottom of beam shuttering.

    • @EverythingCivil
      @EverythingCivil  4 года назад +1

      Yes it should be atleast 3-4 inches above beam bottom level.

    • @badalgallery
      @badalgallery 4 года назад +1

      If column casting is above shuttering level of beam then cover under beam will increase in comparison of column buz bottom bar will rest on column ..Is it ok??

    • @EverythingCivil
      @EverythingCivil  4 года назад +2

      Yes. You are absolutely right.. we must make sure that beam bar is straight and column casting to be done such that required cover is available below the bottom bar.

    • @srisidhu5329
      @srisidhu5329 3 года назад

      @@EverythingCivil you should have done on slab leveling..

  • @saitulaseeramm1047
    @saitulaseeramm1047 4 года назад +1

    Thank you sir... Well explained, keep posting like this

  • @alphamaverick4537
    @alphamaverick4537 Год назад

    Informative⚡

  • @swapnilgaikwad7703
    @swapnilgaikwad7703 3 года назад

    Very very important video sir thank you

  • @letslearntv2692
    @letslearntv2692 8 месяцев назад

    But how you put staff from 105 lvl in column when shuttering is already done to check level to take RL.

  • @princemohanty6936
    @princemohanty6936 Год назад

    Thanku sir 🙏🙏

  • @DilshadKhan-601
    @DilshadKhan-601 Год назад

    Very helpful video than you sir

  • @takeiteasesolutionchannel6956
    @takeiteasesolutionchannel6956 3 месяца назад

    Tq bro nice explanation

  • @saqibhussain5208
    @saqibhussain5208 2 года назад

    thank you sooo much very informative lecture.

  • @nileshsonawane324
    @nileshsonawane324 4 года назад

    Natural ground level ko 100rl liya hai kya sir...

  • @minhajraja9809
    @minhajraja9809 3 года назад

    Best video clearly

  • @modassariqbal306
    @modassariqbal306 4 года назад +1

    Sir staff ko kaise read krte hai..us p v please 1 video banaye sir

  • @flywithzunera
    @flywithzunera 4 года назад +1

    Bhai 10000000 likes ka option kash hota

  • @MuhammadKamran-bx8ks
    @MuhammadKamran-bx8ks 3 года назад +1

    Good👍

  • @rahulchandravansi4557
    @rahulchandravansi4557 Год назад

    Sr bbs sikha dijiye jisase ekdam easy way me building ke sare drawing reading aur construction work bhi

  • @ahmedfaiz1844
    @ahmedfaiz1844 4 года назад +1

    Sir, I have small doubt plz clear me, as you mention your first slab level is 103.7m and u have transferred temporary RL on a column that is 105.20, as u said we can transfer it through the tape simply by adding 1.5 mts from 103.7 slab level we get 105.20, my doubt is if we are working with auto level plz correct if my calculation is wrong, either I have to do, keeping staff on slab level we get some value let us example I am taking here 2.00m staff reading then the calculation must be (103.7+2.00=105.7) then we have to see 2.00mts from the staff and mark the point 105.7 as temporary RL right sir plz correct me or I have to assume directly 105.20 and then subtracting with 103.7 the value which we get should be marked by auto level plz correct me, and sir my one more doubt is as u got RL of the line of sight is 108.20mts on top of slab from your last temporary RL, and after marking this point anywhere on top of the slab, and as u said by subtracting from slab bottom level we get 1.05 and we have cross check through auto level but one of my SR.engineer first he use take height of instrument that is for example from your reference point (108.20 + staff reading) - slab bottom level) the value which he gets he use to cross-check and from that he used to correct slab level, sir plz don't mind I am a fresher civil engineer so that's the reason I have asked my doubt, plz clear my doubts, overall the information u shared is helpful, thank you.

  • @nandkumarmestry2632
    @nandkumarmestry2632 8 месяцев назад

    slab casting ek din me pura nahi ho to dusare din banate samay kya care lene chahiye

  • @msprojectplanning
    @msprojectplanning Год назад

    Hero❤

  • @abdulkareem-kg8jn
    @abdulkareem-kg8jn 2 года назад

    sir. very thanks

  • @sonugupta7593
    @sonugupta7593 3 года назад

    Ya bhi bt do Beam ka bottom kitne per lagta hai yah kaise pata Karen plz reply dijiyega

    • @EverythingCivil
      @EverythingCivil  3 года назад

      Apko kya janna hai detail me bataiye apko answer karta hu mai.

    • @sonugupta7593
      @sonugupta7593 3 года назад

      @@EverythingCivil building ki slab dalti hai Kuchh shuttering hoti hai na bheem ka bottom hota hai vah kaise decide hota hai kitni height per lagega Mujhe Janna hai Janna hai

    • @sonugupta7593
      @sonugupta7593 3 года назад

      @@EverythingCivil beam bottom kitne hight per lagega kaise pata Karen

    • @EverythingCivil
      @EverythingCivil  3 года назад

      Pehle ap check karo ke apki floor to floor height kitni hai aur dekho ke beam depth kitni hai..samjho ke beam depth 500mm hai to apka beam bottom slab ke level se 500m down baithega column pe

    • @sonugupta7593
      @sonugupta7593 3 года назад

      @@EverythingCivil video Kyon Nahin banate sir

  • @SiyakantChaudhary-xg9dl
    @SiyakantChaudhary-xg9dl Год назад

    Good sir

  • @animeshadak3271
    @animeshadak3271 4 года назад +1

    COLOUMN ME JO RL FIX KIYA WO KAYSE KIYA?

    • @EverythingCivil
      @EverythingCivil  4 года назад

      Project ka temporary benchmark ke hisab se hai..GL ko 100 RL lete hai.

  • @raffiehydermirza1803
    @raffiehydermirza1803 4 года назад

    Make a video on excavation of footings too with auto level with a drawing shown as example

  • @hdplanet7279
    @hdplanet7279 2 года назад

    Nice video

  • @piyushraut2864
    @piyushraut2864 3 года назад

    Thank u so much sir

  • @sunitashrestha9710
    @sunitashrestha9710 3 года назад +1

    Last is rl transfer then levelling

  • @bhagwatmane1668
    @bhagwatmane1668 Год назад

    niceee broo

  • @vikash3200
    @vikash3200 4 года назад

    Shuttering ke bad column se S1 slab ka RL kase lenge

    • @EverythingCivil
      @EverythingCivil  4 года назад

      Niche ke column pe level marking hogi waha se utahyege upar ke reinforce bar pe aur waha se baki slab ka level hoga

    • @vikash3200
      @vikash3200 4 года назад

      @@EverythingCivil shuttering ke pahle

    • @EverythingCivil
      @EverythingCivil  4 года назад

      Find out height of slab bottom level from column marking then accordingly mark that level on reinforcement bar..

  • @sibanandpradhan7535
    @sibanandpradhan7535 3 года назад

    Thanks

  • @badalgallery
    @badalgallery 4 года назад +1

    Nice

  • @sarthakmohapatra3738
    @sarthakmohapatra3738 4 года назад

    Super

  • @mohammadvahid1318
    @mohammadvahid1318 3 года назад

    Site p full detail m video bnao

  • @KundanKumar-wx9gk
    @KundanKumar-wx9gk Год назад

    Bhai aapne achche se Sam jhaye

  • @dennisngugi748
    @dennisngugi748 Год назад

    Bring us the English version

  • @amirahmadkhan1686
    @amirahmadkhan1686 2 года назад

    جناب فٹ کے حساب سے کرو

  • @shubhamkasat9688
    @shubhamkasat9688 3 года назад

    You depicted a wrong method.The level marking on column can't be taken from the slab level of 103.7 meter. You have to transfer TBM using auto level. TBM should be accurately defined. In your case, can you guarantee that the slab is accurately poured at 103.7 meter ? Answer is NO. Slab pour may be tight or slack from the actual 103.7 meter, which will only lead to uneven transfer of 105.2 meter on every column and eventually would lead to uneven level of upper slab and beam bottom shuttering. TBM may have to be shifted from the bottom floor. For that we have to calculate H.I.= R.L.(known) + Staff reading(from auto level). Then, your desired 105.2 m or any reading to be marked on column can be taken using auto level as you will already know staff reading needed to achieve TBM of 105.2 meter. H.I. - 105.2 = Staff reading (to be marked on column using staff and auto level). And you haven't even used auto level, simply measuring tape. Dude, please don't teach the wrong method, you may as well land engineer's into serious trouble.

    • @EverythingCivil
      @EverythingCivil  3 года назад

      Below ground for the first time level marking is done with the reference to the T.B.M and after that is done once level marking is done on upper columns by transferring it from the level marking of below column.