Zenith CH 750 CuZer Build ... Match Drilling Lt Wing, LaZer and Dog Bone .. part 18
HTML-код
- Опубликовано: 2 апр 2024
- I love getting to the place you can stop thinking and just work on the wing. Making a hatch, drilling spar and laser setup.
Развлечения
great video keep them coming
Thank you! I will, right up till I fly her. Maybe some on flight training also.
i thought all the holes were matched drilled to the correct size by ZENAIR
Yeah, that would be nice. This method they use makes it so you can do the final adjustment in case everything‘s off just a little you can take twist out and do the final drill on the main spar and make everything even. It’s really nice if you think about it. Also it probably has some to do with the 51% rule. Thanks for watching blue skies
@@DennisZylstra hi thanks for the reply its just that i have been watching their factory videos where they clicko a plane together saying all holes are matched drilled